The Technological Landscape of GÉANT2. Roberto Sabatino, DANTE [email protected]. GÉANT2 focus. Make large amounts of capacity accessible( technically, economically) to users taking network services a step further: Ethernet (GE and 10GE), as service and as access technology - PowerPoint PPT PresentationTRANSCRIPT
Connect. Communicate. Collaborate
The Technological Landscape of GÉANT2
Roberto Sabatino, DANTE
Connect. Communicate. Collaborate
GRID@LARGE Workshop, Lisbon, 29-30 August 2005
GÉANT2 focus
• Make large amounts of capacity accessible( technically, economically) to users
• taking network services a step further:– Ethernet (GE and 10GE), as service and as access
technology– Performance (monitoring and enhancement)– Security– Mobility
Connect. Communicate. Collaborate
GRID@LARGE Workshop, Lisbon, 29-30 August 2005
The GÉANT2 networkConnect. Communicate. Collaborate
Connect. Communicate. Collaborate
GRID@LARGE Workshop, Lisbon, 29-30 August 2005
The importance of Ethernet
• GE and 10GE with guaranteed quality
• 10 GE as service specification and access to GE service
• Challenge to GÉANT2, NRENs and equipment vendors
Connect. Communicate. Collaborate
GRID@LARGE Workshop, Lisbon, 29-30 August 2005
The multidomain challenge for GE Connect. Communicate. Collaborate
GEANT2NREN-A NREN-B
GE
GE
10 GE
STM-64
STM-6410 GE
Connect. Communicate. Collaborate
GRID@LARGE Workshop, Lisbon, 29-30 August 2005
The multidomain challenge for 10 GE Connect. Communicate. Collaborate
GÉANT2NREN-A NREN-B
10 GE 10 GE
STM-6410 GE
NREN
Connect. Communicate. Collaborate
GRID@LARGE Workshop, Lisbon, 29-30 August 2005
GÉANT2 PoP example Connect. Communicate. Collaborate
Connect. Communicate. Collaborate
GRID@LARGE Workshop, Lisbon, 29-30 August 2005
Development programme
• Performance• Security• BW provision• Mobility
• Testbeds
Connect. Communicate. Collaborate
GRID@LARGE Workshop, Lisbon, 29-30 August 2005
Performance enhancement
• A dual development program:– Help end users make the most of the network, via the
PERT (Performance Enhancement Response Team)• Relies on multi-disciplinary experts• human-on-the job at all times (the case manager)• Knowledge-base and trouble tickets
– Provide detailed, end to end performance measurement data
• Measurement probes scattered throughout the network
• Multidomain operation
Connect. Communicate. Collaborate
GRID@LARGE Workshop, Lisbon, 29-30 August 2005
Performance measurement Connect. Communicate. Collaborate
Connect. Communicate. Collaborate
GRID@LARGE Workshop, Lisbon, 29-30 August 2005
Service provision
• Automate provision of service– For existing services (Premium IP)
• Available single domain, in progress for multidomain
– For new services (point to point 10/GE)• A key development activity for GÉANT2• Start with a static single domain approach• Target dynamic, multidomain approach• G-MPLS, UCLP,….
Connect. Communicate. Collaborate
GRID@LARGE Workshop, Lisbon, 29-30 August 2005
Security
• Strengthen security of network elements and services
• Tools for anomaly detection and network forensics
• Strengthen operational co-ordination and co-operation between GN2 partners for incident handling and resolution
Connect. Communicate. Collaborate
GRID@LARGE Workshop, Lisbon, 29-30 August 2005
Mobility
• AAA
• Roaming
• Single sign on
Connect. Communicate. Collaborate
GRID@LARGE Workshop, Lisbon, 29-30 August 2005
Conclusions to network
• The investment in dark fibre is the enabler for access to and management of large amounts of capacity
• The mixed (routed + switched) network architecture is the enabler for service provision
• The development programme is focussed on enhancing the traditional network services
Connect. Communicate. Collaborate
GRID@LARGE Workshop, Lisbon, 29-30 August 2005
GRID Projects
• LHC - EGEE• DEISA• Many more…
Connect. Communicate. Collaborate
GRID@LARGE Workshop, Lisbon, 29-30 August 2005
EGEE JRA4
• JRA4: Network Services Development activity within EGEE• Understand GRID application’s network requirements• Established a working relationship between GRID and
Networking communities• Feedback to Global Grid Forum (GGF) Network
Measurement Working Group (NMWG)• JRA4 has three sub-activities
– Bandwidth Allocation and Reservation (BAR)– Network Performance Monitoring (NPM)– IPv6 Uptake
Connect. Communicate. Collaborate
GRID@LARGE Workshop, Lisbon, 29-30 August 2005
Bandwidth Allocation and Reservation
• Analysis of state-of-the-art provisioning mechanisms• Specification of a generic interface for requesting (current
and future) network services• Define a multi-phased service provisioning model • Collaborate on an operational model for day-to-day
operations and troubleshooting• Prototype BAR and Network provisioning web service• Investigate last mile issues and practical service usability
Connect. Communicate. Collaborate
GRID@LARGE Workshop, Lisbon, 29-30 August 2005
Network Performance Monitoring
• Identify network metrics of interest to the Grid community for monitoring and troubleshooting purposes
• Implement GGF NMWG XML Schemas to retrieve network metrics • Collaborate in various prototypes developed by JRA4 NPM Group
– Focus on interfaces and technology - Provided One Way Delay Data through DANTE’s Perfmonit
– Focus on Security – upgrade DANTE Perfmonit tool to use certificates issued by EU Grid PMA
• EGEE plans to use GEANT2 JRA1’s prototype results for next phase– GEANT2 JRA1 plans to provide capacity and link utilization by