the vulcan project - tasman resources · lake torrens project summary •• > 2,000 km 2 of...

25
The Vulcan Project The Vulcan Project The Product of Perseverance The Product of Perseverance SAREIC May 2011 SAREIC May 2011 Greg Solomon/ Rob Smith Greg Solomon/ Rob Smith

Upload: others

Post on 17-Apr-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

The Vulcan Project The Vulcan Project The Product of PerseveranceThe Product of Perseverance

SAREIC May 2011SAREIC May 2011

Greg Solomon/ Rob SmithGreg Solomon/ Rob Smith

Page 2: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Tasman Group Corporate OverviewTasman Group Corporate Overview

Eden Energy LtdEden Energy Ltd Fission Energy LtdFission Energy Ltd

MineralsMineralsCu, Au, U, Ag,Cu, Au, U, Ag,

Pb, Zn.Pb, Zn.

16.8%16.8% 19.7%19.7%

Tasman Resources LtdTasman Resources Ltd(TAS)(TAS)

Eden Energy LtdEden Energy Ltd

(EDE)(EDE)Fission Energy LtdFission Energy Ltd

(FIS)

PyrolysisPyrolysis

HydrogenHydrogen--HythaneHythane

Gas (UK)Gas (UK)

Mt Thirsty Co-Ni

50%50%

Uranium – SA, WA

100%100%

50%50%

100%100%

100%100%

Dual fuelDual fuel

100%100%

Page 3: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Lake Torrens Project SummaryLake Torrens Project Summary

•• > 2,000 km> 2,000 km22 of tenements adjacent to Olympic Damof tenements adjacent to Olympic Dam

•• Six IOCGU targets within ~ 35 km of Olympic Dam Six IOCGU targets within ~ 35 km of Olympic Dam

•• Vulcan Vulcan -- new IOCGU system discovered Nov 2009new IOCGU system discovered Nov 2009

-- Similar target area to OD > 12 kmSimilar target area to OD > 12 km22-- Similar target area to OD > 12 kmSimilar target area to OD > 12 km22

-- 30 km north of Olympic Dam30 km north of Olympic Dam; priority tectonic address; priority tectonic address

-- IOCGU min./alt. (all 8 holes) IOCGU min./alt. (all 8 holes) -- Cu, Au, Ag, U, Mo (+ REE) Cu, Au, Ag, U, Mo (+ REE)

-- 57 m of strong chalcopyrite/pyrite mineralisation 57 m of strong chalcopyrite/pyrite mineralisation in VUD 3in VUD 3

-- ++150m “classic” min. hematite150m “classic” min. hematite--rich breccias rich breccias in VUD 7in VUD 7

-- Classic zonation Classic zonation (bornite/chalcopyrite/pyrite(bornite/chalcopyrite/pyrite) in VUD 8 ) in VUD 8

Page 4: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Vulcan Project:Vulcan Project:Showing Showing Tectonic Lineaments (WMC, 1975)Tectonic Lineaments (WMC, 1975)

Page 5: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Tasman IOCGU TargetsTasman IOCGU Targets

Page 6: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Lake Torrens Project: PerseveranceLake Torrens Project: Perseverance

1976 1976 –– 1981 WMC 1981 WMC Geophysics,

Drilling

1996 1996 –– Phelps DodgePhelps Dodge

- Drilling

2003 2003 –– 2009 Tasman 2009 Tasman (Titan,

Marathon South, Atlas, other

prospects), including: prospects), including:

- Gravity

- Magnetics

- Electrical

- Drilling

2009 2009 –– 2011 Tasman 2011 Tasman (Vulcan)

- Gravity

- Drilling

Page 7: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Vulcan IOCGU ProjectVulcan IOCGU Project

Residual Gravity Image showing Tasman DrillingResidual Gravity Image showing Tasman Drilling

Page 8: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Olympic Dam Olympic Dam -- Vulcan: Residual Gravity ComparisonVulcan: Residual Gravity Comparison

(calculated residual gravity response if Vulcan at same depth as OD(calculated residual gravity response if Vulcan at same depth as OD))

Olympic DamOlympic Dam VulcanVulcan

2km2km

Page 9: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Vulcan VUD 001Vulcan VUD 001

Mineralised, hematite matrix-

rich breccia (py, cpy)

Heterolithic, sulphide-

rich breccia

rich breccia (py, cpy)

Heterolithic,

carbonate

breccia (py,

cpy, hem)

Page 10: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Vulcan: VUD 3

Massive Sulphides Massive Sulphides -- 930.2 930.2 -- 930.9m 930.9m

cpy

py

Page 11: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Vulcan VUD 003: Cu Vulcan VUD 003: Cu -- Au Au -- UU33OO88 MineralisationMineralisation

Core from interval: 0.34m at 5.9% Cu, 2.23g/t Au

Core from interval: 0.75m at 4.4% Cu,

1.34g/t Au, 0.58kg/t U3O8

Page 12: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Vulcan VUD 3Vulcan VUD 3

•• 245m Alteration and Mineralisation, includes:245m Alteration and Mineralisation, includes:

From To From To mm CuCu (%) (%) Au (g/t)Au (g/t) UU33OO88 (kg/t(kg/t))

874.20 930.85 56.6556.65 0.590.59 0.170.17 0.050.05

includes:

895.08 895.42 0.340.34 5.85 2.235.85 2.23 0.030.03895.08 895.42 0.340.34 5.85 2.235.85 2.23 0.030.03

and

912.00 919.80 7.80 1.21 0.35 0.147.80 1.21 0.35 0.14

includes:

919.05 919.80 0.75 4.44 1.34 0.75 4.44 1.34 0.580.58

and

930.20 930.85 0.650.65 7.807.80 2.412.41 0.030.03

Page 13: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Vulcan VUD 003Vulcan VUD 003

DownDown--hole correlation of IOCGU metalshole correlation of IOCGU metals

Cover Sediments Cover Sediments

Basement Basement

U3O8 CuCuAu

Page 14: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Vulcan IOCGU ProjectVulcan IOCGU Project

Residual Gravity Image showing Tasman DrillingResidual Gravity Image showing Tasman Drilling

Page 15: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Vulcan VUD 7: +150m of Hematite BrecciaVulcan VUD 7: +150m of Hematite Breccia

Page 16: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Vulcan VUD 7Vulcan VUD 7

•• 150m+ Alteration and Mineralisation, includes:150m+ Alteration and Mineralisation, includes:

From ToFrom To mm Cu (%)Cu (%) Au (g/t)Au (g/t) UU33OO88 (kg/t)(kg/t) Mo (%)Mo (%)

1065 1228 163163 0.230.23 0.080.08 0.040.04 0.010.011065 1228 163163 0.230.23 0.080.08 0.040.04 0.010.01

Includes:

1118 1208 90 0.25 0.09 0.0590 0.25 0.09 0.05 0.020.02

Page 17: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Olympic Dam – Vulcan Zonation Comparison

Page 18: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Vulcan IOCGU ProjectVulcan IOCGU Project

Residual Gravity Image showing Tasman Drilling

Page 19: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Vulcan Prospect: ComparisonsVulcan Prospect: Comparisons

Page 20: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Large Systems: Perseverance RequiredLarge Systems: Perseverance Required

Olympic Dam Resource

Outline (MESA Journal 2001)

Initial Drilling at Olympic

Dam (9 holes, 1976)

Page 21: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Vulcan IOCGU Project: Future ProgramVulcan IOCGU Project: Future Program

•• Geological and geophysical review, Geological and geophysical review, remodellingremodelling

•• Dating of selected samplesDating of selected samples•• Dating of selected samplesDating of selected samples

•• Select new drill targetsSelect new drill targets

•• Resolve access issues and test highest priority Resolve access issues and test highest priority parts of Vulcan IOCGU systemparts of Vulcan IOCGU system

Page 22: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Corporate Structure Corporate Structure -- April 2011April 2011

• Issued Shares (TAS)– 202,909,283

• Options (TASOB) – 20,587,791

- 10c / 30 June 2012

• Market Cap - $23.3m

• Current Rights Issue• Current Rights Issue

• Eden Energy Shareholding

- 35m shares - $3.8m

• Fission Energy Shareholding

- 25m shares - $1.75m

Page 23: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

DisclaimerDisclaimer

The interpretations and conclusions reached in thispresentation are based on current geological theory andthe best evidence available to the authors at the time ofwriting. It is the nature of all scientific conclusions thatthey are founded on an assessment of probabilities and,however high these probabilities might be, they make noclaim for complete certainty. Any economic decisions thatmight be taken on the basis of interpretations ormight be taken on the basis of interpretations orconclusions contained in this report will therefore carry anelement of risk.

It should not be assumed that the reported ExplorationResults will result, with further exploration, in thedefinition of a Mineral Resource.

Page 24: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

The information in this presentation that relates to Exploration

Results and Activities is based on information compiled by

Robert Smith and Michael Glasson who are Members of the

Australian Institute of Geoscientists. Robert Smith and Michael

Glasson are full-time employees of the Company. Robert Smith

and Michael Glasson have sufficient experience which is relevant

Competent Person’s StatementCompetent Person’s Statement

and Michael Glasson have sufficient experience which is relevant

to the style of mineralisation and type of deposit under

consideration and to the activity which they are undertaking to

qualify as Competent Persons as defined in the 2004 Edition of

the “Australasian Code for Reporting of Exploration Results,

Mineral Resources and Ore Reserves”. Robert Smith and

Michael Glasson consent to the inclusion in the report of the

matters based on their information in the form and context in

which it appears.

Page 25: The Vulcan Project - Tasman Resources · Lake Torrens Project Summary •• > 2,000 km 2 of tenements adjacent to Olympic Dam •• Six IOCGU targets within ~ 35 km of Olympic Dam

Greg Solomon/ Rob Smith

Contact DetailsContact Details

Greg Solomon/ Rob Smith

Level 40, Exchange Plaza,

2 The Esplanade,Perth. Western Australia

Telephone: +61 8 9282 5889

Website: tasmanresources.com.au