the valletta waterfront experience: back to the future

15
THE VALLETTA WATERFRONT EXPERIENCE: BACK TO THE FUTURE VCP Propriety 11/2012 1

Upload: valletta-cruise-port

Post on 08-Dec-2014

790 views

Category:

Travel


1 download

DESCRIPTION

Presentation by John Portelli, CEO of Valletta Cruise Port at Seatrade Med 2012 in Marseilles, as part of the Waterfront Development session. Private company, Valletta Cruise Port regenerated a historical port and converted it into a cruise terminal as well as a destination for locals, passengers and tourists. Valletta Cruise Port looked to the past in order to create a sustainable future.

TRANSCRIPT

Page 1: The Valletta Waterfront Experience: Back to the Future

VCP Propriety 11/2012 1

THE VALLETTA WATERFRONT EXPERIENCE: BACK TO THE FUTURE

Page 2: The Valletta Waterfront Experience: Back to the Future

VCP Propriety 11/2012 2

Page 3: The Valletta Waterfront Experience: Back to the Future

304/10/2023 VISET Malta plc 3

Page 4: The Valletta Waterfront Experience: Back to the Future

VCP Propriety 11/2012 4

Our task

• Vacating Properties (48,000 sqm).

• Shifting of road to the back of the

vaults

• New office for Transport Malta

• Excavation of Water Plaza

• Restoration of 1754 buildings and

conversion into offices, restaurants

and shops.

• Development of 900 m of quays.

Page 5: The Valletta Waterfront Experience: Back to the Future

VCP Propriety 11/2012 5

Page 6: The Valletta Waterfront Experience: Back to the Future

VCP Propriety 11/2012 6

The Water Plaza

The road shifted to the back of the restored stores, creating a pedestrian area overlooking the water plaza which follows the original quay line

Page 7: The Valletta Waterfront Experience: Back to the Future

VCP Propriety 11/2012 7

The Water Plaza

CHILD MIGRANT’S MEMORIAL

INAUGURATED 2ND MARCH 2008

Page 8: The Valletta Waterfront Experience: Back to the Future

VCP Propriety 11/2012 8

The Waterfront Experience

Page 9: The Valletta Waterfront Experience: Back to the Future

VCP Propriety 11/2012 9

The Cruise Terminal

Page 10: The Valletta Waterfront Experience: Back to the Future

VCP Propriety 11/2012 10

Our Cruise Terminal

Page 11: The Valletta Waterfront Experience: Back to the Future

VCP Propriety 11/2012 11

Total Cruise Passenger Movements

19992001

20032005

20072009

20110

100000

200000

300000

400000

500000

600000

700000

Page 12: The Valletta Waterfront Experience: Back to the Future

VCP Propriety 11/2012 12

• Further improvements in cruise facilities

• Marina (Letter of Intent)

• Car park and offices (2000 sqm: BOT)

• Powerstation Conversion (3,600 sqm: BOT)

The Future

Page 13: The Valletta Waterfront Experience: Back to the Future

VCP Propriety 11/2012 13

• 2005: Environmental Award for Conservation (MEPA)• 2005: Architectural Heritage (Din L-Art Helwa)• 2006: Europa Nostra Award• 2007: Most Improved Destination (Dream Cruise Magazine)• 2008: Most Improved Port Facility (Dream Cruise Magazine)• 2008: Destination of the Year (Seatrade Insider)• 2009: World Architectural Community Award• 2010: Best International Port in the Mediterranean (Excellence Cruise

Awards)• 2010: Best Destination Experience (Dream Cruise Magazine)• 2010: Merit Award (American Society of Landscape Architects)• 2011: Best Turnaround Port (Cruise Insight)• 2011: Most Responsive Port (Cruise Insight)• 2012: Waterfront Centre Global Award for Excellence• 2012: ULI Global Award for Excellence

Awards

Page 14: The Valletta Waterfront Experience: Back to the Future

Our History

Page 15: The Valletta Waterfront Experience: Back to the Future

Our Future

www.vallettacruiseport.com