The X-mine project: Real-Time Mineral X-Ray Analysis for Efficient and Sustainable Mining Project summary e X-MINE project supports better resource characterization and estimation as well as more efficient ore extraction in existing mine operations, making the mining of smaller and complex deposits economically feasible and increasing potential European mineral resources (specifically in the context of critical raw materials) without generating adverse environmental impact. e project will implement large-scale demonstrators of novel sensing technologies improving the efficiency and- sustainability of mining operations based on X-Ray Fluorescence (XRF), X-Ray Transmission (XRT) technologies, 3D vision and their integration with mineral sorting equipment and mine planning soſtware systems. e project will deploy these technologies in 4 existing mining operations in Sweden, Greece, Bulgaria and Cyprus. e sites have been chosen to illustrate different sizes (from small-scale to large-scale) and different target minerals (zinc-lead-silver-gold, copper-gold, gold) including the presence of associated critical metals such as indium, gallium, germanium, platinum group metals and rare earth elements. e pilots will be evaluated in the context of scientific, technical, socio-economic, lifecycle, health and safety performances. e sensing technologies developed in the project will improve exploration and extraction efficiency, resulting in less blasting required for mining. e technologies will also enable more efficient and automated mineral-selectivity at extraction stage, improving ore pre-concentration options and resulting in lower use of energy, water, chemicals and men hours (worker exposure) during downstream processing. e consortium includes 5 industrial suppliers, 4 re- search/academic organizations, 4 mining companies and 1 mining association. e project has a duration of 3 years and a requested EC contribution of €9.3M. Benificaries Work packages Overall concept e project will demonstrate (in real mining operations) smart exploration tools to 3D-model and delineate the ore deposit structure and novel sensing technologies able to detect heavier elements (such as precious and critical metals) inside ore mineralised parts with higher sensitivity, resolution and throughput compared to present technologies: e project technologies will be implemented in two different solution embodiments: · A transportable solution (X-Analyser) that can be deployed at the drilling site, by the drill rig or at the core farm (Figure 1, above), supporting mine exploration, grade control and blast hole planning · An integrated solution (X-AnalySorter) working with existing mineral sorting equipment (Figure 2, above), supporting the pre-processing and mineral sorting stages. Work plan structure e work plan is broken down in 4 main work package groups, in addition to WP8 Management: · Technology innovations (WP1-4) · Pilot demonstrations (WP5) · Dissemination and exploitation (WP6-7) e chart shown below provides an overview of all work packages, highlighting the main dependencies between the work packages. · Ore deposit modelling: modelling of the ore deposits/mine demonstrators based on integrated geological, geochemical and geophysical data, using bedrock mapping and combined geophysical methods. · High performance sensors: current online XRF based systems have poor spatial resolution (>100mm) and only analyse the surface of the rock, not its volume. is gives an erroneous estimate of the element concentration, especially for elements with low concentration or uneven distribution, such as precious metals. e technology developed in the project will be able to penetrate centimetres inside the ore and mineralisation, with better spatial resolution (<10mm), making it especially suitable for the mining of low concentration metal grades of precious and rare metals, indium, gallium, germanium, tellurium, selenium, rare earth elements (REE) and platinum group metals (PGM). · High sorting throughput: Going to smaller separable fraction sizes improves yield and allows an improved recovery and ore characterisation. Better measurement of the shapes and densities of the particles allow improved control of blowpipe aspiration parameters for separation of gangue and gives critical information to optimize the crushing/grinding required to effectively separate wanted from unwanted minerals. e technology will support a sorting speed of at least 40tons/hours, and more if required by the mining sites. 1. Ore deposit modelling SGU, 129 2. Sensor & Data Fusion ADVFI, 159 3. Online Analysis & Sensor-based Sorting VTT, 116 4. Prototypes ORE, 168 5. Pilot Demonstrations VTT, 390 6. Dissemination, Community Outreach BERGAB, 71 7. Exploitation, Industrialization & Standardization ORE, 62 8. Managment VTT, 49 Work packages, leader, person months General information Project title: Real-Time Mineral X-Ray Analysis for Efficient and Sustainable Mining Starting date: June 2017 Duration in months: 36 is project has received funding from the European Union’s Horizon 2020 research and in- novation programme under grant agreement No 730270 Topic: SC5-14-2016-2017 Raw materials Innovation actions Fixed EC Keywords: Mineralogy, Systems engineering, sensorics, actorics, automation, Mining and mineral processing, Natural resources exploration and exploitation Free keywords: X-Ray Fluorescence, X-Ray Transmission, Computer Vision PEOPLE INVOLVED AT SGU: STEFAN LUTH (POSTER AUTHOR [email protected]), RONALD ARVIDSSON, ERIK JONSSON, NIKOLAOS ARVANITIDIS, ILDIKO ANTAL-LUNDIN, MATS THÖRNELÖF, MATS WEDMARK, JOHAN JÖNBERGER UPPSALA UNIVERSITY: KARIN HÖGDAHL

Upload: others

Post on 21-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The X-mine project - Real-Time Mineral X-Ray Analysis for … · 2018-11-14 · The X-mine project: Real-Time Mineral X-Ray Analysis for Efficient and Sustainable Mining Project summary

The X-mine project: Real-Time Mineral X-Ray Analysis for Efficient and Sustainable Mining

Project summaryThe X-MINE project supports better resource characterization and estimation as well as more efficient ore extraction in existing mine operations, making the mining of smaller and complex deposits economically feasible and increasingpotential European mineral resources (specifically in the context of critical raw materials) without generating adverse environmental impact. The project will implement large-scale demonstrators of novel sensing technologies improving the efficiency and-sustainability of mining operations based on X-Ray Fluorescence (XRF), X-Ray Transmission (XRT) technologies, 3D vision and their integration with mineral sorting equipment and mine planning software systems. The project will deploy these technologies in 4 existing mining operations in Sweden, Greece, Bulgaria and Cyprus. The sites have been chosen to illustrate different sizes (from small-scale to large-scale) and different target minerals (zinc-lead-silver-gold, copper-gold, gold) including the presence of associated critical metals such as indium, gallium, germanium, platinum group metals and rare earth elements. The pilots will be evaluated in the context of scientific,technical, socio-economic, lifecycle, health and safety performances. The sensing technologies developed in the project will improve exploration and extraction efficiency, resulting in less blasting required for mining. The technologies will also enable more efficient and automated mineral-selectivity at extraction stage, improving ore pre-concentration options and resulting in lower use of energy, water, chemicals and men hours (worker exposure) during downstream processing. The consortium includes 5 industrial suppliers, 4 re-search/academic organizations, 4 mining companies and 1 mining association. The project has a duration of 3 years and a requested EC contribution of €9.3M.

Benificaries

Work packages

Overall conceptThe project will demonstrate (in real mining operations) smart exploration tools to 3D-model and delineate the ore deposit structure and novel sensing technologies able to detect heavier elements (such as precious and criticalmetals) inside ore mineralised parts with higher sensitivity, resolution and throughput compared to presenttechnologies:

The project technologies will be implemented in two different solution embodiments:· A transportable solution (X-Analyser) that can be deployed at the drilling site, by the drill rig or at the corefarm (Figure 1, above), supporting mine exploration, grade control and blast hole planning

· An integrated solution (X-AnalySorter) working with existing mineral sorting equipment (Figure 2, above),supporting the pre-processing and mineral sorting stages.

Work plan structureThe work plan is broken down in 4 main work package groups, in addition to WP8 Management:

· Technology innovations (WP1-4)· Pilot demonstrations (WP5)· Dissemination and exploitation (WP6-7)

The chart shown below provides an overview of all work packages, highlighting the main dependencies between the work packages.

· Ore deposit modelling: modelling of the ore deposits/mine demonstrators based on integrated geological,geochemical and geophysical data, using bedrock mapping and combined geophysical methods.

· High performance sensors: current online XRF based systems have poor spatial resolution (>100mm) andonly analyse the surface of the rock, not its volume. This gives an erroneous estimate of the elementconcentration, especially for elements with low concentration or uneven distribution, such as preciousmetals. The technology developed in the project will be able to penetrate centimetres inside the ore andmineralisation, with better spatial resolution (<10mm), making it especially suitable for the mining of lowconcentration metal grades of precious and rare metals, indium, gallium, germanium, tellurium, selenium,rare earth elements (REE) and platinum group metals (PGM).

· High sorting throughput: Going to smaller separable fraction sizes improves yield and allows an improvedrecovery and ore characterisation. Better measurement of the shapes and densities of the particles allowimproved control of blowpipe aspiration parameters for separation of gangue and gives critical informationto optimize the crushing/grinding required to effectively separate wanted from unwanted minerals. Thetechnology will support a sorting speed of at least 40tons/hours, and more if required by the mining sites.

1. Ore deposit modellingSGU, 129

2. Sensor & Data FusionADVFI, 159

3. Online Analysis &Sensor-based Sorting

VTT, 116

4. PrototypesORE, 168

5. Pilot DemonstrationsVTT, 390

6. Dissemination,Community Outreach

BERGAB, 71

7. Exploitation,Industrialization &

Standardization ORE, 62

8. Managment VTT, 49

Work packages, leader, person months

General informationProject title: Real-Time Mineral X-Ray Analysis for Efficient and Sustainable MiningStarting date: June 2017 Duration in months: 36This project has received funding from the European Union’s Horizon 2020 research and in-novation programme under grant agreement No 730270Topic: SC5-14-2016-2017 Raw materials Innovation actionsFixed EC Keywords: Mineralogy, Systems engineering, sensorics, actorics, automation, Mining and mineral processing, Natural resources exploration and exploitationFree keywords: X-Ray Fluorescence, X-Ray Transmission, Computer Vision

PEOPLE INVOLVED AT SGU: STEFAN LUTH (POSTER [email protected]), RONALD ARVIDSSON, ERIK JONSSON,NIKOLAOS ARVANITIDIS, ILDIKO ANTAL-LUNDIN, MATS THÖRNELÖF, MATS WEDMARK, JOHAN JÖNBERGERUPPSALA UNIVERSITY: KARIN HÖGDAHL