the wsu lc r&d program
DESCRIPTION
R.Bellwied, June 30, 2002. The WSU LC R&D program. Who are we ? What have we done ? What would we like to do ? Hardware and Software. Rene Bellwied, Dave Cinabro, Vladimir Rykov Wayne State University. R.Bellwied, June 30, 2002. The WSU LC R&D program. - PowerPoint PPT PresentationTRANSCRIPT
The WSU LC R&D program
Who are we ? What have we done ? What would we like to do ? Hardware and Software
R.Bellwied, June 30, 2002
Rene Bellwied, Dave Cinabro, Vladimir Rykov Wayne State University
The WSU LC R&D program
Mix of NSF funded HE group and DoE funded Nuclear group Interest: application of Silicon technologies to large area solid
state tracking. Group was funded by Prescott Committee and NSF in the past
two years to conduct LC R&D. Vladimir was partially funded by this grant.
Nuclear group designed, constructed, installed and operates the STAR-SVT ($7 Million project, 50 people from 9 institutions, project started in 1993 and was completed in 2001, Rene Bellwied was project leader throughout this time. Collaborating institutions: BNL, LBNL, Ohio State, University of Texas in Austin, Sao Paulo, Dubna, Protvino, Warsaw University)
R.Bellwied, June 30, 2002
The SVT in STAR
Construction in progressConstruction in progress
Connecting componentsConnecting components
R.Bellwied, June 30, 2002
The SVT in STAR (Feb.2001)
The final device….The final device….
… and all its
connections
… and all its
connections
R.Bellwied, June 30, 2002
STAR-SVT characteristics
216 wafers (bi-directional drift) = 432 hybrids 3 barrels, r = 5, 10, 15 cm, 103,680 channels, 13,271,040 pixels 6 by 6 cm active area = max. 3 cm drift, 3 mm (inactive) guard area max. HV = 1500 V, max. drift time = 5 ms, (TPC drift time = 50 ms) anode pitch = 250 mm, cathode pitch = 150 mm SVT cost: $7M for 0.7m2 of silicon (3 year R&D, 5 year construction) Radiation length: 1.4% per layer
0.3% silicon, 0.5% FEE (Front End Electronics), 0.6% cooling and support. Beryllium support structure. FEE placed beside wafers. Water cooling.
R.Bellwied, June 30, 2002
SDD’s: 3-d measuring devices(a solid state TPC)
R.Bellwied, June 30, 2002
A typical pattern on a hybrid for a central Au-Au event
central event: inner layer: ~15 hits/hybrid (middle: 8 hits, outer: 5 hits) = overall track multiplicity = 1000/event
R.Bellwied, June 30, 2002
Typical SDD Resolution
R.Bellwied, June 30, 2002
Wafers: B and T dependence
Operated at B=6T in E896 at the AGS. B fields parallel to drift increase the resistance and slow the drift velocity.
The detectors work well up to 50oC but are also very T-dependent. T-variations of 0.10C cause a 10% drift velocity variation
Detectors are operated at room temperature in STAR.
We monitor these effect via MOS charge injectors
0 1 2 3 4 5 65.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
6.0
6.1
Drif
t V
eloc
ity (m
/ns)
Magnetic Field (T)
R.Bellwied, June 30, 2002
Present status of technology
STAR (completed in 2001) 4in. NTD material, 3 kcm, 280 mm thick, 6.3 by 6.3 cm area 250 mm readout pitch, 61,440 pixels per detector SINTEF produced 250 good wafers (70% yield)
ALICE (to be completed in 2006) 6in. NTD material, 2 kcm, 280 mm thick, 280 mm pitch CANBERRA produced around 100 prototypes, good yield
Future (NLC) 6in. NTD, 150 micron thick, any pitch between 200-400 mm 10 by 10 cm wafer
R.Bellwied, June 30, 2002
Silicon detector option for LCD
R.Bellwied, June 30, 2002
Central tracker: Silicon Drift DetectorsFive layersRadiation length / layer = 0.5 %sigma_rphi = 7 m, sigma_rz = 10 m
Layer Radii Half-lengths ----------- ------------ 20.00 cm 26.67 cm 46.25 cm 61.67 cm 72.50 cm 96.67 cm 98.75 cm 131.67 cm 125.00 cm 166.67 cm
56 m2 SiliconWafer size: 10 by 10 cm # of Wafers: 6000 (incl. spares)# of Channels: 4,404,480 channels (260 m pitch)
SD Tracking efficiencies:For 100% hit efficiency: (97.3±0.10)%For 98% hit efficiency: (96.6±0.12)%For 90% hit efficiency: (92.7±0.16)%
Tracking efficiencies:For 100% hit efficiency: (95.3±0.13)%For 98% hit efficiency: (94.5±0.14)%For 90% hit efficiency: (89.5±0.20)%
LD
Tracking efficiencies LD vs. SD
R.Bellwied, June 30, 2002
V. L. Rykov, June 28, 2002
LD SD
With the maximum of d3p distribution at ~(1.5-2)10-3, the data are consistentwith the earlier momentum resolution simulations (B. Schumm, VR, et al):
within a factor of ~2 in the momentum range of 0.5 GeV/c < pT < 20 GeV/c.
222 /3/||23 cGeVppppd TMcRc
2225 /2500102 cGeVpp TTpT
log10(Pt, GeV/c) log10(Pt, GeV/c)
Momentum studies (LD / SD)
SD For hit efficiency 100%:Missing energy = (5.7±0.4) GeV = (3.3±0.2)%Ghost energy = (4.8±0.4) GeV = (2.9±0.2)%
For hit efficiency 100%:Missing energy = (11.7±0.6) GeV = (7.1±0.3)%Ghost energy = (19.6±0.8) GeV = (13.1±0.6)%
LD
Missing and ghost energies
R.Bellwied, June 30, 2002
R.Bellwied, June 30, 2002
With the maximum of d3p distribution at ~(1.5-2)10-3, the data are consistentwith the earlier momentum resolution simulations (B. Schumm, VR, et al):
within a factor of ~2 in the momentum range of 0.5 GeV/c < pT < 20 GeV/c.
2225 /2500102 cGeVpp TTpT
Preliminary conclusions
Momentum resolution
The SD option has slightly better resolution at high momentum and slightly worse resolution at low momentum compared to LD
With the existing 3d tracking and pattern recognition software (Mike Ronan et al.) the SD option has a slight advantage in tracking efficiency, shows less missing and ghost energy, and less ghost tracks)
Track Timing at e+e- Linear Collider with the Silicon Drift Detector Main
TrackerR. Bellwied, D. Cinabro, V. L. Rykov
Wayne State University,Detroit, Michigan
Chicago LC Workshop, Chicago, Illinois, January 7-9, 2002 V. L. Rykov, Wayne State University
timeTrain or Rf-pulse
Parameter NLC JLC TESLA Train length, s 0.265 0.265 950
Number of bunches/Train 190 190 ~2800 Bunch separation, ns 1.4 1.4 337 Repetition rate, Hz 120 100 5
Background -events in TPC 2-3 2-3 3-5 Background -events in SDD 2-3 2-3 ~0.5
For NLC/JLC, it is expected ~2.2 hadronic -events per train, in addition to the trigger, with the average number of tracks ~17 and energy deposit in the calorimeter ~100 GeV per such an event.T. Abe et al, Physics Resource Book for Snowmass 2001 and ref. therein
123410)32( scmL
Conclusion of track-timing study(hep-ex/0202030, submitted to NIM)
It is shown that, with the SDD based central Main Tracker for the detector at e+e- Linear Collider, the track selection and timing is possible at the nanosecond and even sub-nanosecond level.
This means that, even at the NLC and/or JLC with the bunch spacing at 1.4 ns, each high-PT track can be assigned to a particular bunch crossing at the confidential level of up to ~2.
For the considered here 5-layer central Main Tracker, it is suggested to make layers 1, 2, 3 and 5 drifting along z-axis, but layer 4 drifting along the azimuth (-axis) with effectively no negative impact on the tracker’s momentum resolution. In other words, all the above is just for free with the SDD Main Tracker.
Chicago LC Workshop, Chicago, Illinois, January 7-9, 2002 V. L. Rykov, Wayne State University
R&D for Large Tracker Application
Improve position resolution to 5m Decrease anode pitch from 250 to 100m. Stiffen resistor chain and drift faster.
Improve radiation length Reduce wafer thickness from 300m to 150m Move FEE to edges or change from hybrid to SVX Air cooling vs. water cooling
Use 6in instead of 4in Silicon wafers to reduce #channels. More extensive radiation damage studies.
Detectors/FEE can withstand around 100 krad (,n) PASA is BIPOLAR (intrinsically rad. hard.) SCA can be produced in rad. hard process.
R.Bellwied, June 30, 2002
WSU R&D interests
Main goal: develop either full scale tracker or intermediate tracking layer on the basis of Silicon Drift technology.
Projects: Hardware 1.) design new prototype drift detector layout (incl. frontend stage) optimized for LC
use (i.e. larger detector, higher pitch, higher voltage, less power consumption) 2.) collaborate with BNL on prototype production of wafer and frontend chip
Software 1.) optimize 3d tracking code for solid state tracker, compare performance to gas detector
and other silicon technologies 2.) write slow simulator for detector response and apply STAR tracking and pattern
recognition 3.) find unique drift detector applications (e.g. track timing)
R.Bellwied, June 30, 2002
WSU proposal for the next 3 years (~50 K per project per year)
In collaboration with the Instrumentation division at BNL:
1.) design and produce a prototype batch (~20) of new, optimized Silicon drift detectors. The proposed major changes compared to the old STAR design are:
a.) increase the detector size by using six inch rather than four inch wafers
b.) increase the readout pitch in order to reduce the channel count
c.) thin the wafer from 300 micron to 150 micron
d.) operate wafers at higher voltage (up to 2500 V) to accommodate new drift length
2.) design and produce a new prototype of a CMOS based frontend chip.
a.) use deep sub-micron technology to improve radiation hardness
b.) reduce power consumption to allow air-cooling of the detector
c.) potentially include the ADC stage into the PASA/SCA design
d.) test tape automated bonding rather than wire-bonding R.Bellwied, June 30, 2002
WSU proposal (cont.)3.) we also propose to investigate a design for the mechanical support of the Silicon ladders based on a design used for the Silicon Strip detector layer in STAR.
4.) software efforts
a.)continue our comparative study of the performance of a Silicon drift detector based main tracker with the existing tracking and pattern recognition code...
b.)provide a full GEANT based geometry definition of our proposed tracker before the fall of 2002.
c.)port a detector response code from STAR into the LC simulation framework.
d.)adapt a code recently written by a WSU led software group for STAR which allows track matching between the two main tracking detectors in STAR and the electro-magnetic calorimeter in STAR. An integrated tracking code (IT) can be applied to the SD design in order to simultaneously analyze the information from the vertex detector, the main tracker and the calorimeter.
R.Bellwied, June 30, 2002
What’s next for SDD ?
The project has to grow, we need more groups interested in SDD (as of now only WSU and BNL expressed some interest).
Prototype detectors for use in test setups at universities or other National Labs are available through WSU/BNL.
People with mask design skills could work on new prototype layouts. The wafer and frontend electronics R&D could be split in two projects. What should the frontend be: DSM-CMOS, bipolar, different chips for different
stages or single chip, implanted or wire-bonded ? Readout electronics and DAQ integration have not been addressed at all. Software development and simulations needs a lot more manpower. Talk to us if
you’re interested ([email protected]) Check out the web at: http://rhic15.physics.wayne.edu/~bellwied/nlc
R.Bellwied, June 30, 2002
Detectors: SD and LD geometries as of March 2001. Resolutions: SD – r = 7 , z = 10 ; LD - r = 100 , z = 1400 . Input data: -events at , “panpy-tt-500-010301-*D-sim-**.sio” files. Tracking: (Deliberately) “blind” use of codes from the “hep.lcd.recon” package. Analysis: Modified “TrackEfficiencyDriver” code (W. Walkowiak) from “Snowmass-2001” CD tutorial. Acceptance: Only barrel trackers (+VXD) with forward disk (Endcaps) hits removed (smeared to “a parsec” = 100 m away). Framework: Local JAS analysis at the (close to) “pocket-size” Sony Vaio laptop.
tt GeVS 500
B = 5 T B = 3 T144 layers
Simulation framework
R.Bellwied, June 30, 2002
Simulation Studies
Momentum resolution Present: 20 m pos.res.,
1.5% rad.length/layer, Beampipe wall thickness: 2 mm
Future: 5 m pos.res., 0.5% rad.length/layer, Beampipe wall thickness: 0.5 mm
Two Track Resolution. Present: 500 m Future: 200 m
R.Bellwied, June 30, 2002
Track time stamping with the SDD (intrinsic)
Chicago LC Workshop, Chicago, Illinois, January 7-9, 2002 V. L. Rykov, Wayne State University
Correct timing: Hit positions are determined correctly, and fit to a track with a good 2.
Wrong timing with some hit SDDs drifting in the opposite directions to the others (probability 15/16th=93.75%): Hit positions are determined incorrectly, and do not fit to a track, i.e. 2 is bad.
Wrong timing with all hit SDDs drifting the same direction (probability1/16th=6.25%): Hit positions are determined incorrectly, but still fit to a shifted track with a good 2.
Simulation Studies (cont.)
Momentum resolution Modify Position
Resolution Modify Radiation length:
Si thickness, Electronics Modify Beam Pipe Wall
Thickness
R.Bellwied, June 30, 2002
Track time stamping with the TPC
It is recognized that, if the time stamping for the tracks in the TPC or SDD is not done, it could seriously impact the detector performance, particularly its missing mass resolution.
Sorting out tracks, using the Main Tracker only is always the most desirable option.
The suggested solution for the TPC was to place, at some TPC depth, fast intermediate tracker, made from scintillating fibers and/or silicon intermediate tracking layer inside the TPC. (Physics Resource Book, 2001)
Chicago LC Workshop, Chicago, Illinois, January 7-9, 2002 V. L. Rykov, Wayne State University
Various drift axis combinations in MT layers
Impacton PT-
resolution:anode = 7 mdrift = 10 mIn the options zzz
(the best for time stamping), momentum resolution at high PT deteriorates by ~10%, compared to zzzzz (the best for PT resolution). There is virtually no worsening of momentum resolution for zzzz drift.
Chicago LC Workshop, Chicago, Illinois, January 7-9, 2002 V. L. Rykov, Wayne State University