THEMIS MRR I&T − 1 GSFC, January 5, 2007
Integration and Test
THEMIS MRR I&T − 2 GSFC, January 5, 2007
Integration Agenda
Recent Activities• Environmental Tests Completed• Delivery to Astrotech• Probe Processing• Fueling Preparations• Carrier Processing
Probe and Instrument Status• Instrument Status and Remaining Items• Probe Status and Remaining Items• Integration Plan
Review Process • RFAs in Work• Reviews Ahead
THEMIS MRR I&T − 3 GSFC, January 5, 2007
Environments
Thermal Vacuum
Acoustics
Spin Balance
EMC
VibrationMagnetics
THEMIS MRR I&T − 4 GSFC, January 5, 2007
Probe Processing
Bolt Cutter Installation
Performance Tests
Solar Array Illumination
Delivery to ASO
THEMIS MRR I&T − 5 GSFC, January 5, 2007
Probe Fueling Preps
FM2/FM3 Thermal Vacuum
Vibration
Thermal Vacuum
Acoustics Spin Balance
Storage
Dry Weigh & Pressurize Ready for Fuel
THEMIS MRR I&T − 6 GSFC, January 5, 2007
Carrier Processing
Vibration Acoustics Spin Balance
Storage
PC Unload
SSS Installation
Ready for Probes
THEMIS MRR I&T − 7 GSFC, January 5, 2007
Instrument Status
Instrument Status Flight Hardware Ready Flight Software Ready
Recent Activities
Performance Test
Remaining Items ESC Verification
SST/ESA Covers EFI Hats Contamination Samples
Instruments F1 F2 F3 F4 F5IDPU Complete Complete Complete Complete CompleteFSW 4.02 4.02 4.02 4.02 4.02EFI Complete Complete Complete Complete CompleteESA Complete Complete Complete Complete CompleteSST Complete Complete Complete Complete CompleteFGM Complete Complete Complete Complete CompleteSCM Complete Complete Complete Complete CompleteMagBoom Complete Complete Complete Complete CompleteIntegration Complete Complete Complete Complete CompleteTest Complete Complete Complete Complete CompleteEMC CompleteTV Complete Complete Complete Complete CompleteMagnetics Complete Complete Complete Complete CompleteESA Recal Complete Complete Complete Complete Complete
IDPU FSW F1 F2 F3 F4 F5Image1 4.02 4.02 4.02 4.02 4.02Image2 4.02 4.02 4.02 4.02 4.02Image3 4.02 4.02 4.02 4.02 4.02Image4 4.02 4.02 4.02 4.02 4.02ETC 5.A 5.B 5.C 5.D 5.EF5.BEB B0-c B0-c B0-c B0-c B0-cF6.BEB B1-c B1-c B1-c B1-c B1-cF7.BEB B2-c B2-c B2-c B2-c B2-cF8.BEB B3-c B3-c B3-c B3-c B3-cF9.DFB D1 D1 D1 D1 D1FA.DAP 12 12 12 12 12
THEMIS MRR I&T − 8 GSFC, January 5, 2007
Probe Status
Probe Status Hardware Complete Software Complete
Recent Activities at ASO Performance Tests Solar Array Illumination RCS Pressurization to
1.1*MEOP Dry Weigh
Remaining Items Fueling Flight Plugs Integrate to PC Attach Sep System
Probe F1 F2 F3 F4 F5Structures Complete Complete Complete Complete CompleteSep Systems Complete Complete Complete Complete CompleteSolar Arrays Complete Complete Complete Complete CompleteBAU 103 101 105 104 102FSW Image 1 V3.19 V3.19 V3.19 V3.19 V3.19FSW Image 2 V3.19 V3.19 V3.19 V3.19 V3.19RTS Complete Complete Complete Complete CompleteRCS Complete Complete Complete Complete CompleteTransponder Complete Complete Complete Complete CompleteAntenna Complete Complete Complete Complete CompleteBattery Complete Complete Complete Complete CompleteHarness Complete Complete Complete Complete CompleteIRU Complete Complete Complete Complete CompleteAEB Complete Complete Complete Complete CompleteBus CPT Complete Complete Complete Complete CompleteCTV Test CompleteInstrument I&T Complete Complete Complete Complete CompleteProbe CPT Complete Complete Complete Complete CompleteEMC CompleteVibration Complete Complete Complete Complete CompleteTV Complete Complete Complete Complete CompleteMagnetics Complete Complete Complete Complete CompleteSpin Balance Complete Complete Complete Complete CompletePressurize Complete Complete Complete Complete CompleteFuel Empty Empty Empty Empty EmptySafing Plugs NonFlight NonFlight NonFlight NonFlight NonFlight
THEMIS MRR I&T − 9 GSFC, January 5, 2007
Integration Flow
Probe Fueling Probe RCS Electr. Verif.
Weigh Wet Probes, Attach Pyro
PCA Funct.Spin Balance
PCA Comm Check @ Blockhouse
Install Pyro Signal SMDC/ Weigh PCA
Engr Walk-down/ Trans- port Preps
Move Probes to HPF
Weigh PCA
PCA Mate to 3rd Stage/ Clamp-band Instl
Transport to Pad
S/C Functional & RF Test
Launch Rehearsal
Power On & Stray Voltage
Install Fairing
Prop. Load Prep
2nd Stage Fueling, Ordnance
Launch Readiness Review
Laun
ch
Ship
ping
fr
om J
PL12/08/06
12/21/06
02/02/07
02/15/0702/14/07
ASTROTECH and Launch Pad Flow
12/11/06 12/12/06
01/08/07
01/15/07
01/13/0701/05/0712/22/06
12/13/06
02/03/07 02/05/07 02/12/07 02/13/07
PCA Functional
01/23/0701/22/07
12/23/06 01/02/07
Reserve
Christmas Shutdown
12/11/06to
12/18/06
12/19/06
12/15/06
12/11/06
THEMIS Launch
01/03/07
02/07/0702/06/07
12/15/0612/14/06 12/19/0612/15/06 12/20/0612/19/06
5 Probes plus EGSE, MGSE at ASO
Probe Carrier Unpack
Unpack, Setup EGSE
PC-VCO Electrical Test
Install Sep. Harness
Install SMDC Lines
F1 RCS MEOP, LPT, S/A Test
Install Bolt Cutters, Therm. Closeouts
F2-3 RCS MEOP, LPT, S/A Test
F4-5 RCS MEOP, LPT, S/A Test
Weigh, Move to Stands
Pre-VosMRR (GSFC)
01/0301/05
LVRR (KSC) 01/12Media Day 01/12
01/09/07 01/10/07 01/11/07 01/12/07
MRR (HQ) 01/23
01/24/07 01/25/07 01/26/07 01/27/07 01/29/07 01/30/07
LSRR (CCAFS) 02/01
01/3107 02/01/07
02/09/0702/08/07
LMCM (KSC) 02/13FRR (KSC) 02/12
THEMIS MRR I&T − 10 GSFC, January 5, 2007
RFAs
Issue SubmittedRCS Proof Tests Jan 17 2006BAU EEPROM Signal Plots Jun 23 2006Energy Balance in Deep Eclipse Jun 26 2006Launch Window Analysis Nov 09 2006
RFA StatusIncomplete: 0Complete: 308 Closed: 304Total: 308
Final Four Closure Method• RCS Proof Issue: Expected to Close with Risk Definition• BAU EEPROM Plots Provided were Insufficient to the reviewer
but it is no longer practical to obtain better plots.• Energy Balance was Provided using Best Thermal Model at the
time. Reviewer repeated request using new mission profile and correlated thermal model. This was delivered in December.
• Launch Window Analysis will be reviewed by GSFC by 1/15/07
THEMIS MRR I&T − 11 GSFC, January 5, 2007
Reviews Ahead
Start Event Description1/5/2007 MRR Mission Readiness Review
1/12/2007 LVRR Launch Vehicle Readiness Review1/17/2007 SMSR Systems and Safety Mission Assurance1/23/2007 MRB Mission Readiness Review2/1/2007 LSRR Launch Site Readiness Review
2/12/2007 FRR Flight Readiness Review 2/13/2007 LRR Launch Readiness Review