themis instrument suite persuite t-v- 1 ucb, may 2, 2005 themis instrument suite thermal vac test...

15
THEMIS Instrument Suite PER Suite T-V-1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley

Upload: jonas-kelly

Post on 30-Dec-2015

221 views

Category:

Documents


2 download

TRANSCRIPT

THEMIS Instrument Suite PER Suite T-V-1 UCB, May 2, 2005

THEMIS Instrument Suite Thermal Vac Test

Rick Sterling

University of California, Berkeley

THEMIS Instrument Suite PER Suite T-V-2 UCB, May 2, 2005

Thermal Vac Test Summary

• Six cycles

• Operating cold plateau: -40C

• Operating hot plateau: +55C

• Doing P1 Suite alone; subsequent suites in pairs: P2, P3 then P4,P5.

THEMIS Instrument Suite PER Suite T-V-3 UCB, May 2, 2005

Instrument Suite on Platform

THEMIS Instrument Suite PER Suite T-V-4 UCB, May 2, 2005

UCB/SSL Room 20 TVAC Tank•Vacuum Tank formerly used for Calibration (EUVE, ORFEUS, CHIPS)

•Thermal System added for THEMIS TVAC

THEMIS Instrument Suite PER Suite T-V-5 UCB, May 2, 2005

• Tank– Inside Class 100,000 Clean Room– 8’ Diameter X 15’ Deep– 2 THEMIS Instruments Suites Fit Inside

• Vacuum System– Scroll Pump Rough Pump– Cryo High Vacuum Pump– Pumps Recently Refurbished– Base Pressure: 10-6 Torr

• TQCM– Faraday Labs Instrument and Controller Installed– 100-200 Hz/Hr Baseline (Empty Tank, Thermal system at 60 C)

• Thermal System– Thermally controlled Baseplate

and Box Shroud• Liquid Nitrogen Cooling Lines• Power Resistor Heating Elements

– Computer Control• Watlow Anafaze MLS300

Controller• 16 Channels Data Capture• AnaWin2 Software for thermal

profiles– Separate Overtemp Alarm with

Shut-Down Control

• Temperature Range– -130 C to +95 C

• Status– Tank Ready for THEMIS Suite

Testing

Room 20 Tank Specifications

THEMIS Instrument Suite PER Suite T-V-6 UCB, May 2, 2005

B20 CLEAN ROOM READY FOR INSTRUMENT SUITE

THEMIS Instrument Suite PER Suite T-V-7 UCB, May 2, 2005

Carrier for Themis Instrument Suites

THEMIS Instrument Suite PER Suite T-V-8 UCB, May 2, 2005

CHAMBER FEEDTHROUGHS

THEMIS Instrument Suite PER Suite T-V-9 UCB, May 2, 2005

Clean Room Features100K Class Nitrogen gas purgingContinuous oxygen monitoringTemperature and Humidity MonitoringESD ComplianceCertified Crane/hoistControlled AccessStaff Training

THEMIS Instrument Suite PER Suite T-V-10 UCB, May 2, 2005

• F1 Suite TVAC will use F2 AXBs since F1 AXBs need to be delivered to Swales before the F1 Suite TVAC test date.

THEMIS Instrument Suite PER Suite T-V-11 UCB, May 2, 2005

SUITE THERMAL VAC TEST

-80

-60

-40

-20

0

20

40

60

80

TE

MP

(C

)

CPT

CPT

CPT CPT

LPTLPTLPT LPT

LPT

LPT

LPT LPT LPT LPT

FGM 1st Motion

T1

T1 =

T

T2

TT

SCM 1st MotionT2 =

THEMIS Instrument Suite PER Suite T-V-12 UCB, May 2, 2005

SSTSENSORS

P301 - HD26F

LENGTH = 30 FEET

SCMPREAMP

FGMSENSOR

NOTES:- INTERNAL TVAC HARNESSING NOT SHOWN- BLUE HARNESSES USED FOR BOTH TVACCONFIGURATIONS

EXTERNAL

PJ531 to P534HD15M (X4)

LENGTH = 30 FEET

HD26M

TEST CONFIGURATION

ESA

SCMSENSOR

SPB SIM (2)

IDPUD15

LENGTH = 30 FEET

SUITE TVAC CONFIGURATION

P535 - HD26M

AXB SIM (2)

9VPOWERSUPPLY

ENABLE PLUGS

D25

AXBBOOMS

BAUSIMULATOR(NIOS)

LENGTH = 10 FEET

LENGTH = 30 FEET

ACTUATORPOWERSUPPLY

28VPOWERSUPPLY

SPBBOOMS

P101 - D9F LENGTH = 10 FEET

D25LENGTH = 10 FEET

P201- HD15F

CHAMBER WALL

D15

HD15M(X4)

LENGTH = 10 FEET

MAGBOOMS

HD26M

INTERNAL

D37

OVERVIEW OF HARNESSING THROUGH TV CHAMBER

THEMIS Instrument Suite PER Suite T-V-13 UCB, May 2, 2005

GSE FOR INSTRUMENT SUITE T-V

• Harnesses (power and data)

• Special harnesses for EFI Boom motor simulators

• Power supplies

• NIOS board for interface RS422 to ethernet

• GSE computer displaying all relevant data and housekeeping

THEMIS Instrument Suite PER Suite T-V-14 UCB, May 2, 2005

• INSTRUMENT AND FACILITY MONITORING ON 24-7 BASIS

• SUPPLEMENTED BY REMOTE INSTRUMENT MONITORING

• ASSISTANCE / SUPPORT AVAILABLE AS NEEDED

STAFFING

THEMIS Instrument Suite PER Suite T-V-15 UCB, May 2, 2005

DOCUMENTATION

Instrument Suite Thermal Vacuum ProcedureIncludes:

• Pre-test checks and verifications • Physical setup and suite installation• Step by step operations• Vacuum requirements• Thermal requirements• CPT, LPT, special procedures• Responsibilities