34
The information in this presentation has been collated by ELEXON and while all due care has been taken to ensure the accuracy of this information, ELEXON accepts no responsibility for errors. The Settlement Process Distribution Losses ‘A Settlements Eye View’ John Lindup The information in this presentation has been collated by ELEXON and while all due care has been taken to ensure the accuracy of this information, ELEXON accepts no responsibility for errors.

Upload: others

Post on 08-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

The information in this presentation has been collated by ELEXON and while all due care has been taken to ensure the accuracy of this information, ELEXON accepts no responsibility for errors.

The Settlement Process

Distribution Losses

‘A Settlements Eye View’

John Lindup

The information in this presentation has been collated by ELEXON and while all due care has been taken to ensure the accuracy of this information, ELEXON accepts no responsibility for errors.

Page 2: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

Presentation Objectives

• Distribution Losses Perspective from Settlements

• Root Causes

• ELEXON initiatives

Page 3: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

Settlements

GSP Group

NHH

HH Export

HH Import

Page 4: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

Distributions Losses

Import ExportHH Energy

HH Energy Loss Estimates

Total Uncorrected Energy

HH Energy

NHH Energy

NHH Line Loss Estimates

HH Line Loss Estimates

Page 5: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

Uncorrected Energy Vs GSP Group Take

GSP Group Take(Net) NHH Energy + Losses

Net HH Energy + Lossesi.e. (import - export)

Group Correction Factors

Page 6: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

GSP Group Correction Factors

Σ

( )ΣΣΣ

Where Σ is the sum of energy within a half hour, this equation produces the GSP Group Correction Factor for that half hour settlement period.

Page 7: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

Long-term average correction

ossesGSP Group Take

ses - export)

• Settlement Error within a half hour is expected (Profiles are estimated values and

so are expected to exhibit small

deviations from actual data)

• When group correction factors are averaged over a year this ‘shape’ error should cancel out.

Net NHH Energy + L

Net HH Energy + Losi.e. (import

Group Correction Factors

Page 8: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

Annual Demand Ratio (ADR)

Σ

( )ΣΣΣ

Where Σ is the sum of energy within a year, this equation produces the GSP Annual Demand Ratio (ADR), which is used to measure market performance.

Page 9: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

Average CF v ADR

• time-weighted average CF over a year measures ‘shape’ and ‘volume’ error

• ADR measures ‘volume’ error only

Page 10: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

ADR values

0.92

0.94

0.96

0.98

1

1.02

1.04

07/0

2/01

07/0

3/01

07/0

4/01

07/0

5/01

07/0

6/01

07/0

7/01

07/0

8/01

07/0

9/01

07/1

0/01

07/1

1/01

07/1

2/01

07/0

1/02

07/0

2/02

07/0

3/02

07/0

4/02

07/0

5/02

07/0

6/02

07/0

7/02

07/0

8/02

07/0

9/02

07/1

0/02

07/1

1/02

07/1

2/02

07/0

1/03

07/0

2/03

Eastern East Midlands LondonMerseyside & N Wales Midlands NorthernNorth Western Southern South EasternSouth Wales South Western Yorkshire

Page 11: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

Net Magnitude of Settlement Error

08/02/99 07/02/00 NHH Review 221 6,764 6,98508/02/99 07/02/00 Final Rec 276 3,559 3,83511/01/01 10/01/02 latest RF 222 1,610 1,83217/03/02 16/03/03 latest data 509 1,710 2,219

From To as at above unity below unity total error

error in GWh

Page 12: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

Potential Causes of ADR deviation from 1.0?

1.0

ADRToo Much

GSP Group Take

Too LittleGSP

Group Take

Too Much HH

Import

Too Little HH

Export

Too Much HH

Export

Too Little NHH

Too Little HH

Import

Too MuchNHH

Page 13: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

GSP Metering

• High Volumes / Low Numbers

• Strict Controls and Monitoring

• Long Established Systems

• CDCS / CDCA teething troubles

• CDCA Improvement

Page 14: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

GSP Metered Volumes

• PDSOs registrants of GSP metering

• Monitoring of Transmission Losses

• CVA registered embedded generation

• PDSOs review Aggregation Rules and submit LLFs for embedded generation

Page 15: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

HH Import

• D00235 Exception

– Half Hourly Aggregation Exception Report

– ELEXON monitor missing half hourly data

• RF 27/03/2001 275

• RF 18/02/2002 61

• Over 1 year, this equates to 0-321 GWh improvement

• Access Issues: e.g. MOD, railways

Page 16: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

NHH

• EAC / AA

• D0095 aggregation exception report

• Reading Frequency

• Unmetered Supplies

Page 17: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

NHH: EAC / AAs

• EAC / AA

– Large EACs and AAs send ADR below 1.0.

– Negative EACs send ADR above 1.0

• ELEXON: large EAC / AA monitoring

• Poor Performance = Escalation to

the Performance Assurance Board

(PAB)

Page 18: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

NHH: EAC / AAs Statistics

• Erroneously Large EACs and AAs

– Gross uncorrected energy error (Magnitude of issue) crystallised at RF or DF

– Audit Year 2000/2001 625 GWh

– Audit Year 2002/2003 354 GWh

– Effect on ADR

Page 19: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

NHH: D0095s

• The D0095 Aggregation Exception Report is Produced by the Non Half Hourly Data Aggregator (NHHDA)

• Reports on inconsistencies between SMRS and DC and missing consumption Data

Page 20: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

Reading Frequency

• Less Frequent Reads leads to seasonal profile

error

• Only creates volume error if meters are not

read by RF

• The Target for NHH is 97% of NHH energy on

Annualised Advances (AAs)

• PAB escalation Process

• Vacant but energised premises will be settled

on EACs until access is gained

Page 21: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

Unmetered Supplies

• Load Research on Street Lights (Currently in Progress)

• EACs and inventories are then responsibility of the UMSO (Distribution)

• This represents 1% of the total energy in the market.

Page 22: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

Unmetered Supplies Continued… (Market Share)

HH ImportNHH meteredHH ExportUnmetered

Page 23: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

Unmetered Supplies

• Suppliers have the option to choose equivalent metering (e.g. LAMP and FLARE) and trade Half Hourly

• This increases accuracy

Page 24: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

HH Export

• Cannot be estimated without a

Meter Advance Reconciliation

(MAR)

• Suppliers incentivised to account

for all export volumes

• Represents a small slice of the pieHH ImportNHH meteredHH ExportUnmetered

Page 25: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

General Issues

• Registration, connections / disconnections not registered in SMRS

• Energisation Status

• Line Loss Factor Estimate Accuracy

• Illegal Abstraction

• Metering

Page 26: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

Registration, Connection and Disconnection

• Unregistered metering

systems

• Untraded MPANs in SMRS

• ELEXON has no visibility of

magnitude of error

• Retrospective correction of

(dis)connection in SMRS

(review of MAP04)

Page 27: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

Energisation Status

• Issue raised by PDSOs that DUoS revenue was

being lost due to inaccurate data on energisation

at SMRS

• ELEXON project concluded that areas of non-

compliance that are impacting Settlements data

• SVG have approved a programme of quarterly

monitoring, guidance to Suppliers, and

improvements to the current process.

• Monitored by the PAB

Page 28: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

Line Loss Factor Estimate Accuracy

• Seasonal Errors are inevitable.

• Shape Errors resulting from the

application of LLFs to profile data

(which itself contains shape errors)

• Established Distribution Business

Processes for deriving Line Loss Factors

(with long series of sales/purchase

ratios) should mitigate risk of volume

errors.

Page 29: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

Illegal Abstraction

• ELEXON has no visibility of this

issue

• The responsibility for this falls

under Revenue Protection

• Settlement supports Revenue

Protection adjustments

• Low Volume?

Page 30: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

Metering

• Codes of Practice

• Technical Assurance

• Certification of Meters

• Proving Tests

Page 31: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

and finally…Settlement Vs DUoS Measurement

Distributor

NHHDC

NHHDA

HHDC

HHDA

SVAA

HHDA

Page 32: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

and finally…Settlement Vs DUoS Measurement

• NOT a cause of Error

• Two different views

• This can decrease visibility

• SVG agreed regular comparisons of DUoS and Settlement in

order to improve settlement data quality

• PDSO involvement in progressing Change Proposal

• Post Final Disputes agreed outside settlement

Page 33: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

Presentation Objectives

• Distribution Losses Perspective from Settlements

• Root Causes

• What are we doing about Losses?

Page 34: The Settlement Process - Ofgem€¦ · The Settlement Process Distribution Losses ‘A Settlements Eye View ... improvements to the current process

Lunch

GSP Group

NHH

HH Export

HH Import