THE THOMPSON ECONOMIC DIVERSIFICATION WORKING GROUP
114 |
The City of Thompson | Keewatin Tribal Council | The Manitoba Metis Federation | Manitoba Keewatinowi Okimakanak | Thompson Unlimited
THE THOMPSON ECONOMIC DIVERSIFICATION WORKING GROUP
114 |
The City of Thompson | Keewatin Tribal Council | The Manitoba Metis Federation | Manitoba Keewatinowi Okimakanak | Thompson Unlimited
Student in the Faculty of Trades and Technology at UCN’s existing Campus on Severn Crescent, in Thompson.
INDUSTRIAL SKILLS AND TRADES TRAINING CENTRE: MASTER PLAN
Province of Manitoba | Northern Association of Community Councils | Nisichawayasihk Cree Nation | Thompson Chamber of Commerce | Vale
| 115
Works Cited
Northern Manitoba Sector Council. (2008, Nov., 21). News Release. Retrieved from: http://www.nmscouncil.ca/news/resourc-
es/November%202008%20News%20Release.pdf.
THE THOMPSON ECONOMIC DIVERSIFICATION WORKING GROUP
116 |
The City of Thompson | Keewatin Tribal Council | The Manitoba Metis Federation | Manitoba Keewatinowi Okimakanak | Thompson Unlimited
Students taking UCN’s Facilities Technician program.
| 117
APPENDIX A: LABOUR MARKET SURVEY
QUESTIONNAIRE
118 |
PLEASE RETURN COMPLETED SURVEY via EMAIL, FAX OR MAIL TO:
Pamela Ritchot
c/o rePlan
317 Adelaide Street West, 2nd Floor
Toronto, ON M5V 1P9
Email: [email protected]
Fax: 416-593-4911
Labour Market Survey in support of an Industrial Skills and Trades Training Centre in Thompson, Manitoba
This survey has been put together by a Project Implementation Team (PIT) made up of representatives from the
Northern Manitoba Sector Council, the University College of the North, Vale, Keewatin Tribal Council and
Manitoba Keewatinowi Okimakanak. This interim decision-making body is tasked with the objective of developing
a Master Plan for the centre that will best align the Institutional capacities of a Training facility with the immediate
and fundamental demands of Industry in the region on account of labour market challenges. This Master Plan will
outline a detailed Functional Program and Governance Structure for the Centre as well as a Capital Funding Plan
and business model from which the PIT can leverage support from Industry, government and other interested
parties. This survey hopes to reveal the immediate and long-term needs of industry related to the availability of
skilled tradespeople and apprentices ready to work in the region.
Labour Market Challenges
1) In your experience, are you finding that potential employees are willing to move to Thompson for work?
YES NO
2) In your experience, are you able to attract tradespeople who are adequately qualified and have the
appropriate education or certification required for the positions you seek to fill (i.e. are they able to acquire
the next level in certification)?
YES NO
3) In your experience, how long is your company able to retain apprentices and skilled tradespeople in
Thompson/the North? (please check where applicable)
For less than 1 year For 1-2 years For 2-5 years For more than 5 years
Apprentices
Trade Qualified Professional
/ Journey Person
4) In your opinion, what might be the greatest challenge(s) to finding and retaining skilled tradespeople in
Thompson/the North?
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
Supply and Demand
5) Does your company have an immediate need for trades training? (please circle) YES NO
If so, please use the table below to indicate the number of new hires or upgraded apprentices you expect to
need over the next 1, 3 and 5 years.
TRADE DISCIPLINE AREA 1-YEAR 3-YEAR 5-YEAR
New Hire Apprentice New Hire Apprentice New Hire Apprentice
a) Electrical
b) Industrial Mechanic (Millwright)
| 119
2 | P a g e
c) Heavy-Duty Mechanic
d) Instrument Mechanic
e) Power Engineering
f) Carpentry
g) Plumbing
h) Pipe/Steam Fitter
i) Machinist
j) Welder
k) Other (Specify)
6) What is your confidence that these employees will be found? (please select one)
a) Very likely and quickly as skilled labour is aplenty.
b) Likely, but will require significant time, effort and resources from our company
c) Likely if there is help from external sources (ie: the Provincial government)
d) Not likely found despite all efforts
e) Impossible
7) Please describe the trends or challenges you are facing in your new hires? (please circle all that apply)
a) The majority of new hires are adequately skilled in their trade
b) The majority of new hires require significant improvements to their skill set through various
company-funded training programs (please specify which) _________________________________
c) The majority of new hires are originally from the North ie: consider themselves Northerners.
d) Many new hires are trained in southern Manitoba and will relocate their family to the North for work.
e) Many new hires cannot find housing in the North in order to relocate their families.
f) Many new hires are trained out of Province (please specify where) ___________________________
g) There is a high turnover in new hires in the industry, currently.
h) Lack of Heavy-Industry or Mining-Industry related experience.
i) Lack of trade-specific training for skill-set enhancement in the North.
j) Other (please specify)
_________________________________________________________________________________
_________________________________________________________________________________
8) What area(s) of training does your company see as having the most pressing need for new hires?
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
9) Please indicate if your feel that you could benefit from further information on Provincial training and
resources in the following areas?
a) Provincial support and funding for apprenticeship and trades programming. YES NO
b) Recruitment and retention strategies aimed to increase the number of students in
Northern trades programs. YES NO
c) A comprehensive list of what trades and apprenticeship training programs are currently
being delivered in northern Manitoba. YES NO
d) A comprehensive list of trades and apprenticeship programs currently being delivered
in southern Manitoba. YES NO
e) An evaluation of what kinds of training programs would best meet your company’s
employment needs – including those that aren’t currently being offered. YES NO
f) Information on the number of students who are currently seeking trades and
apprenticeship training in Manitoba. YES NO
120 |
3 | P a g e
Current and Future Practice
10) Please review the table below and indicate if your company anticipates needing to source the listed ongoing
skill development training programs for your employees, over the next 1-5 years.
SKILL DEVELOPMENT COURSE (check if yes) SKILL DEVELOPMENT PROGRAM (check if yes)
WHIMS Environmental Analyst /Technician
Job Search Development Facilities Technician
PLC’s Heavy Equipment Operator
Hydraulics Intro to Industry (Retail/Service,
Mining, Construction, Hydro)
Laser Leveling Laboratory Technician
Air Conditioning Mine Engineering Technician (Survey,
Tent, Geological)
Blasting Mineral Sciences
Civil CAD Pre-Technology
Confined space Adult Learning Centre/GED/Tutoring
Conflict Resolution Camp Cook
Drafting Computer System Technician
E-learning: (Internet, Word, Excel, Power
Diamond Driller / Helper
Electronic Troubleshooting Electrical Engineering Technologist
Engineer – Transition Year Maintenance Management Programs
Fail Arrest Social Readiness Program (Awakening
Failure Analysis Surveying / Bush Skills (Program)
Fall Arrest / CPR Mineral Processing
Ladder Safety Small Engine Repair
Machine Alignment Programs Technical Writing
Managerial and Leadership Mill Concentrator Process Training
Non-Destructive Equipment Other ( please specify)
Open Hole
Preventative Predictive Maintenance
Problem Solving
Procurement / Buyer
Underground Miner (Program)
Water Plant Operator
Transportation of Dangerous Goods
Project Management
Rigging
Interpersonal Communication Training
Other (please specify)
11) How many students are you currently sponsoring through their Apprenticeship training?
a) 0-5
b) 5-10
c) 10-20
d) 20+ (please specify) __________________
| 121
4 | P a g e
12) Where are your sponsored students currently taking their Apprenticeship training?
a) Assiniboine Community College, Brandon
b) Red River College, Winnipeg
c) SkyTech/Cambrian College, Sudbury
d) University College of the North, the Pas
e) Other, (please specify) _______________________________________________________
13) Many Northern companies are forced to look outside of the region or Province for training their new or
existing employees. What training programs are you currently outsourcing to institutions outside of the
region, and to what institutions, specifically, are you outsourcing them?
______________________________________________________________________________________
______________________________________________________________________________________
14) Assuming that a training centre was available in Thompson to deliver the above training programs that you
listed, would you prefer to have these programs offered in Thompson?
YES NO
If NO, please explain ______________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
15) What training model(s) for employees does your company currently undertake? (circle all that apply)
a) Apprenticeship sponsorships
b) Cost-recovery training models
c) Co-op training models
d) Pre-employment training models
e) Other (please specify) _________________________________________________________
16) If Thompson had its own Industrial Skills and Trades Training Centre tailored to specific Northern needs, what
role, if any, would your company ideally like to play in it? (please select any that may apply)
a) Play a formal governing role on the Centre’s Board of Directors.
b) Sit on the Advisory Committees that oversee specific programs.
c) Provide informal input into program development that is of interest to your company.
d) Partner with the Centre to provide co-op placements for students.
e) Utilize Contract Training Programs at the Centre (ie: conduct your own employee training there)
17) In what way (if any) would your company be willing to support an Industrial Skills and Trades Training Centre
in Thompson? (please select any that may apply)
a) Fund the development and construction of a new facility in a one-time donation.
b) Provide funding for the on-going operations of specific programs at the Centre.
c) Make equipment donations for use at the Centre.
d) Sponsor students through their apprenticeships and Pre-Employment Programs.
e) Provide physical shop space for any off-campus training programs.
18) Would your company look to take advantage of the following services?
SERVICE (check if yes)
a) Labour Market Demand and Analysis
b) Workplace Essential Skill Assessments
c) Video Conferencing
d) Job Search Development
e) CWB Testing Centre
f) Welding Simulator
g) Other (specify)
THE THOMPSON ECONOMIC DIVERSIFICATION WORKING GROUP
122 |
The City of Thompson | Keewatin Tribal Council | The Manitoba Metis Federation | Manitoba Keewatinowi Okimakanak | Thompson Unlimited
Students taking the Facilities Technician program work hands-on with their instructor at UCN’s Severn Crescent facilities.
| 123
APPENDIX B: KAL TIRE “TEST SITE” URBAN ANALYSIS
THE THOMPSON ECONOMIC DIVERSIFICATION WORKING GROUP
124 |
The City of Thompson | Keewatin Tribal Council | The Manitoba Metis Federation | Manitoba Keewatinowi Okimakanak | Thompson Unlimited
NELS
ON
RO
AD
STA
NFO
RD
BAY
STANFORD BAY
STATION ROAD
STATION R
OAD
MOAK CRESCENT
Existing Building
ISTTC Build-out
STATION R
OAD
SECONDARY TRAFFIC AXIS
PRIM
ARY T
RAFF
IC A
XIS
PRIMARY TRAFFIC AXIS
PR
IMA
RY T
RA
FFIC
AX
IS
FROM UCN CAMPUS
TO NEW URBANDEVELOPMENT AREAS
TO MYSTERY LAKE ROAD
Figure B.1 - Traf"c axes and #ows around the Kal-Tire test site.
INDUSTRIAL SKILLS AND TRADES TRAINING CENTRE: MASTER PLAN
Province of Manitoba | Northern Association of Community Councils | Nisichawayasihk Cree Nation | Thompson Chamber of Commerce | Vale
| 125
NELS
ON
RO
AD
NELS
ON
RO
AD
STA
NFO
RD
BAY
STANFORD BAY
STATION ROAD
STATION R
OAD
MOAK CRESCENT
SURFACE
PARKING
Existing Building
SECURE
YARD
UCN
FLO
W T
HRO
UGH
YARD
SIDE
ENTRY
PARKINGPRIMARY ENTRANCE
PARKINGSECONDARY ENTRANCE
TRUCK/MACHINEENTRANCE
FUTURE PARKING
EXPANSION AREA
TW
O-W
AY F
LO
W
FLO
W T
HR
OU
GH
TRUCK/MACHINEENTRANCE
Figure B.2 - Proposed vehicular access and #ows on the Kal-Tire test site.
THE THOMPSON ECONOMIC DIVERSIFICATION WORKING GROUP
126 |
The City of Thompson | Keewatin Tribal Council | The Manitoba Metis Federation | Manitoba Keewatinowi Okimakanak | Thompson Unlimited
NELS
ON
RO
AD
NELS
ON
RO
AD
STA
NFO
RD
BAY
STANFORD BAY
STATION ROAD
STATION R
OAD
MOAK CRESCENT
FUTURE PARKING
AND FACILITY
EXPANSION AREA
SURFACE
PARKING
PUBLIC OUTDOOR
PRIVATE
OUTDOOR
ISTTC Build-out
Existing Building
EXPEXP
FUTURE P
AND F
EXPANSION AREA
FUTURE P
AND F
EXPANSION AREA
FUTURE P
AND F
ANSION AREA
FUTURE P
AND F
ANSION AREA
FUTURE P
AND FACILITY
ANSION AREA
FUTURE P
AND FACILITY
ANSION AREA
FUTURE P
AND FACILITY
ANSION AREA
FUTURE PARKING
ACILITY
ANSION AREA
FUTURE PARKING
ACILITY
ANSION AREA
ARKING
ACILITY
ANSION AREA
ARKING
ACILITY
ANSION AREA
ARKINGARKINGARKING
Figure B.3 - Proposed urban intent for future build-out on the Kal-Tire test site.
INDUSTRIAL SKILLS AND TRADES TRAINING CENTRE: MASTER PLAN
Province of Manitoba | Northern Association of Community Councils | Nisichawayasihk Cree Nation | Thompson Chamber of Commerce | Vale
| 127
NELS
ON
RO
AD
NELS
ON
RO
AD
STA
NFO
RD
BAY
STANFORD BAY
STATION ROAD
STATION R
OAD
MOAK CRESCENT
Existing Building
PRIMARYENTRANCE
UCN
INTER
NAL “
STR
EET”
SECONDARYENTRANCE
PRIMARY PEDESTRIAN FLOW
YARD
Figure B.4 - Pedestrian connections will link the test site to existing administration and support at UCN’s Polaris buildings.
THE THOMPSON ECONOMIC DIVERSIFICATION WORKING GROUP
128 |
The City of Thompson | Keewatin Tribal Council | The Manitoba Metis Federation | Manitoba Keewatinowi Okimakanak | Thompson Unlimited
INDUSTRIAL SKILLS AND TRADES TRAINING CENTRE: MASTER PLAN
Province of Manitoba | Northern Association of Community Councils | Nisichawayasihk Cree Nation | Thompson Chamber of Commerce | Vale
| 129
NELS
ON
RO
AD
NELS
ON
RO
AD
STA
NFO
RD
BAY
STANFORD BAY
STATION ROAD
STATION R
OAD
MOAK CRESCENT
ISTTC Build-out
Existing Building
PRINCIPLE FRONTAGE
PRIN
CIP
AL
SIG
HTL
INE
PR
INC
IPA
L S
IGH
TLIN
E
UCN CAMPUS SIGHTLINE
Figure b.5 - Principal site lines position the Kal-Tire test site to at a dynamic location in Thompson’s urban context.
130 |
Shop space at Assiniboine Community College in Brandon, Manitoba.
132 |
In-#oor drainage channel at Assiniboine Community College’s Heavy Duty shop.
| 133
APPENDIX C: ORDER OF MAGNITUDE COSTING
Nichoals Bowe
Senior Consultant
Turner & Townsend cm2r Inc.
One St. Clair Avenue East
Seventh Floor
Toronto
Ontario
M4T 2V7
t: +1 (416)925 1424
w: www.ttcm2r.com
Industrial Trades Training Center
Thompson, MB
Planning Alliance.
Report
For Order of Magnitude
Construction Cost
Estimate
Jan 23rd, 2013
ref no.20566
317 Adelaide Street West,
2nd Floor, Toronto,
ON M5V 1P9
For the attention of Pam Ritchot,
Dear Pam,
INDUSTRIAL TRADES TRAINING CENTRE ORDER OF MAGNITUDE
CONSTRUCTION COST ESTIMATE
We enclose our Order of Magnitude Cost Estimate based on the documentation
provided to us, listed in Section 11 of this report.
Please refer to our Executive Summary, Section 1, 3, 6 & 9 for specific qualifications
and assumptions to this cost report.
We trust this meets with your approval. Should you have any questions please do
not hesitate to contact us.
Yours Truly
Nicholas Bowe
Senior Consultant
cc:
Gerard McCabe, Turner & Townsend cm2r Inc.
Industrial Trades Training Centre, Thompson,
Manitoba
making the difference
1 EXECUTIVE SUMMARY
2 ELEMENTAL COST ANALYSIS � SEQUENCE 1 RETAIN EXISTING (FEB 2013)
3 SEQUENCE 1 ASSUMPTIONS
4 SEQUENCE 1 AREA SUMMARY
5 ELEMENTAL COST ANALYSIS � SEQUENCE 2 ADDITION OF WORKSHOPS (FEB 2014)
6 SEQUENCE 2 ASSUMPTIONS
7 SEQUENCE 2 AREA SUMMARY
8 ELEMENTAL COST ANALYSIS � SEQUENCE 3 NEW TRAINIING FACILITY (FEB 2018)
9 SEQUENCE 3 ASSUMPTIONS
10 SEQUENCE 3 AREA SUMMARY
11 DOCUMENTATION
Rev Originator Approved Date
0 Nicholas Bowe G.McCabe January 23 , 2012
© Turner & Townsend cm2r. All rights reserved January 2013. This document is expressly provided to and
solely for the use of Industrial Trades Training Centre. and must not be quoted from, referred to, used by
or distributed to any other party without the prior consent of Turner & Townsend cm2r who accept no
liability of whatsoever nature for any use by any other party
F:\TOR\JOBS\2013 JOBS - 20553 -\20556CP - INDUSTRIAL TRADES TRAINING CENTER - NB\ORDER OF MAGNITUDE 07.01.2013\REPORT\DRAFTS\REV1
Industrial Trades Training Centre, Thompson,
Manitoba
making the difference
1 EXECUTIVE SUMMARY
1.1 Introduction
Turner and Townsend cm2r is retained to provide Cost Planning & Design Cost Control services including
this report to prepare an Order of Magnitude Construction Cost Estimate. The Estimate is for the �hard�
Construction Cost component of the project only and does not include for any project soft costs.
1.2 Construction
The Construction Cost Estimate includes all direct construction costs, contractor�s overhead and profit and
assumes that the project will be procured on a Stipulated Lump Sum Basis, and that bids will be
received from a minimum of five general contractors. We also assume that the project will be completed
in a reasonable time frame and have not included any premiums required for �fast-tracking� the project.
1.3 Risk Assessment
Post-Contract Contingencies (i.e. for Change Orders that may arise during construction) have been
excluded in our cost report.
No contingency is included in our estimate to allow for construction price escalation for sequence 1 as the
start date is February 2013; a 4% contingency has been allowed for sequence 2, which is anticipated to
start in February 2014 and a 20% contingency has been allowed for sequence 3 which is due to start in
February 2018. Construction Price Escalation beyond February 2018 has been excluded and we
recommend that these contingencies be monitored on a regular basis and/ or prior to tendering.
1.4 Level of Documentation
The estimate is based on the drawings and information provided, and reflects current rates and present
market/local conditions. Based on the level of the Design information available, we have included an
Estimating/Design Contingency allowance.
We strongly recommend maintaining the contingency amounts included and preparing a detailed cost
estimate prior to going to tender.
1.5 Market Conditions
The estimate is based on normal competitive conditions and is intended to fall within a range of bids
received from a number of competitive contractors. Adverse local and global market conditions,
proprietary specifications, single-sourcing of materials and equipment, or lack of bidders may cause bids
to vary from reasonable estimates based on normal competitive conditions.
Industrial Trades Training Centre, Thompson,
Manitoba
making the difference
1.6 Assumptions/Exclusions
Please refer to our Executive Summary and sections 3, 6 and 9 for specific Exclusions and our detailed
report back-up for specific assumptions.
1.7 Limitation of Scope
Turner & Townsend cm2r has been retained to prepare this Order of Magnitude Construction Cost
Estimate and the Project Budget, as part of its overall Cost Consultant Services for this project.
Project No. 20556
Rev. 0
Jan, 2013
INDUSTRIAL TRADES TRAINING CENTRE
ORDER OF MAGNITUDE COST ESTIMATE
ADDITION & RENOVATION
Executive Summary GFA (m2) $/m2 Amount Escalation Total Amount
1 Phase 1 - Renovate Existing Buildings (Feb 2013) 1,155 $1,245 $1,438,000 Nil $1,438,000
2 Phase 2 - New Workshop Additions (Feb 2014) 1,860 $3,857 $7,174,000 $287,000 $7,461,000
3 Phase 3 - Integration of New Training Centre (Feb 2018) 6,372 $2,870 $18,287,000 $3,658,000 $21,945,000
Sub-Total 9,387 $2,866 $26,899,000 $3,945,000 $30,844,000
4 Sequence 1 - Equipment $81,000 Nil $81,000
5 Sequence 2 - Equipment $205,000 $8,200 $214,000
6 Sequence 3 - Equipment $3,000,000 $600,000 $3,600,000
7 Removable Partitions (Sequence 3) $1,250,000 $250,000 $1,500,000
8 Hoist & Crane x 2 nr (Sequence 2) $400,000 $16,000 $416,000
Sub-Total 9,387 $3,391 $31,835,000 $4,819,200 $36,655,000
9 Removal of hazardous materials (Asbestos/ Lead etc) TBC TBC
10 Design Contingency (10%) Included Included
11 Escalation Allowance (4% Per Annum) Included Included
12 Construction Contingency (5%) Excluded Excluded
Total Estimated Construction Cost - (excl. HST) 9,387 $3,391 $31,835,000 $4,819,200 $36,655,000
The following has been specifically excluded:
HSTProfessional Consultant Design FeesSpecialist Consultant Design FeesLegal Fees and ExpensesProject Management FeesFurniture, Furnishings and Equipment (Refer to above)Owner's Administration ExpensesRemoval and disposal of Contaminated MaterialPermits & Development costsPremium Associated with Single-Sourcing if anyKitchen Equipment and appliancesTesting and InspectionsSpecial foundation systemsMoving CostsSignage & GraphicsCommunications active hardwareA/V equipment, devices & wiringLightning protectionFinancing Costs
Industrial Trades Training Center, Thompson,
Manitoba
making the difference
2 ELEMENTAL COST ANALYSIS � SEQUENCE 1 RETAIN EXISTING
(FEB 2013)
ELEMENTAL COST SUMMARY
ORDER OF MAGNITUDE - PHASE 1
RENOVATE EXISTING
Cat:
Project: Industrial Trades Training Centre File: NB-DL-R0
Location: Thompson, Manitoba Date: 9-Jan-13
Owner/Client: Vale Project Number: 20556
Architect: Planning Alliance/ RePlan Gross Floor Area: 1,155 m2
Ratio Elemental Elemental ElementalElement to GFA Quantity Unit Rate Amount Cost/m2 Amount
A SHELL
A1 SUBSTRUCTURE $4.33
A11 Foundation 0.97 1,125 m2 $4.44 $5,000 $4.33
A12 Basement Excavation 0.00 0 m3 $0.00 $0 $0.00 $5,000 0%
A2 STRUCTURE $12.12
A21 Lowest Floor Construction 0.03 30 m2 $266.67 $8,000 $6.93
A22 Upper Floor Construction 0.00 0 m2 $0.00 $0 $0.00
A23 Roof Construction 0.03 30 m2 $200.00 $6,000 $5.19 $14,000 1%
A3 EXTERIOR ENCLOSURE $64.07
A31 Walls Below Grade 0.00 0 m2 $0.00 $0 $0.00
A32 Walls Above Grade 0.09 105 m2 $504.76 $53,000 $45.89
A33 Windows & Entrances 0.00 4 m2 $2,500.00 $10,000 $8.66
A34 Roof Covering 0.03 30 m2 $200.00 $6,000 $5.19A35 Projections 1.00 1,155 m2 $4.33 $5,000 $4.33 $74,000 5%
B INTERIORS
B1 PARTITIONS & DOORS $97.84
B11 Partitions 1.19 1,376 m2 $51.60 $71,000 $61.47
B12 Doors 0.02 18 No $2,333.33 $42,000 $36.36 $113,000 8%
B2 FINISHES $94.37
B21 Floor Finishes 0.98 1,136 m2 $21.13 $24,000 $20.78
B22 Ceiling Finishes 0.98 1,136 m2 $55.46 $63,000 $54.55
B23 Wall Finishes 1.14 1,313 m2 $16.76 $22,000 $19.05 $109,000 8%
B3 FITTINGS & EQUIPMENT $19.91
B31 Fittings & Fixtures 1.00 1,155 m2 $19.91 $23,000 $19.91
B32 Equipment 1.00 1,155 m2 $0.00 $0 $0.00B33 Conveying Systems 0.00 0 stp $0.00 $0 $0.00 $23,000 2%
C SERVICES
C1 MECHANICAL $425.97
C11 Plumbing & Drainage 1.00 1,155 m2 $111.69 $129,000 $111.69
C12 Fire Protection 1.00 1,155 m2 $38.96 $45,000 $38.96
C13 H.V.A.C. 1.00 1,155 m2 $245.02 $283,000 $245.02
C14 Controls 1.00 1,155 m2 $30.30 $35,000 $30.30 $492,000 34%
C2 ELECTRICAL $228.57
C21 Service & Distribution 1.00 1,155 m2 $51.95 $60,000 $51.95
C22 Lighting, Devices & Heating 1.00 1,155 m2 $110.82 $128,000 $110.82C23 Systems & Ancillaries 1.00 1,155 m2 $65.80 $76,000 $65.80 $264,000 18%
NET BUILDING COST (Excluding Site) $947.19 $1,094,000 76%
D SITE & ANCILLARY WORK
D1 SITE WORK $41.56
D11 Site Development 1.00 1,155 m2 $8.66 $10,000 $8.66
D12 Mechanical Site Services 0.00 0 m2 $0.00 $0 $0.00
D13 Electrical Site Services 0.00 0 m2 $0.00 $38,000 $32.90 $48,000 3%
D2 ANCILLARY WORK $12.99
D21 Demolition 1.00 1,155 m2 $12.99 $15,000 $12.99D22 Alterations 0.00 0 m2 $0.00 $0 $0.00 $15,000 1%
NET BUILDING COST (Including Site) $1,001.73 $1,157,000
Z GENERAL REQUIREMENTS & ALLOWANCES
Z1 GEN. REQ. & FEE 13.0% $129.87
Z11 General Requirements 9.0% $104,000 $90.04Z12 Fee 4.0% $46,000 $39.83 $150,000 10%
TOTAL CONSTRUCTION ESTIMATE (Excluding Allowances) $1,307,000 91%
Z2 ALLOWANCES 10.0% $113.42
Z21 Estimating Allowance 10.0% $131,000 $113.42
Z22 Escalation Allowance 0.0% EXCLUDED $0 $0.00
Z23 Construction Allowance 0.0% EXCLUDED $0 $0.00 $131,000 9%GOOD & SERVICES TAX 0.0% EXCLUDED $0 $0.00 $0 0%
TOTAL CONSTRUCTION ESTIMATE (Including Allowances) $1,438,000 100%
Cost/m2
GFA 1,155 m2 $1,245.02
GFA 12,432 sf $115.67
Thompson, Manitoba
Project: Industrial Trades Training Centre File: NB-DL-R0
Location: Thompson, Manitoba Date: 41283
Owner/Client: Vale Project Number: 20556
Architect: Planning Alliance/ RePlan Gross Floor Area: 1155 m2
Description Trade Rate Amount
A1 SUBSTRUCTURE
A11 Foundations
Allowance for foundations to storefront additon + 30 m2 150.00 4,500
TOTAL A11 Foundations 1,125 m2 4.00 4,500
A12 Basement Excavation
No Works Required
TOTAL A12 Basement Excavation 0
TOTAL A1 SUBSTRUCTURE 4,500
Quantity
Page 1
Thompson, Manitoba
Project: Industrial Trades Training Centre File: NB-DL-R0
Location: Thompson, Manitoba Date: 41283
Owner/Client: Vale Project Number: 20556
Architect: Planning Alliance/ RePlan Gross Floor Area: 1155 m2
Description Trade Rate AmountQuantity
A2 STRUCTURE
A21 Lowest Floor Construction
125mm thick Slab on grade + 30 m2 100.00 3,000
Allowance for making good existing slab to main building 342 m2 15.00 5,130
TOTAL A21 Lowest Floor Construction 30 m2 271.00 8,130
A22 Upper Floor Construction
No Works Required
TOTAL A22 Upper Floor Construction m2 #DIV/0! 0
A23 Roof Construction
38mm thick metal deck on structural steel frame + 30 m2 60.00 1,800Structural steel framing - columns, beams, OWSJ and
conections (35kg/m2) 1,050 kg 4.00 4,200
TOTAL A23 Roof Construction 30 m2 200.00 6,000
TOTAL A2 STRUCTURE 14,130
Page 2
Thompson, Manitoba
Project: Industrial Trades Training Centre File: NB-DL-R0
Location: Thompson, Manitoba Date: 41283
Owner/Client: Vale Project Number: 20556
Architect: Planning Alliance/ RePlan Gross Floor Area: 1155 m2
Description Trade Rate AmountQuantity
A3 EXTERIOR ENCLOSURE
A31 Walls Below Grade
No Works Required
TOTAL A31 Walls Below Grade 0
A32 Walls Above Grade
Aluminum panel / concrete block wall to addition at front
of building + 105 m2 500.00 52,500
TOTAL A32 Walls Above Grade 105 m2 500.00 52,500
A33 Windows & Entrances
Glazed entrance door + 4 no 2500.00 10,000
TOTAL A33 Windows & Entrances 4 no 2500.00 10,000
A34 Roof Covering
Built up roof system inc insulation etc + 30 m2 200.00 6,000
TOTAL A34 Roof Covering 30 m2 200.00 6,000
A35 Projections
Undetailed for miscellaneous projections 1 sum 5000.00 5,000
TOTAL A35 Projections 1,155 m2 4.33 5,000
TOTAL A3 EXTERIOR ENCLOSURE 73,500
TOTAL A SHELL 92,130
Page 3
Thompson, Manitoba
Project: Industrial Trades Training Centre File: NB-DL-R0
Location: Thompson, Manitoba Date: 41283
Owner/Client: Vale Project Number: 20556
Architect: Planning Alliance/ RePlan Gross Floor Area: 1155 m2
Description Trade Rate AmountQuantity
B1 PARTITIONS & DOORS
B11 Partitions
Allowance for drywall partitions to new addition + 30 m2 120.00 3,600
Furring/ Drywall to existing walls + 892 m2 45.00 40,140
Furring/ Insulation/ Drywall to Workshops + 257 m2 70.00 17,990
Furring/ Drywall only to Workshops + 197 m2 45.00 8,865
TOTAL B11 Partitions 1,376 m2 51.30 70,595
B12 Doors
Vestibule doors + 4 no 2500.00 10,000
Overhead door to Carperntry Building 6000mm x
4250mm (automatic) + 2 no 15000.00 30,000
Allowance for repainting internal doors + 12 no 150.00 1,800
TOTAL B12 Doors 18 no 2322.22 41,800
TOTAL B1 PARTITIONS & DOORS 112,395
Page 4
Thompson, Manitoba
Project: Industrial Trades Training Centre File: NB-DL-R0
Location: Thompson, Manitoba Date: 41283
Owner/Client: Vale Project Number: 20556
Architect: Planning Alliance/ RePlan Gross Floor Area: 1155 m2
Description Trade Rate AmountQuantity
B2 FINISHES
B21 Floor Finishes
Vinyl composite tile to Classrooms/ Corridor/ Server/
Kitchen + 189 m2 35.00 6,615
Carpet to Admin/ Offices + 39 m2 75.00 2,925
Tiles to Washrooms + 14 m2 120.00 1,680
Allowance for concrete sealer to floors + 864 m2 10.00 8,640
Vinyl composite tile to new build area + 30 m2 35.00 1,050
Allowanc for floor bases 544 lf 6.00 3,264
TOTAL B21 Floor Finishes 1,136 m2 21.28 24,174
B22 Ceiling Finishes
Acoustic ceiling tile on suspended grid + 208 m2 60.00 12,480
13mm thick on suspended Gypsum Board ceiling
(Reception/ Vestibule) + 34 m2 100.00 3,400
13mm thick Gypsum Board ceiling on suspended carring
/ furring channels (Carpentry ShopS) + 355 m2 100.00 35,500
Extra over for Insulation (Carpentry Shop) 184 m2 25.00 4,600
Paint to exposed + 509 m2 10.00 5,090
Acoustic ceiling tile to new build area + 30 m2 70.00 2,100
TOTAL B22 Ceiling Finishes 1,136 m2 55.61 63,170
B23 Wall Finishes
Tiles to washrooms + 66 m2 120.00 7,920
Allowance for tile backsplash to kitchen/ sever 1 ls 1500.00 1,500
Painting to walls + 1,247 m2 10.00 12,470
TOTAL B23 Wall Finishes 1,313 m2 16.67 21,890
Page 5
Thompson, Manitoba
Project: Industrial Trades Training Centre File: NB-DL-R0
Location: Thompson, Manitoba Date: 41283
Owner/Client: Vale Project Number: 20556
Architect: Planning Alliance/ RePlan Gross Floor Area: 1155 m2
Description Trade Rate AmountQuantity
TOTAL B2 FINISHES 109,234
Page 6
Thompson, Manitoba
Project: Industrial Trades Training Centre File: NB-DL-R0
Location: Thompson, Manitoba Date: 41283
Owner/Client: Vale Project Number: 20556
Architect: Planning Alliance/ RePlan Gross Floor Area: 1155 m2
Description Trade Rate AmountQuantity
B3 FITTINGS & EQUIPMENT
B31 Fittings & Fixtures
Allowance + 1,155 sf 20.00 23,100
TOTAL B31 Fittings & Fixtures 1,155 m2 20.00 23,100
B32 Equipment
Excluded + 1,155
TOTAL B32 Equipment 1,155 0 0.00 0
B33 Conveying Systems
No Works Required
TOTAL B33 Conveying Systems 0
TOTAL B3 FITTINGS & EQUIPMENT 23,100
TOTAL B INTERIORS 244,729
Page 7
Thompson, Manitoba
Project: Industrial Trades Training Centre File: NB-DL-R0
Location: Thompson, Manitoba Date: 41283
Owner/Client: Vale Project Number: 20556
Architect: Planning Alliance/ RePlan Gross Floor Area: 1155 m2
Description Trade Rate AmountQuantity
C1 MECHANICAL
C11 Plumbing & Drainage
Equipment
water meter and backflow preventer- Reuse existingdomestic water heater - Reuse existingsanitary sump pumps- assume not requiredstorm sump pumps- assume not requiredsump pits to ditto - See structural
acid waste dispensing system - assume not requiredoil interceptor 1 no 7500.00 7,500compressed air system 1 sum 30000.00 30,000(Subtotal Equipment $37,500 )
Pipingallowance for piping 1,125 m2 40.00 45,000allowance for trenching/X-ray/Coring 1 sum 7500.00 7,500Video inspection 1 sum 5000.00 5,000(Subtotal Piping $57,500 )
Fixturesallowance for fixtures 1,125 m2 30.00 33,750(Subtotal Fixtures $33,750 )
TOTAL C11 Plumbing & Drainage 1,155 m2 111.47 128,750
C12 Fire Protection
Sprinkler systemnew sprinkler coverage 1,125 m2 35.00 39,375connect to existing 1 sum 3000.00 3,000(Subtotal Sprinkler system $42,375 )
Standpipe systemAssume not required(Subtotal Standpipe system $0 )
Miscellaneousfire extinguishers 1 sum 2500.00 2,500(Subtotal Miscellaneous $2,500 )
TOTAL C12 Fire Protection 1,155 m2 38.85 44,875
Page 8
Thompson, Manitoba
Project: Industrial Trades Training Centre File: NB-DL-R0
Location: Thompson, Manitoba Date: 41283
Owner/Client: Vale Project Number: 20556
Architect: Planning Alliance/ RePlan Gross Floor Area: 1155 m2
Description Trade Rate AmountQuantity
C13 HVAC
Demolitionallowance for selective demolition 1,125 m2 15.00 16,875fuel oil system- not required(Subtotal Demolition $16,875 )
Air HandlingAir handling unit- Electric heating, supply fan, heat
recovery system, assume 4,000cfm 2,000 cfm 8.00 16,000Air handling unit- Electric heating, supply fan, heat
recovery system, assume, 8,000cfm 4,000 cfm 8.00 32,000Smoke Exhaust fans 1 sum 10000.00 10,000Exhaust fans 1 sum 5000.00 5,000Tail pipe exhaust system -allowance 2 no 15000.00 30,000duct collection system 1 sum 75000.00 75,000(Subtotal Air Handling $168,000 )
Heating Plantnot required(Subtotal Heating Plant $0 )
Cooling Plantnot required(Subtotal Cooling Plant $0 )
Miscellaneoustesting and balancing 1 sum 4000.00 4,000fuel oil system- not required(Subtotal Miscellaneous $4,000 )
Pipingnatural gas 100 m 85.00 8,500(Subtotal Piping $8,500 )
Ductwork and Air Distributiongalvanized steel ductwork 3,300 kg 17.00 56,100stainless steel ductwork to fume hood 2 no 5000.00 10,000diffusers, registers and grilles 81 no 120.00 9,688fire wrapping to fume hood exhaust ductwork 1 sum 10000.00 10,000VAV boxes- assume not required(Subtotal Ductwork and Air Distribution $85,788 )
Heating Devicesunit heater- reuse existing(Subtotal Heating Devices $0 )
TOTAL C13 HVAC 1,155 m2 245.16 283,163
Page 9
Thompson, Manitoba
Project: Industrial Trades Training Centre File: NB-DL-R0
Location: Thompson, Manitoba Date: 41283
Owner/Client: Vale Project Number: 20556
Architect: Planning Alliance/ RePlan Gross Floor Area: 1155 m2
Description Trade Rate AmountQuantity
C14 Controls
Full DDC controlroof top units 2 no 10000.00 20,000CO2/CO/NO sensors- reuse existingunit heaters /force flow heater 0 no 500.00fume hoods 2 no 5000.00 10,000Interface with existing 1 sum 5000.00 5,000
TOTAL C14 Controls 1,155 m2 30.30 35,000
TOTAL C1 MECHANICAL 491,788
Page 10
Thompson, Manitoba
Project: Industrial Trades Training Centre File: NB-DL-R0
Location: Thompson, Manitoba Date: 41283
Owner/Client: Vale Project Number: 20556
Architect: Planning Alliance/ RePlan Gross Floor Area: 1155 m2
Description Trade Rate AmountQuantity
C2 ELECTRICAL
C21 Service & Distribution
Normal PowerAllowance for Main Building: New 347/600V 3P 4W service entrance distribution panel
to Heavy Duty Shop 1 no 21000.00 21,000Concrete base 1 no 400.00 400Meter cabinet c/w empty conduit to exterior 1 no 1500.00 1,500Main panel feeder 1 no 800.00 800Allowance for Shed: New 120/208V 1P 3W service entrance panel 1 no 3000.00 3,000Main disconnect 1 no 660.00 660Hangers 2 no 120.00 240Meter cabinet c/w empty conduit to exterior 1 no 1200.00 1,200Panel feeder 1 no 500.00 500Modification to grounding 1 sum 1500.00 1,500Permits, testing, job setup, etc. 1 sum 5000.00 5,000(Subtotal Normal Power $35,800 )
Emergency Power - Use emergency battery units 1 sum 0.00(Subtotal Emergency Power $0 )
DistributionAllowance for: - Panels, transformers & feeders 1 sum 10000.00 10,000EPO buttons to labs 1 sum 6000.00 6,000No additional distribution required for shed 1 sum 0.00(Subtotal Distribution $16,000 )
Motor WiringAllowance for wiring to mechanical equipment 1 sum 7900.00 7,900(Subtotal Motor Wiring $7,900 )
TOTAL C21 Service & Distribution 1,155 m2 51.69 59,700
C22 Lighting, Devices & Heating
LightingAllowance for areas not yet designed: Office area 60 m2 86.00 5,160Classroom 55 m2 97.00 5,335Kitchen, lunch 16 m2 75.00 1,200Lab, workshop 674 m2 65.00 43,810Meeting Room 12 m2 108.00 1,296Corridor, vestibule 80 m2 75.00 6,000
Page 11
Thompson, Manitoba
Project: Industrial Trades Training Centre File: NB-DL-R0
Location: Thompson, Manitoba Date: 41283
Owner/Client: Vale Project Number: 20556
Architect: Planning Alliance/ RePlan Gross Floor Area: 1155 m2
Description Trade Rate AmountQuantity
Storage 190 m2 54.00 10,260Washrooms 14 m2 65.00 910Service rooms 5 m2 54.00 270Task lighting to high bay workshop c/w wiring 1 sum 2000.00 2,000Emergency battery units, remote heads, wiring, etc. 1 sum 4500.00 4,500Exterior building mounted light fixture c/w wiring 12 no 650.00 7,800Low voltage lighting controls 1 sum 5000.00 5,000(Subtotal Lighting $93,550 )
PowerAllowance for areas not yet designed: Office area 60 m2 32.00 1,920Classroom 55 m2 43.00 2,365Kitchen, lunch 16 m2 22.00 352Lab, workshop 674 m2 8.00 5,392Meeting Room 12 m2 43.00 516Corridor, vestibule 80 m2 16.00 1,280Storage 190 m2 11.00 2,090Washrooms 14 m2 11.00 154Service rooms 5 m2 11.00 55Power connection to automatic door 2 no 350.00 700Push button to automatic door 4 no 150.00 600Power connection to O/H doors 1 sum 2000.00 2,000Power connection to lab equipment 1 sum 10000.00 10,000Power connection to kitchen equipment 1 sum 1500.00 1,500(Subtotal Power $28,930 )
HeatingPower connections to electric heating devices 1 sum 6000.00 6,000(Subtotal Heating $6,000 )
TOTAL C22 Lighting, Devices & Heating 1,155 m2 111.23 128,465
C23 Systems & Ancillaries
Fire AlarmAllowance for temporary single stage fire alarm system
c/w devices, testing, etc. 1 sum 12000.00 12,000Allowance for system tie-ins 1 sum 1000.00 1,000(Subtotal Fire Alarm $13,000 )
SecurityEquipment, devices & wiring - By others 1 sum 0.00Allowance for empty conduit 1 sum 6000.00 6,000(Subtotal Security $6,000 )
CommunicationEmpty conduit outlet:Telephone outlet 6 no 130.00 780Data outlet 12 no 130.00 1,560Telephone/data outlet 8 no 130.00 1,040
Page 12
Thompson, Manitoba
Project: Industrial Trades Training Centre File: NB-DL-R0
Location: Thompson, Manitoba Date: 41283
Owner/Client: Vale Project Number: 20556
Architect: Planning Alliance/ RePlan Gross Floor Area: 1155 m2
Description Trade Rate AmountQuantity
Cable TV outlet 4 no 130.00 520Cabling for the above 38 no 180.00 6,840Plywood backboard 2 no 130.00 260
Allowance for trunk conduit & cabling to server room 1 sum 3500.00 3,500Allowance for system tie-ins 1 sum 1000.00 1,000Allowance for racks, switches, etc. 1 no 5000.00 5,000Active hardware - by others 1 sum 0.00(Subtotal Communication $20,500 )
P.A. System - Assume not required in this phase 1 sum 0.00(Subtotal P.A. System $0 )
A/V SystemEquipment, devices & wiring - by others 1 sum 0.00Empty conduit for: - Classrooms 2 no 3000.00 6,000Meeting Room - open area 1 no 5000.00 5,000(Subtotal A/V System $11,000 )
MiscellaneousAllowance for: - Demolition 1 sum 15000.00 15,000Rentals of hoists, cherry pickers, etc. 1 sum 3000.00 3,000Testing & commissioning 1 sum 5000.00 5,000Power to trailer workshop 1 sum 2000.00 2,000Cutting & patching - Assume by GC 1 sum 0.00Clock system - Assume none required 1 sum 0.00Lightning protection - Assume none required 1 sum 0.00(Subtotal Miscellaneous $25,000 )
TOTAL C23 Systems & Ancillaries 1,155 m2 65.37 75,500
TOTAL C2 ELECTRICAL 263,665
TOTAL C SERVICES 755,453
NET BUILDING COST (EXCLUDING SITE) 1,092,312
Page 13
Thompson, Manitoba
Project: Industrial Trades Training Centre File: NB-DL-R0
Location: Thompson, Manitoba Date: 41283
Owner/Client: Vale Project Number: 20556
Architect: Planning Alliance/ RePlan Gross Floor Area: 1155 m2
Description Trade Rate AmountQuantity
D1 SITE WORK
D11 Site Development+ 1,155 m2
Allowance for miscellaneous site development at new
entrance 1 sum 10000.00 10,000
TOTAL D11 Site Development 1,155 m2 8.66 10,000
D12 Mechanical Site Services
TOTAL D12 Mechanical Site Services 0
D13 Electrical Site Services
Building ServicePower:Allowance for Manitoba Hydro charges to Re-connect
main building & shed, and to remove 120/208 service
from main building 1 sum 20000.00 20,000Communications:Allowance for utility charges 1 sum 5000.00 5,000(Subtotal Building Service $25,000 )
Site Lighting & PowerAllowance for connection to motorized gate 1 no 850.00 850
Allowance for duct bank between main building and shed 1 sum 12000.00 12,000(Subtotal Site Lighting & Power $12,850 )
TOTAL D13 Electrical Site Services 37,850
TOTAL D1 SITE WORK 47,850
Page 14
Thompson, Manitoba
Project: Industrial Trades Training Centre File: NB-DL-R0
Location: Thompson, Manitoba Date: 41283
Owner/Client: Vale Project Number: 20556
Architect: Planning Alliance/ RePlan Gross Floor Area: 1155 m2
Description Trade Rate AmountQuantity
D2 ANCILLARY WORK
D21 Demolition+ 1,155 m2
Misscellanious demolition 1 sum 15000.00 15,000
TOTAL D21 Demolition 1,155 m2 12.99 15,000
D22 Alterations
TOTAL D22 Alterations 0
TOTAL D2 ANCILLARY WORK 15,000
TOTAL D SITE & ANCILLARY WORK 62,850
NET BUILDING COST (INCLUDING SITE) 1,155,162
Page 15
Thompson, Manitoba
Project: Industrial Trades Training Centre File: NB-DL-R0
Location: Thompson, Manitoba Date: 41283
Owner/Client: Vale Project Number: 20556
Architect: Planning Alliance/ RePlan Gross Floor Area: 1155 m2
Description Trade Rate AmountQuantity
Z1 GENERAL REQUIREMENTS & FEE
Z11 General Requirements
General Requirements ls 104,000
TOTAL Z11 General Requirements 104,000
Z12 Fee
Fee ls 46,000
TOTAL Z12 Fee 46,000
TOTAL Z1 GENERAL REQUIREMENTS & FEE 150,000
TOTAL CONSTRUCTION ESTIMATE EXCLUDING ALLOWANCES 1,305,162
Page 16
Thompson, Manitoba
Project: Industrial Trades Training Centre File: NB-DL-R0
Location: Thompson, Manitoba Date: 41283
Owner/Client: Vale Project Number: 20556
Architect: Planning Alliance/ RePlan Gross Floor Area: 1155 m2
Description Trade Rate AmountQuantity
Z2 CONTINGENCIES
Z21 Estimating Contingency
Estimating Contingency ls 131,000
TOTAL Z21 Estimating Contingency 131,000
Z22 Escalation Contingency
Escalation Contingency - Excluded ls 0
TOTAL Z22 Escalation Contingency 0
Z23 Construction Contingency
Construction Contingency - Excluded ls 0
Total Z23 Construction Contingency 0
TOTAL Z2 CONTINGENCIES 131,000
TOTAL Z GENERAL REQUIREMENTS & CONTINGENCIES 281,000
TOTAL BUILDING COST INCLUDING ALLOWANCES 1,436,162
Page 17
Industrial Trades Training Center, Thompson,
Manitoba
making the difference
3 SEQUENCE 1 ASSUMPTIONS
Renovation to existing shed type buildings
- Insulate existing shed type building by lining walls/ Ceiling with batt insulation/ drywall
- 2 x new overhead doors
- Paint interior walls
- New electrical distribution and lighting
Height of external walls: 4.25m
Apex height of roof: 5.5m
Renovation to existing main building
- New floor/ ceilings/ wall finishes to everywhere
- Repaint existing doors
- Remove/ Replace Mechanical/ Electrical/ Plumbing
Partition Height: 4m
Ceiling height: 3m
Small addition to main building
- New construction (assume 30m2)
o Slab on grade
o Steel frame
o Built up roof system
o New glazed entrance doors
o Exterior walls - Aluminum panel/ concrete block wall
Height of external walls: 4.25m
Ceiling height: 3m
Industrial Trades Training Center, Thompson,
Manitoba
making the difference
Renovation to existing Heavy Duty Shop
- Sealed concrete floor finish
Mechanical
- Reuse existing domestic water heater
- New Compressed air system
- New Oil interceptor
- Full Sprinkler coverage
- Reuse existing unit heaters
- New ventilation Air Handling Units with gas fired heating. No cooling required
- Reuse existing control systems
Electrical
- Task lighting to workshop
- Temporary fire alarm panel
- Empty conduit for security
- Shed will be reconnected with its own 120/208V service.
Site Works
- General Allowance for site development (leveling site with Grade A gravel, making good around
new entrance etc)
Industrial Trades Training Center, Thompson,
Manitoba
making the difference
4 SEQUENCE 1 AREA SUMMARY
✁ ✂ ✄ ☎ ✆ ✝ ✞ ✟ ✠ ✡ ✡ ☛☞ ✌ ✍ ✎ ✌ ✁ ✏ ✠ ✑ ✟ ✠ ✒ ✓ ✔ ✍ ✕ ✎ ✖ ✝ ✁ ✗ ✌ ✘ ✙ ✚ ✗ ✘ ✘ ✖ ✌ ✍ ✕ ✛ ✁ ✌ ✕ ☎ ✖ ✛ ✁ ✌ ✗ ✍ ✗ ✍ ✜ ✢ ☎ ✍ ✝ ✁ ☎ ✣ ✙ ☎ ✤ ✎ ☎ ✍ ✆ ☎ ✠ ✒✥ ✍ ✆ ✘ ✂ ✖ ☎ ✕ ✦ ✧ ★ ✩ ✪ ✂ ✗ ✕ ✦ ✧ ★ ✩ ✫ ✬ ✭ ✦ ✧ ★ ✩ ✫ ✬ ✭ ✦ ✖ ✮ ✩ ☎ ✁ ✯ ✦ ✧ ✩✭ ✰ ✂ ✱ ☎ ✫ ✁ ✌ ✕ ☎✲ ✳ ✴ ✵ ✶ ✷ ✸ ✹ ✺ ✻ ✶ ✶ ✵ ✼ ✻ ✽ ✸ ✳ ✾ ✿ ❀ ❁ ✿ ✳ ✾ ✿ ❀ ❁ ✳ ✳ ✾ ❂ ❃ ❂ ❄ ❅ ❆❇ ❈ ✲ ❉ ❊ ❋ ✷ ✻ ❈ ● ✺ ✵ ✶ ✸ ❉ ❈ ✸ ❉ ✵ ✽ ✸ ❍ ❈ ❆ ✿ ❆ ✿ ❆ ❄ ❆✛ ✂ ✝ ✌ ✘ ✒ ■ ✒ ✟ ✡ ✠ ✒ ■ ✒ ✟ ✡ ✒ ✟ ■ ✒ ✒ ✠ ✟ ☛ ✓❏ ☎ ✝ ✫ ✁ ✂ ✖ ✖ ✗ ✍ ✜ ✬ ✌ ✆ ✝ ✂ ✁✽ ❑ ▲ ▼ ◆ ● ✵ ❖ p ❖ ◗ ❘ ▼ ❙ ◆ ❄ ❂ ❏ ☎ ✝ ✳ ✾ ✿ ❄ ❅ ✒ ✠ ✠ ❚❍ ❯ ❱ ❲ ❲ ❁ ❁ ✢ ✗ ✁ ✆ ✎ ✘ ✌ ✝ ✗ ✂ ✍ ❃ ✿ ❳ ❚❨ ▼ ❘ p ❩ ❖ ◆ ● ✻ ❬ ◆ p ❩ ✵ ❙ ❙ ▲ ✳ ❅ ❭ ☎ ✆ ❪ ❫ ✥ ✘ ☎ ✆ ✿ ✠ ❚✻ ❱ ❴ ❵ ❈ ❯ ❖ p ❘ ❛ ▼ p ❱ ❯ ● ✼ ❯ ❬ ▲ ❴ ▼ ◆ ❜ ✳ ❄ ❁ ❝ ✌ ✘ ✘ ✖ ❫ ✙ ❪ ✌ ✮ ✝ ✖ ✳ ❀ ✟ ❚✻ ❱ ❴ ❵ ❞ ❖ ❱ ❡ ❢ ✹ ❬ ❘ ❢ ✲ ❩ ❙ ◗ ❄ ❀ ❆ ✛ ✂ ✝ ✌ ✘ ✳ ✾ ✳ ❄ ❁ ✒ ✒ ✠ ❚✻ ❱ ❴ ❵ ✼ ❯ ❬ ▲ ❴ ▼ ◆ ❜ ❣ ❈ ❯ ❖ p ❘ ❛ ▼ p ❱ ❯ ❄ ❄ ✿✻ ❱ ❴ ❵ ❤ ❖ ❯ ❑ ▼ ◆ ❜ ✲ ❩ ❙ ◗ ❉ ❛ ❱ ▼ ❯ ❖ ❛ ❆ ❅✶ ✐ ✐ ▼ p ❖ ❵ ❊ ◆ ❲ ❘ ❛ ❬ p ❘ ❙ ❛ ❆ ❆✲ ❖ ❛ ❡ ❖ ❛ ✵ ❥ ❁✲ ▲ ❱ ❯ ❯ ❥ ❖ ❖ ❘ ▼ ◆ ❜ ✶ ◗ ❖ ◆ ✳ ❄✲ ❘ ❙ ❛ ❱ ❜ ❖ ❁ ❁✲ ❘ ❛ ❜ ❵ ✼ ❯ ❬ ▲ ❴ ▼ ◆ ❜ ❣ ❈ ❯ ❖ p ✸ ❙ ❘ ❊ ◆ ❲ ❬ ❯ ❘ ❑ ✳ ❆ ❁❤ ❱ ❲ ❩ ❛ ❙ ❙ ▲ ✳ ❦ ✒ ■ ✠ ✟ ☛✢ ✗ ✁ ✆ ✎ ✘ ✌ ✝ ✗ ✂ ✍❇ ❖ ❲ ❘ ▼ ❴ ❬ ❯ ❖ ❂❍ ❙ ❛ ❛ ▼ ❑ ❙ ❛ ❂ ❆ ❳ ✠❭ ☎ ✆ ❪ ❫ ✥ ✘ ☎ ✆ ✠❝ ✌ ✘ ✘ ✖ ❫ ✙ ❪ ✌ ✮ ✝ ✖ ✒ ✑✛ ✂ ✝ ✌ ✘ ✒ ■ ✒ ✟ ✡
✭ ❧ ✥ ✭ ✙ ♠ ❭ ❭ ✭ ❧ ♥
✽ ❛ ❖ ❱ ✲ ❬ ▲ ▲ ❱ ❛ ❢✳ ❙ ✐ ❄
♦ ♣"# $%✉ ✈✇①②②③ ④ ⑤ ⑥⑦⑤♣⑧①⑨✇①⑩❶
❷ ⑥❸ ⑦❹✉ ♣❺ ⑤❻❼❽❺❻❻ ❹⑤⑥❸❾ ♣⑤❸ $❹❾ ♣⑤❺ ⑥❺ ⑥❿➀ $⑥✉ ♣$ ➁❼ $➂⑦$⑥%$①⑩
➃ ""➄➅ $❹%♣❺ ➆✉❺ "⑥➇❻ ""♣➈ ♣$⑤♦ $♣❺ ➄$✉ $♣➇❻ ""♣➉ ⑤❹$➊ ⑤❻❻➀ $❺❻❺ ⑥❿
➋➌ ➍➎ ➏➐ ➑ ➒➓➒➔→➎ ➣ ➏
↔↕↔➙➛ ➜ ➝➔➒→➋➞➞ ➣➟➜➏➓➒
➔➜➎ ➏→➠➑➡➢
➛➞ ➜➤➤
↔➥↔➦➧➎ ➏ ➨➞➋➞➞ ➣➟➜➏➓➒
➔➜➎ ➏→➋➛➩
➛➞ ➜➤➤
↔↕↔➦➧➎ ➏ ➨➞➋➞➞ ➣➟➜➏➓➒
➔➜➎ ➏→➋➛➩
➛ ➣➝➝➎➌ ➣➝
↕➫➭➦➧➎ ➏ ➨➞➋➞➞ ➣➟➜➏➓➒
➔➜➎ ➏→➋➛➩
➯➎ → ➓➲ ➒➏➐ ➳ ➵➏➓➲➑ ➣➣➍
➦➙➦➙➧➎ ➏ ➨➞➋➞➞ ➣➟➜➏➓➒
➔➜➎ ➏→➋➛➩
➳ ➜➸ ➺➻➞ ➒➓→ ➝➎ ➓➜➞➐ ➼ ➞ ➵➍➸➎ ➏ ➽➦↔➭➦➼➛➋➞➞ ➣➟➜➏➓➒➻ ➾ ➓➞ ➵➌ ➒➌➻➚
➳ ➜➸ ➺➪ ➒➜➶➨➠ ➵→ ➨➹➲ ➣➔
↔➘➫➦➼➛➴➴➻➚
➳ ➜➸ ➺➼➞ ➵➍➸➎ ➏➽➷➻➞ ➒➓→ ➝➎ ➓➜➞↔↔➴➙➦➼➛➋➞➞ ➣➟➜➏➓➒
➔➜➎ ➏→➠➑➡➢
➳ ➜➸ ➺➢ ➒➞➌➎ ➏➽➹➲ ➣➔➩ ➝➜➎➞ ➒➝➫➙➫➬➼➛➋➞➞ ➣➟➜➏➓➒
➔➜➎ ➏→➻➚
➮➱➱ ➎ ➓➒➺✃ ➏➤→ ➝➵➓→ ➣➝
➥➦➦➧➎ ➏➨➞➋➞➞ ➣➟➜➏➓➒
➔➜➎ ➏→➋➛➩
➮➱➱ ➎ ➓➒➺✃ ➏➤→ ➝➵➓→ ➣➝
↕➦➦➧➎ ➏ ➨➞➋➞➞ ➣➟➜➏➓➒
➔➜➎ ➏→➋➛➩
➮➱➱ ➎ ➓➒➺✃ ➏➤→ ➝➵➓→ ➣➝
➘➦↔➧➎ ➏➨➞➋➞➞ ➣➟➜➏➓➒
➔➜➎ ➏→➋➛➩
➮➱➱ ➎ ➓➒➺✃ ➏➤→ ➝➵➓→ ➣➝
➘➦↔➧➎ ➏ ➨➞➋➞➞ ➣➟➜➏➓➒
➔➜➎ ➏→➋➛➩
➹ ➒➝➶➒➝➑❐
➭➦➴➧➎ ➏ ➨➞➋➞➞ ➣➟➜➏➓➒
➔➜➎ ➏→➋➛➩
➹ ➍➜➞➞❐ ➒➒→➎ ➏ ➽➮ ➔➒➏
➦↔➦➬➛ ➜ ➝➔➒→➋➞➞ ➣➟➜➏➓➒
➔➜➎ ➏→➋➛➩
➹ → ➣➝➜➽➒
➭➭➫↕➼➛➋➞➞ ➣➟➜➏➓➒
➔➜➎ ➏→➻➚
➹ → ➝➽➺➼➞ ➵➍➸➎ ➏➽➷➻➞ ➒➓❒ ➣→✃ ➏➤➵➞ →➌➦➫➭➬↕➼➛➋➞➞ ➣➟➜➏➓➒
➔➜➎ ➏→➠➑➡➢
➧ ➒➤→➎➸ ➵➞ ➒
↕➦↔➧➎ ➏ ➨➞➋➞➞ ➣➟➜➏➓➒
➔➜➎ ➏→➠➑➡➢
➢➛ ➺❐
↕➦➦➩➎➞ ➒➋➞➞ ➣➟➜➏➓➒➩➎➞ ➒➋➛➩
➢➛ ➺➢
↕➦➦➩➎➞ ➒➋➞➞ ➣➟➜➏➓➒➩➎➞ ➒➋➛➩
❼ ⑦❮ ✉ "✉ ⑤❻➃ ""➄❹
⑩ ❰⑩①③�✇①
➢ ➜➞➞ ➤�➹➲ ➜➱ → ➤
➦➘
� ♣"❹❹➇❻ ""♣➈ ♣$⑤
⑩ ❰⑩✇②
➧ ➣➎➌
➴
� ⑥%❻ "❹$❸➈ ♣$⑤
⑩ ❰⑩✇②✇③❶ ➹➦ ��➑➮�❒➠�➳➮➮➑
➼➳➋❒ ↔ ➣➱ ↔