the trading cards 09-11-14 final t - review 09-11-14
TRANSCRIPT
ve
The Trading Cards
Andrew
Tim
Dave
Brian
Kevin
Member
The Trading Cards
Coach
The Trading Cards
Co-Chair
Dave 3 YrsScore129
The Trading Cards
Secretary
Brian 1.1 yrsScore135
The Trading Cards
Member
Kevin 1.5Score190
The Trading Cards
Andrew 3 Yrs Score135
The Trading Cards
Coach
Ron 16 YrsTSS Cord.
Robin 16 YrsAssistant Mgr.
The Trading Cards
Chairperson
Tim 16 YrsScore 194
Facility built 1989
300+ Associates
We are in Barrie Ontario
The distance between Matsu and Honda is 37 km or 30 minutes ; Toyota is 192 KM or 2 hours and 37 minutes.
MAP2D / 4D Accord
RDX
TL
CIVIC MDX
ZDX
CR-V
CIVIC HMIN
TOYOTA
RAV4
ELP
YMA
MAP
HCM 2HCM 1
Body PartsWeld 136 ROBOTS
SFT Weld SFT Paint SFT Assembly Final Inspection
Our Team’s Department
SFT
1
The baseball
represents the current
step
Team Members Communication Organization
Circle Knowledge
Trouble shooting
Computer experience Score
Tim R 5 5 5 5 5 25Kevin K 5 5 1 4 4 19Dave S 5 3 1 3 3 15Brian M 4 3 1 3 4 15Andrew T 3 3 1 3 3 12
Team DevelopmentOfficer Selection Chart
1
Strengths
Improvement Areas
TIM R DAVE S BRIAN M KEVIN KANDREW T
PersistentCompetitive
Determined Likes authority
Learn multi-tasking Listening
LoyalGood listener
PeacemakerAdaptable
Finishing tasks Self-worth
Good communicatorCreative Visionary
Attention to detail.
1
Team Development
Trent Smalley Personality test
Meetings every Wed morning at 7:30 amMembers must attend 75% of meetingsAt least 3 team members per meetingMust sign attendance sheetStay focused during meetingsOne person gets the floor at all timesDecisions are made final by the majority of the teamPoints system will be used to determine who gets to go when we wina. 1 point for attendance on timeb. 1 point for participation c. 1 point for assignments done on timed. The members with the highest points go on the tripChairperson sets up meetings & sets up assignmentsCo-Chairperson keeps order during meetingsSecretary keeps meeting minutes and goes over last meeting.
1
Code of Conduct
Team Development
STEP 1 - TEAM DEVELOPMENT
CIRCLE MEETING MINUTES FORM CIRCLE NAME _________________________________________
DEPT.:____________________________________ TODAY'S DATE___________________________ MEMBER'S ATTENDANCE
RESP. NAME (please print) CHECK FOR ATTENDING
LEADER
SUB-LEADER
SECRETARY
MEMBER
MEMBER
MEMBER
MEMBER
MENTOR
TODAY'S AGENDA
DESCRIPTION OF ACTIVITY (Please include names and titles of anyone attending that is not part
of your circle):
NEXT MEETING AGENDA:
OFFICER SELECTION CHART
Team Members Score Role
GRADING SCALE: 5 - High Skill 4 - Good Skill 3 - Average Skill 2 - Low Skill
COMMUNICATION COMPUTER EXP ORGANIZATION CIRCLE EXP LEADERSHIP
STEP 3 - ACTIVITY PLANACTIVITY PLAN
PLAN vs ACTUAL
QUALITY CIRCLE PROCESS STEPS
1) DEVELOP THE TEAM 2) REASON FOR THEME SELECTION 3) ACTIVITY PLAN 4) DATA COLLECTION FOR CURRENT SITUATION 5) ROOT CAUSE ANALYSIS 6) ROOT CAUSE IDENTIFICATION 7) ROOT CAUSE GOAL SETTING 8) COUNTERMEASURE SELECTION & PRIORITIZATION 9) COUNTERMEASURE PLANNING (PLAN) 10) COUNTERMEASURE TESTING (D0) 11 COUNTERMEASURE VERIFICATION (CHECK) 12) COUNTERMEASURE STANDARDIZATION (ACT) 13) DATA COMPARISON SUMMARY 14) GOAL PLAN vs. ACTUAL 15) ACTUAL PLAN 16) IMPACT ANALYSIS
PLAN
1
Team Development
Reduce Waste
Reduce Water usage
Reuse Rinse Water
Reduce Impact to the
Environment
ReuseMasking
ReducePlastic Waste
ReducePaper Waste
ReduceMachine
Downtime
Theme SelectionBrain Storming
2
Theme Selection Matrix
2
THEME IDEA If situation is improved BENEFIT
If nothing is done NEGATIVE IMPACT ACHIEVABILITY TOTAL
ASSOCIATES BUSINESS ASSOCIATES BUSINESS
Reduce water usage 3 5 3 5 5 21
Reduce Paper 3 4 3 4 2 16
Reuse Masking's 3 4 3 3 3 16
Reduce waste 3 5 3 5 5 21
We would like to re-circulate the rinse waters from rinse 1 back into system through an ICG unit(similar to the ones we have for pre-treat and the hot water rinse). ICG Unit
ICG unit
2
Theme Selection
Clayton RAssistant Manager SFT
Chris MSFT Coordinator
Glenn BSFT Coordinator
2
280
.10%
5%
Theme Selection – Link to Business Plan
Internal Stakeholders
ManagersCoordinators
Team Leaders Associates
2
External Stakeholders
Customer's
Toyota RAV 4
Honda
City Of Barrie
Environment
Potential New Business
2
SET STANDARD LEVEL
PROJECT
PROBLEM
POTENTIAL ACHIEVEMENT LEVEL
BELOW STANDARD ACHIEVEMENT LEVEL
51.1 Liters Per Minute (current situation)
A planned reduction of water used by 5% (10.22 ) Liters per minute
2
Using our company’s Business Plan a reduction of 5%is our potential achievement level
Project Statement Action : Reduce
Object: Rinse water
Why: to reduce water costs
When: June 1, 2014
What Cost : Less than $ 10,000.00
3
QUALITY CIRCLE PROCESS STEPS JAN FEB MAR APR MAY JUN JUL AUG SEP
1) DEVELOP THE TEAM PLANACTUAL
2) REASON FOR THEME SELECTION PLANACTUAL
3) PROJ ECT STATEMENT PLANACTUAL
4) ACTIVITY PLAN PLANACTUAL
5) SITUATION DESCRIPTION PLANACTUAL
6) SITUATION ANALYSIS PLANACTUAL
7) GOALS AND POTENTIAL BENEFITS PLANACTUAL
8) OBJ ECTIVE DEVELOPMENT PLANACTUAL
9) DEVELOP IMPROVEMENT ALTERNATIVES PLANACTUAL
10) DECISION ANALYSIS PLANACTUAL
11) PDCA - PLAN PLANACTUAL
12) PDCA - DO PLANACTUAL
13) PDCA - CHECK PLANACTUAL
14) PDCA - ACT PLANACTUAL
15) COMPARISON SUMMARY PLANACTUAL
16) ACTIVITY PLAN (PLANNED VS ACTUAL) PLANACTUAL
PLAN
Activity Plan
4
Summer Shutdown Scheduled
5
Situation Description
Pre –Rinse (hot water)
Degreasing Tank
Rinse TankStage 1
Rinse Tank Stage 2
Rinse TankStage 3
Water Flow
Waste Stream
City Water
City Water
Closed loop system
Situation Description
5
Water flowcontrolled by this tap
Water meter recordswater usage
Out to a drain pipe
Pre-rinse 4 risers
Degreasing Tank – 12 risers
Rinse 14 risers
Rinse 25 risers
5
Situation Description
The water then gets dumped into the sewer system
Water then gets stored in the twotanks
Rinse # 1
Rinse # 2
Rinse # 3
As these two tanks get full they dump the waste water
Rinse # 2 Rinse # 1
Water overflow
51.1 Liters of water in per minute
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar0
500
1000
1500
2000
2500
3000
3500
Water Usage 2013 vs 2014
Cubic Metres
of Water
5
Situation Description
Metric conversion:
1 Gallon = 3.78 Liters
5
FINAL RINSE MAKE-UP VOLUMEDATE TIME METER READING CHANGE RUN TIME (mins) FLOW RATE CHECKED BY01-Feb 0:30 123990 0 1080 12.5 RS02-Feb 0:30 135640 11650 1080 12.5 RS03-Feb 0:30 147300 11660 1080 12.5 RS04-Feb 0:00 158360 11060 1050 12.5 RS05-Feb06-Feb07-Feb 12:30AM 169850 11490 1080 12.5 RS08-Feb 12:30AM 181410 11560 1080 12.5 RS09-Feb 12:30AM 193000 11590 1080 12.5 RS10-Feb 12:30AM 204530 11530 1080 12.5 RS11-Feb 12:00AM 215800 11270 1050 12.5 RS12-Feb 4:30PM 221430 5630 510 12.5 RS13-Feb14-Feb 12:30AM 232900 11470 1080 12.5 RS15-Feb 12:30AM 244320 11420 1080 12.5 RS16-Feb 12:30AM 255850 11530 1080 12.5 RS17-Feb 12:30AM 267390 11540 1080 12.5 RS18-Feb 12:00AM 279030 11640 1050 12.5 RS19-Feb 3:00PM 284780 5750 510 12.5 RS20-Feb21-Feb22-Feb 12:30AM 293850 9070 1080 12.5 RS23-Feb 12:30AM 307070 13220 1080 12.5 RS24-Feb 12:30AM 316250 9180 1080 12.5 RS25-Feb 12:00AM 329540 13290 1050 12.5 RS26-Feb 4:30PM 335260 5720 510 12.5 RS27-Feb28-Feb 12:30AM 340220 4960 1080 12.5 RS
216230
216230.0000 GALLONS818519.6368 LITRESTOTALS
5
Data for Situation Description
818519Liters used in February
At a cost of $ 2799.27
5
Current Situation Description
At a cost of
$3296.33
963841Liters used in March
Current Situation Description
5
High water flow into the system51.1 Liters per minute 3066 Liters per hour73,584 Liters per day73.59 M3 at a cost of $3.52 per M3 = $259.04On a daily Basis
High flow out into the drain / sewer 51.1 Liters per Minute3066 Liters per Hour73,584 Liters per day
5
Current Situation Description
Current Situation Description
To summarize:Over the two months of February and March, the fuel tank line used 1,782,360 litres of water
The cost for water for the fuel tank line for these 2 months was $6193.55
5
IDEAL IMAGE
6
The fuel tanks are rinsed thoroughly and the amount of water required to do
the rinsing is reduced to meet thecompany business plan reduction of 5%.There are no quality or customer issues.
Goal Setting
Reduce water flow in by 5 %
Reduction of water flow out will also be the same
Reduce by240,960.4
Liters
963,841.60 Liters
Down to 722,881.20 Liters
6
Using data from March 2014
Savings of $ 824.08
Per Month
Before after 25% Liters0
10
20
30
40
50
60
March
March
A Reduction
Of 5% would be 2.5 Liters
per Minute
New water flow would be 48.5 Liters per
minute
6
Goal Setting
Liters
Old water flowwas 51 Litersper minute
Goal Setting
SPECIFIC – Reduce water flow by 5%.
MEASURABLE – Used flow meter and recorded data on Check Sheet.
ATTAINABLE – With new water meter and daily checks.
RELEVANT – Set standard water flow that saves money.
TRACKABLE – Using Operation Standard and Check Sheet.
6
7
OBJECTIVES MUST WANT
MANDATORY MEASURABLE REALISTIC
Reduce water use
Have a set water Flow
Recycle water usage
Maintain current production
Low cost to implement
No additional manpower
No effect to quality
reduce water flow
Objective Development
8
Develop Improvement AlternativesIdea:
This ICG unit will have to be a bigger system than the ones we currently have; but this regeneration idea will reduce the amount of water we are using and reduce the amount we are wasting.
ICG unit
9
Decision Analysis
This ICG unit will have to be a bigger system than the ones we currently have; but this regeneration idea will reduce the amount of water we are using and reduce the amount we are wasting.
Plan to look at Recycle unit failed because of several factors1. Cost of the unit was too expensive2. Testing time would have taken too long3. Toyota approval needed
It was back to the drawing board!
Decision Analysis
9
Existing meter was not working correctly.
Decision Analysis
9
PlanSchedule install of new meterDevelop check sheet to assure
accuracy of new meter.
DoInstall the new meter
Make the check sheet.
CheckMonitor new meter
Check readings daily.
ActReview other water metersfor possible replacement (oldequipment) with TSS Mgr.
10
PDCA for Meter Replacement
Task Breakdown Tree Diagram and Resource EstimateMaterials Cost - $
Man Hours
500.00 2 hours
12.00 1 hour
.00 1 hour
0.00 1 hour
TOTAL IMPLEMENTATION COST : 512.00 5 hours
Order MeterReplace meter
daily recordings
make check sheet
review other water meters
Replace meter
Tss group
Tim R made the sheet
Dave checked daily , recorded
Tss group
Kevin
10
PDCA
Plan March April May June July Aug Plan
New Meter Install
Develop Check sheet
Monitor Meter
Review Other Meters
10
Plan
Schedule used
New meter installed April 30, 2014for more accurate readings.
Do
11Check sheet made from April on for 2014
Check
12
Data Verification by team member
Act
13
Potential areas for meter install
But wait!* Water tap accessible to anyone - therefore no control of water flow. * No Operation Standard specifying water flow rate.
***Water flow rate at 51 liters per minute!!!!!***
9
Decision Analysis
PlanSchedule install of lock
Develop operation standard to assure everyone understands use.
DoInstall the lock
Make the operation standard.
CheckMonitor the lock
Review with stakeholders
ActReview other taps that areAccessible by anyone with TSS Mgr.
10
PDCA for Tap lock and control
Order lock & keyInstall lock
make sure stakeholder's aware of lock use
Install lockMake operation standard
Review other taps in the plant
Tap Control
Tim R
Tim R made the sheet
Tim R
Tss group
Kevin
10
Plan
Plan March April May June July Aug
Order lock and key Plan
Make operation standard
Review with stakeholders
Complete testing to ensure no quality issues
Review other taps in the plant for replacement
Plan
10
Lock installed on water tapOnly leadership group has key
Laminated alert for stakeholderknowledge of what the lock is for and why it is in place
12
Do
Turn down water flow by adjusting tap
Step1 Step2
Step3
DYNE TESTING
13
Check
CUT CHECKS
Check
13
PH TESTING Check
13
With the tap controlled we did extra testing to ensure no quality issue outflow to the customer.
As we adjusted the water flow we found that it had no effect on paint quality.
13
Check
13
All check results within required
standards
ActPH TESTING
CUT CHECKS
DYNE TESTING
But wait!During a random check we foundthat the water pressure was set at 15psi.
9
Decision Analysis
We checked the operation standard and found that the setting was to be set at the standard range of between 9 and 15 psi!
P.M. Schedule
PlanLowering of PSI level
DoReduce PSI to set standard to
low end of the scale and test for performance
CheckCheck tanks for cleanliness
Perform Dyne
ActChange the standard to 9 PSIShare information with stakeholders
10
PDCA for PSI REDUCTION
11
Plan
Plan March April May June July Aug
Reduce PSI and Check Plan
Set standard
Review with stakeholder's
Review with TSS on other Gauges
DYNE TESTING
13
Check
Another DYNE check done
Data Comparison Summary
Savings of$3105.27
in one month
Reduce the water usage
14
95% reduction
14
Data Comparison Summary
Liters
Before change Planed Goal Actual Result 0
10
20
30
40
50
60
14Liters
51LitersPermin
48.5LitersPermin
15 LitersPermin
Planned Goal vs Actual Result
Data Comparison Summary
Wow!
Water Line before change
14
Data Comparison Summary
Water Line after change
Wastewater trench water level greatly reduced
QUALITY CIRCLE PROCESS STEPS JAN FEB MAR APR MAY JUN JUL AUG SEP
1) DEVELOP THE TEAM PLANACTUAL
2) REASON FOR THEME SELECTION PLANACTUAL
3) PROJ ECT STATEMENT PLANACTUAL
4) ACTIVITY PLAN PLANACTUAL
5) SITUATION DESCRIPTION PLANACTUAL
6) SITUATION ANALYSIS PLANACTUAL
7) GOALS AND POTENTIAL BENEFITS PLANACTUAL
8) OBJ ECTIVE DEVELOPMENT PLANACTUAL
9) DEVELOP IMPROVEMENT ALTERNATIVES PLANACTUAL
10) DECISION ANALYSIS PLANACTUAL
11) PDCA - PLAN PLANACTUAL
12) PDCA - DO PLANACTUAL
13) PDCA - CHECK PLANACTUAL
14) PDCA - ACT PLANACTUAL
15) COMPARISON SUMMARY PLANACTUAL
16) ACTIVITY PLAN (PLANNED VS ACTUAL) PLANACTUAL
PLAN ACTUAL
ACTIVITY PLAN
15
Activity Schedule – Planned vs Actual
Revised work
schedule
Vacation and
Personal
Fuel tank shutdown
Feb water totals March Water Totals April Water Totals May Water Totals June water totals0
200000
400000
600000
800000
1000000
1200000
Liters Used
Liters Used
May water usage was
30,469 litres
June water usage was
25,396 litres
Environment - Less water being treated/less water being used Cost of water decreased
Water usage and waste decreasedAssociate awareness increased
16
APRTHE “DO” MONTH
LegendLiters used per month
May water usage was
30,469 litres
March water
usage was 963,841
litres
February water
usage was 818,519
litres
What was the benefit to our Department ?
Environment Impact
Associate awareness of water waste
Wastewater treatment plant
Power StationsLocal water systems
Predicted water cost savings of $ 37, 263.24 per year.
16
Project benefit
Wow!
COST TO IMPLEMENT
$ 200 for meter $ 300 for labour$ 12 for lock$ 30 for miscellaneous $ 542 Total cost
16
SAVINGS FROM REDUCED WATER USAGE
$3105.27/month OR $155.26/day (based on 20 day working month.
R.O.I. =
Divi
ded
by
R.O.I. = 3.5 days
STAKEHOLDER INVOLVEMENT
16
Project benefit
Henry P Brian LRichard S
Garry D Melissa TMattP
Project benefit
16
STAKEHOLDER INVOLVEMENT
Bruce NPlant Manager
Clayton RAssistant Sft
ManagerChris Mc
Sft Coordinator
Robin MAssistant New model
Manager / Coach
Kevin MTSS Manger Ron R
TSS Coordinator /Coach
Impact on StakeholdersImpact Matsu Customer Environment City of Barrie
Positive Save moneyPride in workEducating Associates
Attention to detail re: paint adhesion
Reduction of water treatment
Efficient industryMore available water in summer crisis
Negative Financial investment Aversion to change
Possible contamination
Reduced revenue
1
Project benefit
Department Pre-treat ImpactAwareness Operation StandardAccurate Water measurementFixed water meter
Plant wide ImpactCost of water usage to-dateshowed a reduction of over$ 12,421.08 dollars for 4 months.
16Before change Planed Goal Actual Result
0
10
20
30
40
50
60
51LitersPermin
48.5LitersPermin
15 LitersPermin
Liters
Project Benefit ( Impact Analysis )
Tim Improvement:
More understanding of Pre-treatImprovement of criticism Leadership Skills
Better understandingCost of water
David Improvement:
More aware of Pre-treatHow much we spend on waterMore InvolvementWhat did I Learn How pre-treat workedWhat is NYC Cost of water
16
Project Benefit ( Impact Analysis )
Kevin Improvement :
Dyne testsMore of understanding of pre-treatUnderstanding of qualityWhat it takes to do PowerPointWhat did I LearnCost of water
16
Project Benefit ( Impact Analysis )
Brian Improvement:
More aware of pre-treatMore aware of quality More aware of Ph testMore aware of Nitrate TestMore of Reuse/ Reduce/ Recycle.Better understanding of cost
Andrew Improvement:
More of how the fuel tank lineInvolvement in Quality Helping with people skillsWorking with PowerPoint Cost of the water
16
Project Benefit ( Impact Analysis )
Tools used
17
QUALITY CIRCLE PROCESS STEPS JAN FEB MAR APR MAY JUN JUL AUG SEP
1) DEVELOP THE TEAM PLANACTUAL
2) REASON FOR THEME SELECTION PLANACTUAL
3) PROJ ECT STATEMENT PLANACTUAL
4) ACTIVITY PLAN PLANACTUAL
5) SITUATION DESCRIPTION PLANACTUAL
6) SITUATION ANALYSIS PLANACTUAL
7) GOALS AND POTENTIAL BENEFITS PLANACTUAL
8) OBJ ECTIVE DEVELOPMENT PLANACTUAL
9) DEVELOP IMPROVEMENT ALTERNATIVES PLANACTUAL
10) DECISION ANALYSIS PLANACTUAL
11) PDCA - PLAN PLANACTUAL
12) PDCA - DO PLANACTUAL
13) PDCA - CHECK PLANACTUAL
14) PDCA - ACT PLANACTUAL
15) COMPARISON SUMMARY PLANACTUAL
16) ACTIVITY PLAN (PLANNED VS ACTUAL) PLANACTUAL
PLAN
Bar graph
Task tree
Smart ChartGantt Chart
Objective Development Chart
Team Members Communication Organization
Circle Knowledge
Trouble shooting
Computer experience Score
Tim R 5 5 5 5 5 25Kevin K 5 5 1 4 4 19Dave S 5 3 1 3 3 15Brian M 4 3 1 3 4 15Andrew T 3 3 1 3 3 12
Team Development Chart
17
Duties Shared Tim lead the team:Showed the team how to do anNYC Presentation.Developed the Presentation.
David did water meter readings.Had a say in the developmentof the Presentation .Did all assigned tasks on time
Brian did the minutes of the meetings.Did nitrate readings.Had a say in the development of the Presentation.Did all assigned tasks on time.
Andrew did the cut checks.Had a say in the Development of thePresentation.Did all assigned taskson time.
Kevin did the Dyne test.Researched the new meter. Had a say in the Presentation.Did all assigned tasks on time.
Thanks for your time
Tim
Dave
Brian
Andrew
Kevin