the touring face 2 face interview brief

11

Upload: mukti-medan

Post on 30-Jun-2015

60 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: The touring face 2 face interview brief
Page 2: The touring face 2 face interview brief

May

Publication &Registration

Application closedJul

Selection and interview

Festrack

Nov

Touring

Aug Dec

Hotline 0800 1 401515

PO Box The Touring JKT 1219 JKS 12012

THE TOURING PHASE

Page 3: The touring face 2 face interview brief

REGIONAL AREA JADWAL F2F VENUE F2F JADWAL FESTRACK

EAST INDO MAKASSAR 22-Aug-13 Kantor AMO Festrack Manado 25 Agustus 2013 EAST INDO MANADO 22-Aug-13 Kantor AMO Festrack Manado 25 Agustus 2013 EAST INDO GORONTALO 22-Aug-13 Kantor AMO Festrack Manado 25 Agustus 2013

KALIMANTAN PONTIANAK 23-Aug-13 Kantor AMO Festrack Banjarmasin 15 September 2013 SUM 1 BANDA ACEH 24-Aug-13 Kantor AMO Festrack Pekanbaru 03 November 2013 SUM 2 PADANG 24-Aug-13 Kantor AMO Festrack Pekanbaru 03 November 2013

JAKARTA BEKASI 24-Aug-13 Kantor AMO Festrack Sukabumi 13 October 2013 JAKARTA BOGOR 24-Aug-13 Kantor AMO Festrack Sukabumi 13 October 2013 JAKARTA KARAWANG 24-Aug-13 Kantor AMO Festrack Sukabumi 13 October 2013

EAST JAVA SURABAYA 24-Aug-13 Kantor AMO Festrack Surabaya 29 September 2013 KALIMANTAN BALIKPAPAN 24-Aug-13 Kantor AMO Festrack Banjarmasin 15 September 2013 KALIMANTAN SAMARINDA 24-Aug-13 Kantor AMO Festrack Banjarmasin 15 September 2013

SUM 2 PEKANBARU 31-Aug-13 Kantor AMO Festrack Pekanbaru 03 November 2013 SUM 3 BATAM 31-Aug-13 Kantor AMO Festrack Manado 25 Agustus 2026 SUM 3 JAMBI 31-Aug-13 Kantor AMO Festrack Pekanbaru 03 November 2013

WEST JAVA BANDUNG 31-Aug-13 Kantor AMO Festrack Sukabumi 13 October 2013 CENTRAL JAVA SURAKARTA 31-Aug-13 Kantor AMO Festrack Surakarta 06 October 2013 KALIMANTAN BANJARMASIN 31-Aug-13 Kantor AMO Festrack Banjarmasin 15 September 2013 KALIMANTAN SAMPIT 31-Aug-13 Hotel Idola Sampit Festrack Banjarmasin 15 September 2013

WEST JAVA CIREBON 3-Sep-13 Kantor AMO Festrack Sukabumi 13 October 2013 SUM 1 MEDAN 1 dan 2 7-Sep-13 Kantor AMO Festrack Pekanbaru 03 November 2013 SUM 1 LHOKSEUMAWE 7-Sep-13 Kantor AMO Festrack Pekanbaru 03 November 2013 SUM 2 BUKITTINGGI 7-Sep-13 Kantor AMO Festrack Pekanbaru 03 November 2013

JAKARTA JAKARTA 1 7-Sep-13 Kantor AMO Festrack Serang 20 October 2013 JAKARTA JAKARTA 2 7-Sep-13 Kantor AMO Festrack Serang 20 October 2013

WEST JAVA SERANG 7-Sep-13 Kantor AMO Festrack Serang 20 October 2013 WEST JAVA SUKABUMI 7-Sep-13 Kantor AMO Festrack Sukabumi 13 October 2013

CENTRAL JAVA SEMARANG 7-Sep-13 Kantor AMO Festrack Surakarta 06 October 2013 CENTRAL JAVA TEGAL 7-Sep-13 Kantor AMO Festrack Surakarta 06 October 2013

JAKARTA TANGERANG 21-Sep-13 Kantor AMO Festrack Serang 20 October 2013 JAKARTA JAKARTA 3 24-Sep-13 Kantor AMO Festrack Serang 20 October 2013 JAKARTA JAKARTA 4 24-Sep-13 Kantor AMO Festrack Serang 20 October 2013 BALI NT KUPANG 24-Sep-13 Kantor AMO Festrack Surabaya 29 September 2013

FACE TO FACE SCHEDULE

Page 4: The touring face 2 face interview brief

FACE TO FACE INTERVIEW SCHEME

No Item Qty Remark

1 Produksi Backdrop 2,44 x 3 m 1 unit Materi Print Visual akan di emailkan

2 Meja Juri 1 set Tolong dipersiapkan kain hitam velvet untuk penutup mejaMeja dari kantor area (mohon dikoordinasikan dgn area)

3 Laptop + Printer 1 unit Materi DYO akan diemail

4 Motorbike (Riding Test) 1 unit Rental warna putih (Tiger, Vixion)

5 Snack & Beverage 30 pax Kue-kue , Lunch box + minumannya

6 Transport Fee @ 200.000 10 pax Pengganti uang transport peserta

7 SDM :• Crew Registrasi• Crew • Phsycholog• Medical

1 pax1 pax1 pax1 team

Register peserta dan mengukur badan peserta

Sebagai juri independent

Cek darah, tes kesehatan peserta

Page 5: The touring face 2 face interview brief

1. Jumlah Peserta yang akan mengikuti Face to Face Interview sebanyak 10 Peserta / area (data dari area – mohon dikoordinasikan)

2. Dilaksanakan 1 hari pelaksanaan3. Penilaian Pemenang berdasarkan hasil Interview dan Riding Test4. Pengukuran Peserta meliputi : (tatacara pengukuran tolong ditanyakan tukang

jahit)• Lingkar dada• Lingkar Pinggang• Panjang tangan• Lebar Punggung

5. Riding Test dilakukan seluruh peserta, mohon dipersiapkan cones kecil untuk membentuk sirkuit motor (quantity akan dikonfirmasi berikutnya)

6. Phase 1 akan dipilih 3 pemenang dari 10 peserta :• Medical Checkup, hasil check up pada hari yang sama

7. Phase 2 akan dipilih 1 pemenang dari 3 Peserta• Medical checkup untuk Brother dilakukan dihari berikutnya .

Page 6: The touring face 2 face interview brief

Customize Bike and Gear Application

Medical Check Up

WINNERS

Winner Announcement

Face to Face Interview

FACE TO FACE MECHANISM

Page 7: The touring face 2 face interview brief

Backdrop

Page 8: The touring face 2 face interview brief

Pengukuran JacketPengukuran helm

Pengukuran Size Gears

Page 9: The touring face 2 face interview brief

MEDICAL CHECK UP

Page 10: The touring face 2 face interview brief

APPLICATION > DYO BIKES AND GEARS

*Note : Details di PPT Terpisah

Page 11: The touring face 2 face interview brief

THANK YOU