the team alex estey - mealex estey - me kenn austin - cskenn austin - cs matt clark - mematt clark -...
Post on 20-Jan-2016
219 views
TRANSCRIPT
The TeamThe Team
• Alex Estey - MEAlex Estey - ME• Kenn Austin - CSKenn Austin - CS• Matt Clark - MEMatt Clark - ME• Tristan Schneiter - CSTristan Schneiter - CS• Yago Alanso Garcia – EEYago Alanso Garcia – EE
• Jeff Frolik - AdvisorJeff Frolik - Advisor• Norm Baldwin – Assistant Director of BDPWNorm Baldwin – Assistant Director of BDPW
The CustomerThe Customer
• City of Burlington Department of Public City of Burlington Department of Public WorksWorks
• Responsible for 240 road lane milesResponsible for 240 road lane miles• Responsible for 120 miles of sidewalkResponsible for 120 miles of sidewalk• 3 baseline snow fighting plans3 baseline snow fighting plans
– 2 inches or less2 inches or less– 2-6 inches2-6 inches– 6+ inches6+ inches
• 7 trucks plowing six areas at any time7 trucks plowing six areas at any time
Goals of ProjectGoals of Project
• TrackTrack– Plow up, plow downPlow up, plow down– Road tempRoad temp– lbs salt / milelbs salt / mile– Truck speedTruck speed– Where trucks have Where trucks have
beenbeen
• User InterfaceUser Interface– Displays tracked dataDisplays tracked data– Two versionsTwo versions
• One for internal useOne for internal use• One for public useOne for public use
GPS User Interface SensorsEnclosures
Radio
Database User Interface
Vehicle
Base
Yago- GPS and Radio Matt- SensorsTristan-User Interface (vehicle and base) Alex- Enclosures DatabaseKenn- User interface (vehicle and Base)
Assignments
The System
Contacts and UpdatesContacts and Updates
Email: [email protected]: [email protected]
http://www.cems.uvm.edu/~tschneit/bdpw