Thermal Hydrolysis:
The Ins and Outs, Ups and DownsDecember 3, 2015
![Page 2: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/2.jpg)
Agenda
• What is THP?
• What are some types of THP?
• What situations is THP beneficial?
• Where is THP installed?
• Where in the US is using THP?
• Benefits
• Drawbacks
• Operational considerations
• Example analysis
• Wrap up
![Page 3: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/3.jpg)
What Should You Learn From This?
• What is THP?
• How can it be incorporated?
• When might it be considered?
• What should be thought through?
• What an example analysis might look like?
![Page 4: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/4.jpg)
What is THP?
![Page 5: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/5.jpg)
Before We Talk THP…Lets Talk Digestion
Volatile Solids Soluble Organics, Gases
Volatile Solids Reduction (VSR)
![Page 6: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/6.jpg)
THP = Thermal Hydrolysis Process
• Heat
• ~330oF
• Pressure
• 90 to 130 psi
• Time
• 20 to 30 minutes
• Cell lysis
• COD solubilization
• Class A via time/
temperature
• Preheated material
for digestion
![Page 7: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/7.jpg)
Pressure Cooking the Sludge
![Page 8: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/8.jpg)
What Are Some
Types of THP?
![Page 9: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/9.jpg)
Batch Treatment - CAMBI
![Page 10: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/10.jpg)
Batch Treatment - BioThelys
![Page 11: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/11.jpg)
Continuous Treatment - Exelys
![Page 12: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/12.jpg)
Continuous Treatment - TurboTec
![Page 13: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/13.jpg)
Continuous Treatment - Haarslev
![Page 14: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/14.jpg)
Location in Overall Process
• Full pretreatment
• WAS-only pretreatment
• Intra-digestion treatment
• Post-digestion treatment
![Page 15: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/15.jpg)
Full Pretreatment
CAKE SILO
PS
SLUDGE SCREENS
SLUDGE STORAGE
PRE DEWATERING THERMAL
HYDROLYSIS
COOLERS
DIGESTERSDIGESTED SLUDGE
STORAGE & DEGASSING
DEWATERING
CAKE SILO
WAS THICKENING
ELECTRICITY
GAS CLEAN UP
BIOGAS
BIOGASBOILERS
STEAM
GASSTORAGE
WAS
BLENDEDSLUDGE WASTE
HEAT
CHPENGINES
![Page 16: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/16.jpg)
WAS Only Pretreatment
CAKE SILO
PS
SLUDGE SCREENS
SLUDGE STORAGE
PRE DEWATERING THERMAL
HYDROLYSIS
COOLERS
DIGESTERSDIGESTED SLUDGE
STORAGE & DEGASSING
DEWATERING
CAKE SILO
WAS THICKENING
ELECTRICITY
GAS CLEAN UP
BIOGAS
BIOGASBOILERS
STEAM
GASSTORAGE
WAS
WASTEHEAT
CHPENGINES
![Page 17: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/17.jpg)
Intra-Digestion TreatmentVeolia DLD Approach
![Page 18: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/18.jpg)
Post Digestion TreatmentCAMBI SolidStream
![Page 19: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/19.jpg)
How Do the Various Configurations Compare
Conventional
Digestion
Full
Pretreatment
WAS Only
Pretreatment
Intra
Digestion
Treatment
Post
Digestion
Treatment
Relative
THP Size
(approx.)
0% 100% 40% 60% 60%
Relative
Digester
Volume
Required
(approx.)
100% 33% 60% 60% 100%
VSR
(approx.)45% 60% 55% 65% 55%
Relative
Gas
Yield
(approx.)
100% 133% 125% 150% 130%
![Page 20: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/20.jpg)
What Situations is
THP Beneficial?
![Page 21: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/21.jpg)
When to Consider THP?
• Capacity expansion
• Waste-to-energy project
• Hauling limitations
• Storage limitations
![Page 22: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/22.jpg)
Capacity Expansions
• Reduced viscosity allows for thicker (9-12% TS)
feed to digestion process
![Page 23: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/23.jpg)
Digestion Process Impacts
Conventional Digestion
• 10,000 lb/day
• 4.5% TS feed
• 26,650 gpd
• 0.38 lb/gal
THP Digestion
• 10,000 lb/day
• 9.0% TS feed
• 13,325 gpd
• 0.75 lb/gal
![Page 24: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/24.jpg)
Waste To Energy Projects
• Increase VSR
• Mostly of WAS
• More VSR = more digester gas
![Page 25: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/25.jpg)
Hauling Limitations
• Increased VSR = less dry mass
• Increased dewaterability = less water in cake
• Results in fewer truck loads to be hauled away
![Page 26: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/26.jpg)
Storage Limitations
• THP cake is:
• Stackable
• Stable
• Dry
• And has minimal odor
![Page 27: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/27.jpg)
Where is THP
Installed?
![Page 28: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/28.jpg)
THP Facilities Worldwide
Vendor Operating
Facilities
Facilities Under
Construction
Cambi 35 17
Veolia - Exelys 1 2
Veolia - Biothelys 5 2
Sustec - TurboTec 1 1
Haarslev 2 0
![Page 29: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/29.jpg)
Where Are These Facilities
• Europe
• Japan
• China
• Germany
• France
• South America
![Page 30: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/30.jpg)
Where in the US is
Using THP?
![Page 31: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/31.jpg)
Planned US THP Facilities
DC Water Blue Plains AWTP
370 mgd
HRSD Atlantic WWTP
54 mgd
City of Raleigh
75 mgd
Franklin, TN
16 mgd
San Francisco
57 mgd
Trinity River
162 mgd
![Page 32: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/32.jpg)
Benefits
![Page 33: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/33.jpg)
Optimize Digestion Capacity
• Maximize use of existing infrastructure
• Reduce expansion requirements
• Co-digestion
![Page 34: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/34.jpg)
Dry Mass Reduction
![Page 35: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/35.jpg)
DewaterabilityFor a 50,000 lb total weight truck load…
1% point increase in solids
concentration enables 500 lbs of water
to be replaced with solids in each truck
![Page 36: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/36.jpg)
Digester Gas Production
![Page 37: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/37.jpg)
Digester Gas Production
• But more gas may only be desirable if there is a
beneficial use
![Page 38: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/38.jpg)
Drawbacks
![Page 39: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/39.jpg)
Additional Facilities
• Pretreatment – screening and dewatering
![Page 40: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/40.jpg)
Multiple Solids Pumping Steps Possible
• Screen feed
• Pre-dewatering feed
• THP feed
• Intra-THP pumping (if applicable)
• Digester feed
• Digester mixing (if applicable)
• Digested sludge blending
• Final dewatering feed
![Page 41: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/41.jpg)
Operational
Considerations
![Page 42: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/42.jpg)
Operational Considerations
• Redundancy requirements
• Sidestream strength
• Sludge cooling
• Dilution water
• High pressure steam
• “Foaming” and RVE potential
• Polymer dispersion
![Page 43: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/43.jpg)
Redundancy Requirements
• What is likely to need redundancy?
• Pumps – routine maintenance
• Vessels – annual inspections
• Steam system – no steam means no THP
• Possible approaches
• Pumps – duty/standby
• Vessels – storage or short term alternative processing
• Steam system – duty/standby
![Page 44: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/44.jpg)
Sidestream Strength
• Better digestion = increased release of N and P
into soluble forms
• High temperature can produce refractory (non-
biodegradable) N and P compounds
• Can impact the color of the sidestream =
impacts to UV disinfection
![Page 45: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/45.jpg)
Sludge Cooling
![Page 46: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/46.jpg)
Dilution Water
THPCooling
Digestion
12-15%TS,
Pathogen Free
Material
Dilution/Initial
Cooling Water
Target ~9%TS,
Pathogen Free
Material
NEED PATHOGEN
FREE DILUTION
WATER SOURCE
![Page 47: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/47.jpg)
High Pressure Steam
![Page 48: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/48.jpg)
Rapid Volume Expansion
• Rapid drop in specific gravity of digester contents
• Same solids mass + lower S.G. = larger volume
• Potential causes:
• Sudden pressure drop in headspace
• Sudden change in mixing intensity
• Sudden change in temperature
• Sudden change in available “food”
• Anything to result in more gas production without a means to allow the gas to escape
• Can be exacerbated by biological foaming
![Page 49: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/49.jpg)
Polymer Dispersion
Floc tank for
polymer/sludge
mixing before
dewatering
![Page 50: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/50.jpg)
Example Analysis
![Page 51: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/51.jpg)
Sample Facility
• Currently a 10 mgd (AA) facility – looking at
expansion to 20 mgd (AA)
• Strict N and P liquid stream discharge
requirements
• Existing anaerobic digestion for current capacity
• Existing digester gas utilization = hot water
boilers
• 4.5% blended solids feed to digesters
![Page 52: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/52.jpg)
What Was Considered for Capital Costs
Without THP With THP
New digestion capacity (2x) PS/TWAS blend tank
New digester heating system Sludge screening
Gas handling system Screened sludge tank
New digester control building Pre-dewatering
Dewatering feed pumps Cake hopper(s)
CHP system (1.0 MW) THP system
Gas treatment Steam boiler system
Screening/dewatering building
CHP system (1.2 MW)
Gas treatment
![Page 53: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/53.jpg)
Capital Cost Comparison
• Many site-specific considerations
• Rock blasting
• Piping lengths
• Roadways
• Hydraulic grade in digesters in relation to site topography
• Approximately $700,000 difference in estimated
capital costs
Without THP With THP
$36.3 million $37.0 million
![Page 54: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/54.jpg)
So Why Look at THP?Annual Costs…
Without THP With THP
Electricity Consumed (kWh/yr) 2,200,000 2,200,000
Electricity Produced (kWh/yr)
(assume engine generator)8,800,000 10,300,000
Pre-Dewatering Polymer (active
lbs/yr)0 91,000
Cake Wet Mass (wet tons/year) 32,500 17,400
Additional O&M Labor (FTE) 2 2
CHP System O&M ($/year) $220,000 $260,000
Dewatering Polymer (active lbs/yr) 171,000 137,000
![Page 55: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/55.jpg)
So Why Look at THP?Annual Costs…
Without THP With THP
Total Annual Costs $2,130,000 $1,740,000
Less than 5 year payback on capital cost
![Page 56: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/56.jpg)
Wrap Up
![Page 57: Thermal Hydrolysis: The Ins and Outs, Ups and Downs · Waste To Energy Projects ... New digester control building Pre-dewatering Dewatering feed pumps Cake hopper(s) CHP system (1.0](https://reader033.vdocuments.us/reader033/viewer/2022050511/5f9b7755ee60df422f38ebd4/html5/thumbnails/57.jpg)
What Should You Know Now?
• What is THP?
• How can it be incorporated?
• When might it be considered?
• What should be thought through?
• What an example analysis might look like?