THE SMART HOB SYSTEM

IN ACTION

®

CASE STUDY

288 Albert

L O C A T I O N

L E V E L S

284-294 Albert Street, Brunswick

14 levels

Over 1000 L/M of Smart Hobs were used on this 14 level project, replacing the conventional on site construction of timber hob formwork.

Returning to strip timber form ply and patch damaged hobs once concrete has set requires considerable time, effort and labour. Once installed, Smart Hobs form a permanent system, removing those steps entirely from the hob formwork construction process. Using the Smart Hob system, each level can be completed and handed over faster.

®

© 2018 SBS Group

CASE STUDY

Black Fold Apartments

When the project manager says they will use Smart Hobs on all their jobs because they are ‘so easy and strong’, it’s clear that the system is proving itself to be the preferred method for hob formwork construction.

The Smart Hob team worked closely with the developers, initially supplying 150 lengths to the specified size. Manufactured and then delivered to site, the hobs were installed and fixed into place by the wall and ceiling contractors. The hobs were then filled with concrete by the on site concreting team.

Installed as a permanent system, there is no need to wait for the concrete to set before stripping temporary ply and removing nails. Once the Smart Hobs are waterproofed, the construction teams are then able to immediately move to the next section or level.

®

L O C A T I O N

L E V E L S

27-29 Bank Street, West End, Brisbane

6 levels

© 2018 SBS Group

CASE STUDY

Echo Apartments

With many levels of hob formwork to complete on this apartment project, the formwork contractor wasn’t spending unnecessary time on site by traditionally forming up their hob framing.

In the customer’s own words, ‘It’s a really simple system that saves heaps of time.’

By using just two workers to pin the pre-formed hobs to the concrete and fix the reo bars, it not only made the process easier on site, it was much faster, smarter and more economical. Additional time was saved by filling the hobs with structural grout instead of coming back to top-up.

‘We always use the Smart Hob - they are so much faster.’ Jerry - Eltrax

®

L O C A T I O N

L E V E L S

33 Simmons Street, South Yarra

8 levels

© 2018 SBS Group

CASE STUDY

Sophia Apartments

In the customer’s words:

‘When we are asked to supply hobs to any of our concrete construction projects, we only use SBS pre-fabricated products. The quality and huge range in sizes means that we can be confident in providing a finished product for the builder that is second to none. When quality and service is spot on….why go anywhere else?’

‘..as a rule we are probably doing it in half the time that it would take to do it with conventional formwork...they don’t damage the slab on the outside of the hob because they are held down internally. Conventional formwork always leaves nail holes in the slab when its stripped. We can do Smart Hobs in half the time with half the man power.…It’s a good product and we love it.’ Darren D. - Kosta Concreting

®

L O C A T I O N

L E V E L S

544 High Street, Northcote

5 levels

© 2018 SBS Group

CASE STUDY

Spring Malvern

Using the Smart Hob system, the hob formwork process is twice as fast.

Permanent steel hobs were fabricated and delivered direct to site for this 4 level project. Once in place and filled with concrete, there was no need to return to strip timber ply, remove nails and patch the hobs. Straight and true hobs also result in the advantage of no warping or bending when hobs are set.

To achieve faster installation and 100% accurate results, the Smart Hob system is the reliable and simple alternative to conventional hob formwork - a tried and tested product with over a decade of installations and satisfied clients.

®

L O C A T I O N

L E V E L S

1220-1224 Malvern Road, Malvern

4 levels

© 2018 SBS Group

CASE STUDY

Starward Distillery

The Smart Hob system is not usually an exposed product. Yet for this distillery project, it was the ideal solution to create a raised water barrier system, separating the processing areas from the public spaces.

Replacing the traditional method of forming up a concrete step, the permanent metal hob resulted in a neat and clean finish, adding to the industrial style.

In the client’s words:‘Installation is fast and simple. With a little extra attention to detail, it’s easy to create a product that not only serves its purpose, but also looks great.’ Scott R. - Empire Concrete & Formwork

®

L O C A T I O N 50 Bertie Street, Port Melbourne

© 2018 SBS Group

CASE STUDY

The Caulfield

In the client’s words:

‘Prior to commencing structure works at 2-4 Station Street, Caulfield our client was faced with a common problem in today’s construction industry. A very tight construction program. Fortunately SBS Group was there to help us cater to our clients needs, they recommended we use SBS Smart Hob.

The result was far beyond our expectations, it enabled our company to hand over floors much sooner, shaving 8 days of a very tight construction program. It also enabled us to reduce our costs by 50% purely by allocating less labour to the tasks and quicker installation times. We were amazed at how quick and easy the product is to install. All our sites are now running faster than ever thanks to this fantastic product.’ Kris - MPA Construction

®

L O C A T I O N

L E V E L S

2-4 Station Street, Caulfield

4 levels

© 2018 SBS Group

Ready to build smarter and faster with the Smart Hob System?

Call 1300 782 950 to order Smart Hobs for your

next project.

Get our free information pack to find out how you can halve your work time and cut costs by 50%.

DOWNLOAD INFO PACK

® The Smart Hob System is a registered design. Designed and supplied by SBS Group.

1300 782 950 | smarthob.com.au | [email protected]