Page 1: Third Planning Board Hearing Cushing Village Belmont, MA

Cushing VillageBelmont, MA

Welcome to Cushing Village

1

PLANNING BOARD PRESENTATION IIIMar 27, 2012

Page 2: Third Planning Board Hearing Cushing Village Belmont, MA

Cushing VillageBelmont, MA

• We increased the stepping away from the residential district at the upper levels.

• We deleted the highest level of the Hyland.

• We will redesign the Hyland to respond better to abutting residential district.

• We propose to make changes to the Pomona and the Winslow to reduce their visual mass.

Planning Board Presentation 27 MAR 2012

Revised Residential Setbacks

2

Page 3: Third Planning Board Hearing Cushing Village Belmont, MA

Cushing VillageBelmont, MA

3

Building Mass and Setback

The Hyland at Belmont St.

#569 Belmont St.

Disliked aesthetics of the Hyland.-We will redesign using neighborhoodforms and reduced massing.

Too high; gives perception of five stories.

Stepping back not sufficient;too much mass.

Too much of a flat wall.

Issues

Page 4: Third Planning Board Hearing Cushing Village Belmont, MA

Cushing VillageBelmont, MA

4

Massing at Neighbors

569 Belmont St.

Locus

SB

28’

50’

20’

PL

Site Section - Proposed

12’ 12’20’SB

PL

Site Section - Previous

Page 5: Third Planning Board Hearing Cushing Village Belmont, MA

Cushing VillageBelmont, MA

20’28’

50’

12

3

Rear Setbacks – Proposed

20’ SB

5

Massing at Neighbors

16 Horne Rd.

20’ 12’12’

PL

1S

T fl

2n

d & 3

rd f

l4

th f

l

Rear Setbacks – Previous

Page 6: Third Planning Board Hearing Cushing Village Belmont, MA

Cushing VillageBelmont, MA

6

Building Mass and Setback

#16 Horne Rd.

Remove highest level

Insufficient Stepping

The Hyland on Horne Rd.

Issues

Page 7: Third Planning Board Hearing Cushing Village Belmont, MA

Cushing VillageBelmont, MA

7

Massing at Neighbors

16 Horne Rd.

30’ 29’-34’

PL

Site Section - Previous

26’

Site Section - Proposed

47’

20’

PL

61’

Page 8: Third Planning Board Hearing Cushing Village Belmont, MA

Cushing VillageBelmont, MA

8

Massing at Neighbors

16 Horne Rd.

29’

34’ 30’

Rear Setbacks – Previous

61’26’47’

20’ SB20’

1234

Rear Setbacks – Proposed

Page 9: Third Planning Board Hearing Cushing Village Belmont, MA

Cushing VillageBelmont, MA

9

Building Mass and Setback

Insufficient stepping at the 4th floor.

The Pomona on Horne Rd.

Issue

Page 10: Third Planning Board Hearing Cushing Village Belmont, MA

Cushing VillageBelmont, MA

10

Massing at Neighbors

13 Horne Rd.

50’ to 60’

PL

20’

SB

Site Section - Proposed

LocusSite Section - Previous

45.5’ to 55.5’

PL

20’

SB

Page 11: Third Planning Board Hearing Cushing Village Belmont, MA

Cushing VillageBelmont, MA

11

Massing at Neighbors

13 Horne Rd.

50’

Site Plan Detail – Proposed

60’

Site Plan Detail – Previous

55’45’

Page 12: Third Planning Board Hearing Cushing Village Belmont, MA

Cushing VillageBelmont, MA

12

Building Mass and Setback

The Pomona

Building too imposing.

Issues

Dislike tower. Too tall.

Previous Common St Elevation

Lower parapet by approx. min 5’

Proposed Common St Elevation

Redesign or remove tower.

Page 13: Third Planning Board Hearing Cushing Village Belmont, MA

Cushing VillageBelmont, MA

13

Building Mass and Setback

Issues

4th story at gable ends.

Resolve awkward geometries and openflat roof.

The Winslow at Williston Rd.

Page 14: Third Planning Board Hearing Cushing Village Belmont, MA

Cushing VillageBelmont, MA

14

Building Mass and Setback

The Winslow

Issue

No step down at gable end. (both ends)

PL

7.5’MIN

Previous Trapelo Rd Elevation

Lower gable and reduce mass (both ends).

PL

11.5’MIN

Proposed Trapelo Rd Elevation

Page 15: Third Planning Board Hearing Cushing Village Belmont, MA

Cushing VillageBelmont, MA

• Go through each building design to comply with setbacks proposed.

• Revise the buildings aesthetically, especially the Hyland.

• Revise the site plan to correspond to the revised buildings with an eye to delineating more civic space.

Key Points to Note

Steps ahead

15

• More on the Hyland…