The Seattle Department of Transportation SEATTLE BICYCLE MASTER PLAN Implementation Plan 2015 - 2019

Upload: others

Post on 05-Oct-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

SEATTLE BICYCLE MASTER PLAN IMPLEMENTATION PLAN 2015 - 2019 | 1

The Seattle Department of Transportation

SEATTLE BICYCLE MASTER PLANImplementation Plan 2015 - 2019

Page 2: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

Seattle Municipal Tower 700 5th Avenue Tel (206) 684-ROAD / (206) 684-5000 Suite 3800 Fax: (206) 684-5180 PO Box 34996 Hearing Impaired use the Washington Relay Service (7-1-1) Seattle, Washington 98124-4996 www.seattle.gov/transportation

City of Seattle Edward B. Murray, Mayor

Department of Transportation Scott Kubly, Director

March 27, 2015 Honorable Tom Rasmussen Transportation Committee Chair Seattle City Council City Hall, 2nd Floor Dear Councilmember Rasmussen: I am pleased to transmit the March 2015 update of the Bicycle Master Plan Implementation Plan. This implementation plan describes an ambitious set of projects and programs that will make significant progress towards the Bicycle Master Plan (BMP)’s vision to make riding a bicycle is a comfortable and integral part of daily life in Seattle for people of all ages and abilities. The actions and investments in the plan will advance this vision through new bicycle infrastructure, bicycle parking and other end-of-trip facilities, and programs to enhance safety, maintain facilities, and encourage more people to ride bicycles. This is an update of the October 2014 Implementation plan and, as such, makes relatively minor changes to that plan. Changes include adding several new projects, an updated funding table, and more readable maps. In a separate transmittal, we will share the 2014 Bicycle Master Plan progress report, which describes the projects and programmatic work undertaken in 2014. The BMP calls for a citywide network of trails, protected bicycle lanes, and neighborhood greenways. When fully implemented over five years, this plan will build more than 35 miles of protected bicycle lanes and more than 50 miles of neighborhood greenways throughout the city. While this implementation plan is specific to the Bicycle Master Plan, it reflects and supports Seattle’s Vision Zero commitment to eliminate fatal and serious collisions by 2030. Thank you for your support for bicycling in Seattle. I look forward to celebrating the opening of new facilities with you in the near future. Sincerely, Scott Kubly Director, Seattle Department of Transportation

Page 3: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

Seattle Municipal Tower 700 5th Avenue Tel (206) 684-ROAD / (206) 684-5000 Suite 3800 Fax: (206) 684-5180 PO Box 34996 Hearing Impaired use the Washington Relay Service (7-1-1) Seattle, Washington 98124-4996 www.seattle.gov/transportation

City of Seattle Edward B. Murray, Mayor

Department of Transportation Scott Kubly, Director

March 27, 2015 Honorable Tom Rasmussen Transportation Committee Chair Seattle City Council City Hall, 2nd Floor Dear Councilmember Rasmussen: I am pleased to transmit the March 2015 update of the Bicycle Master Plan Implementation Plan. This implementation plan describes an ambitious set of projects and programs that will make significant progress towards the Bicycle Master Plan (BMP)’s vision to make riding a bicycle is a comfortable and integral part of daily life in Seattle for people of all ages and abilities. The actions and investments in the plan will advance this vision through new bicycle infrastructure, bicycle parking and other end-of-trip facilities, and programs to enhance safety, maintain facilities, and encourage more people to ride bicycles. This is an update of the October 2014 Implementation plan and, as such, makes relatively minor changes to that plan. Changes include adding several new projects, an updated funding table, and more readable maps. In a separate transmittal, we will share the 2014 Bicycle Master Plan progress report, which describes the projects and programmatic work undertaken in 2014. The BMP calls for a citywide network of trails, protected bicycle lanes, and neighborhood greenways. When fully implemented over five years, this plan will build more than 35 miles of protected bicycle lanes and more than 50 miles of neighborhood greenways throughout the city. While this implementation plan is specific to the Bicycle Master Plan, it reflects and supports Seattle’s Vision Zero commitment to eliminate fatal and serious collisions by 2030. Thank you for your support for bicycling in Seattle. I look forward to celebrating the opening of new facilities with you in the near future. Sincerely, Scott Kubly Director, Seattle Department of Transportation

CONTENTS

4 Introduction

5 Purpose

6 Updates and Reporting

7 Prioritization

8 Project Delivery, Program Delivery and Public Engagement

9 Funding Assumptions

10 Staffing

11 Guide to Appendices

12 Appendix 1: Costs and Funding Summary

14 Appendix 2: Project and Program Delivery Summary

15 Appendix 3: Implementation Maps

21 Appendix 4: Project Lists

26 Appendix 5: Strategies and Programs

32 Appendix 6: Project Changes in this Update

Page 4: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

4 | SEATTLE DEPARTMENT OF TRANSPORTATION

INTRODUCTION

existing facilities, bicycle parking, and programs to encourage more people to ride.

When fully funded and combined with existing facilities, the projects and programs identified in this implementation plan will result in approximately one-third of the protected bicycle lanes and one-quarter of the neighborhood greenways in the plan being complete, and will make significant progress towards implementing other aspects of the BMP.

Seattle’s Bicycle Master Plan (BMP) identifies projects and programs to be implemented over the next 20 years, to meet the vision of making riding a bike a comfortable and integral part of daily life in Seattle for people of all ages and abilities.

As part of this, the BMP calls for a connected network that includes approximately 100 miles of protected bicycle lanes and nearly 250 miles of neighborhood greenways. The BMP also identifies programs such as maintenance of

Page 5: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

SEATTLE BICYCLE MASTER PLAN IMPLEMENTATION PLAN 2015 - 2019 | 5

PURPOSE

This implementation plan describes the work that the Seattle Department of Transportation (SDOT) and its partners will undertake to implement the Bicycle Master Plan (BMP) over the next five years. The implementation plan will be updated every year and is intended to:

Serve as an accountability and reporting tool

Provide predictability for stakeholders by including a multi-year project list

Guide future budget requests

Page 6: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

6 | SEATTLE DEPARTMENT OF TRANSPORTATION

UPDATES AND REPORTING

other opportunities, such as the opportunity to coordinate with a paving, utility or private development project that was not anticipated at the time the Implementation Plan was updated. Such projects would follow the project development and outreach process outlined in the BMP.

Also consistent with Council Resolution 31515, as part of the annual implementation plan update, SDOT will prepare and submit to the City Council a progress report, reviewed and endorsed by the Seattle Bicycle Advisory Board (SBAB), covering the prior year’s achievements. SDOT will also provide updates to the City Council and SBAB every six months on the status of projects, programs, and actions in the implementation plan.

Consistent with Council Resolution 31515, SDOT will update the implementation annually, by March 31 of each year. As part of the update, we will make adjustments to the project lists and maps to reflect changes in project schedules, project types, and to add or remove projects. For example, as noted in the BMP’s project delivery discussion, after evaluating a protected bicycle lane recommended in the BMP for a particular street, SDOT may determine that a different facility type, such as a buffered bicycle lane or a parallel neighborhood greenway, would be preferable.

This Implementation Plan is intended to reflect new projects planned for the next five years. Projects that are not in the Implementation Plan may be built to take advantage of leveraging or

Page 7: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

SEATTLE BICYCLE MASTER PLAN IMPLEMENTATION PLAN 2015 - 2019 | 7

PRIORITIZATION

We developed the project lists included in this plan using the prioritization criteria and methodology defined in the BMP. The BMP process includes quantitative scoring based on the plan’s five themes (with corresponding weighting factors):

Safety – 40 points Connectivity – 25 points Equity – 20 points Ridership – 10 points Livability – 5 points

Based on these scoring criteria, the prioritization process assigns a point value to each project segment. Projects are then grouped into priority tiers: Tier 1 is made up of the highest scoring twenty percent, Tier 2 is the next twenty percent, and so on. The priority tier for each project is shown on the project lists.

The BMP also provides criteria for qualitative evaluation, including:

Potential to leverage other projects Policy directives Community interest Geographic balance

In addition to the quantitative and qualitative criteria, the BMP also identifies as near-term priorities:

High-demand segments of the citywide network, specifically in, and connecting to, the Center City area

Neighborhood greenways in all neighborhoods

Other priorities reflected in this implementation plan are:

Coordinating with other modal plans and resurfacing projects

Building network connectivity Implementing programs

All of these factors were considered in developing the project lists for this implementation plan. The project lists are organized by facility type, including protected bicycle lanes, neighborhood greenways, other on-street projects, off-street (trails) and catalyst projects. The project lists will evolve as we accelerate or decelerate projects based on changing conditions or opportunities. Project types may change within a corridor – for example, due to grades or other constraints, a corridor might have a protected bicycle lane on one side of the street and a buffered bicycle lane on the other.

Page 8: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

8 | SEATTLE DEPARTMENT OF TRANSPORTATION

PROJECT DELIVERY, PROGRAM DELIVERY AND PUBLIC ENGAGEMENT

Following the second public meeting, SDOT designs and builds the project. During the design phase, some additional smaller meetings may be held to address location-specific issues. Prior to construction, SDOT notifies adjacent properties of potential construction impacts.

This process has worked well for neighborhood greenways. We will be adapting it for protected bicycle lanes and other projects. Projects that are particularly complex may require additional work with stakeholders, but the goal is to be able to take full advantage of the useful insights and perspectives that result from good public engagement, while also meeting our ambitious implementation goals.

The Second Avenue Protected Bicycle Lane Demonstration Project is an example of a project that was identified in the BMP and quickly implemented with paint, delineator posts, and signal changes. By working collaboratively with stakeholders along the corridor, SDOT was able to address issues related to loading, valet services, and transit operations during design. Once the project was implemented, SDOT monitored the corridor and made rapid adjustments to address safety and operational issues.

The strategies and programs in Appendix 5, including bicycle parking, education and encouragement programs, maintenance, and others, will include public engagement as appropriate.

The project delivery process will follow the steps outlined in the BMP, which include evaluating alternatives, conducting a Complete Streets review, applying the Race and Social Justice Initiative equity toolkit, and engaging the public. The BMP established where bicycle facilities are needed and what type of facility is appropriate. Public outreach and engagement going forward will focus on soliciting community input to ensure that projects balance community interests.

SDOT has developed an effective public engagement process for neighborhood greenways and will adapt this process for other types of projects to be implemented as part of this plan.

The greenways process is built around two public meetings. Meeting invitations are mailed to residents and businesses in the project area and sent to local media outlets and community groups. At the first meeting, SDOT:

Describes Seattle’s safety goals Defines the features of a typical greenway Shares traffic data about local streets Identifies general greenway route

possibilities Gathers input from community members

At the second meeting, SDOT: Reviews project goals and objectives Shares the most promising route and the

proposed safety improvements Gathers community input Describes next steps

Page 9: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

SEATTLE BICYCLE MASTER PLAN IMPLEMENTATION PLAN 2015 - 2019 | 9

FUNDING ASSUMPTIONS

a replacement funding source; the funding assumptions and work plan will be adjusted in future updates to reflect new information.

This plan assumes a mix of implementation strategies – for example, some protected bicycle lane projects will be implemented with paint and delineator posts and some will involve more permanent infrastructure. These decisions will be based primarily on funding availability and leveraging opportunities.

The work planned for 2015 is fully funded based on the amount in the adopted budget, combined with projected funds to be carried forward from 2014, and anticipated grants. For 2016 and beyond, the difference between estimated costs and total funding is shown in Appendix 1. Bicycle Master Plan implementation has historically been funded largely by the Bridging the Gap (BTG) levy, which expires at the end of 2015. Actual funding levels for future years will vary depending on the passage and priorities associated with

Page 10: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

10 | SEATTLE DEPARTMENT OF TRANSPORTATION

STAFFING

The Bicycle Master Plan calls for SDOT to evaluate the need for a bicycle coordinator position (Action 7.2.1). SDOT is addressing this by hiring Nicole Freedman to lead the Active Transportation Program, including launching the new Summer Parkways Program and working on expanding the bikeshare system.

Nicole most recently served as the Director of Bicycle Programs for the City of Boston. The program is part of Mayor Walsh’s vision for healthy, sustainable communities and neighborhoods. During her tenure, she has helped transform Boston from the worst cycling

city in the country to a recognized leader in cycling. Under her leadership, the city created 92 miles of bike lanes and implemented a successful bikeshare system. Nicole attended MIT before graduating with a degree in Urban Planning from Stanford University. Prior to working for Boston, Nicole competed professionally in bike racing from 1994-2005, winning two national championships and competing for the United States in the 2000 Olympics in Sydney. Nicole’s first day will be April 22, 2015.

No staffing changes beyond hiring the Active Transportation Program Manager are planned.

Page 11: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

SEATTLE BICYCLE MASTER PLAN IMPLEMENTATION PLAN 2015 - 2019 | 11

GUIDE TO APPENDICES

Appendix 1: Costs and Funding SummaryThis appendix includes a summary of planned spending and available funding. The “total cost estimate” line includes new bicycle facilities, as well as other projects and programs identified in this implementation plan such as bicycle parking, bicycle facility maintenance, spot improvements, and other work to advance the strategies in Appendix 5. Some projects that start in 2015 will carry forward into 2016.

Appendix 2: Project and Program Delivery Summary This appendix summarizes the project and program deliveries by year.

Appendix 3: Implementation MapsThese maps show the projects planned for implementation in 2015 through 2019.

Appendix 4: Project Lists The project lists are sorted by project type and include each project’s location, length, priority tier, and planned implementation year.

As noted above, adjustments will be made to the projects lists and maps as part of the annual update process to reflect changes in project schedules, project types, and to add or remove projects. Project schedules can be affected by coordination with other projects, environmental review, and myriad other factors. Project types may change based on the initial evaluation and outreach for a particular corridor, and some projects may begin one year and continue into the next.

Appendix 5: Strategies and ProgramsThis appendix shows the programmatic actions SDOT will undertake starting in 2015 and continuing into future years, and the status of each.

Appendix 6: Project Changes in this UpdateThis appendix shows the changes made to the project lists and maps, relative to the October 2014 Implementation Plan.

Page 12: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

12 | SEATTLE DEPARTMENT OF TRANSPORTATION

APPENDIX 1: COSTS AND FUNDING SUMMARY

Note regarding 2016-2019 BMP Implementation Funding: Historically funded largely by the BTG Levy, the future funding for this CIP project is unknown due to Levy expiration at the end of 2015, and therefore is not included in this table.

COST ESTIMATE2015 2016 2017 2018 2019 5 YEAR

TOTALTotal Cost Estimate (1) $19.5 $12.8 $17.6 $13.8 $14.8 $78.5

Page 13: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

SEATTLE BICYCLE MASTER PLAN IMPLEMENTATION PLAN 2015 - 2019 | 13

FUNDING PLAN2015 2016 2017 2018 2019 5 YEAR

TOTALFunding from TC366760 BMP ImplementationBMP Proposed CIP Budget $6.5 $1.3 $1.2 $1.2 $1.2 $11.42014 Carry Forward into 2015 $6.5 $0.0 $0.0 $0.0 $0.0 $6.5Anticipated Grant Utilization $0.2 $3.1 $2.7 $0.0 $0.0 $6.0Total $13.2 $4.4 $3.9 $1.2 $1.2 $23.9Funding from Other CIP Projects - BMP Impacting Dollars (2)TC367070 - Cheshiahud Lake Union Trail (3)

$0.5 $2.0 $0.0 $0.0 $0.0 $2.5

TC367250 - Neighborhood Large Projects

$0.6 $0.0 $0.0 $0.0 $0.0 $0.6

TC367240 - Broadway Streetcar Extension (4)

$0.0 $0.0 $0.0 $0.0 $0.0 $0.0

TC367670 - PMP School Safety $0.0 $0.4 $0.0 $0.0 $0.0 $0.4TC367330 - Waterfront Improvement Project (5)

$0.0 $0.0 $0.0 $0.0 $0.0 $0.0

TC367420 - 23rd Ave Corridor Improvements

$4.2 $0.0 $0.0 $0.0 $0.0 $4.2

TC367350 - Sound Transit N Link Bike & Ped

$0.0 $0.0 $0.0 $0.0 $1.9 $1.9

Total $5.3 $2.4 $0.0 $0.0 $1.9 $9.6Funding from Other O&M Projects - BMP Impacting Dollars (2)Bike Share $0.6 $0.6Anticipated Low Income Bike Share Grant

$0.4 $0.4

Total $1.0 $0.0 $0.0 $0.0 $0.0 $1.0Total Funding $19.5 $6.8 $3.9 $1.2 $3.1 $34.5Annual Estimated Funding/Cost Variance(6)

$0.0 ($6.0) ($13.7) ($12.6) ($11.8) ($44.1)

Cumulative Funding/Cost Variance $0.0 ($6.0) ($19.7) ($32.3) ($44.1) ($44.1)

(1) Total Cost Estimate includes infrastucture and programs.(2) Dollars stated represent only the bike facility portion of each Capital Improvement Project listed.(3) Westlake Cycle Track Project - miles (1.24) are included in 2015; the project is underfunded by $2.3M per current cost estimates.(4) Broadway Streetcar Bike Facilities - miles (0.57) are included in plan, costs and funding to be added when known(5) Waterfront Improvement Project - miles (0.84) are included in plan, costs and funding to be added when known(6) Cost variance in 2016 has increased since last update; driven by correcting a 2016 budget overstatement ($1M), reflecting current cost estimates for Westlake Cycle Track, adding an additional 0.4 PBL miles, and revising the drawdown on grant funds to match construction timing.

Page 14: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

14 | SEATTLE DEPARTMENT OF TRANSPORTATION

APPENDIX 2: PROJECT AND PROGRAM SUMMARY

PROJECTS AND PROGRAMS 2015 2016 2017 2018 20195-YEAR TOTAL

Protected Bicycle Lanes 7.5 9.4 6.1 5.8 7.8 36Neighborhood Greenways 12.6 4.1 15.6 10.9 9.5 52Education (schools reached) 12 14 16 18 20 80Bike racks 225 200 175 150 125 875Bike corrals 15 20 25 30 35 125Wayfinding (miles) 25 25 25 25 25 25Spot improvements 10 10 10 10 10 50

Page 15: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

SEATTLE BICYCLE MASTER PLAN IMPLEMENTATION PLAN 2015 - 2019 | 15

APPENDIX 3: IMPLEMENTATION MAPS

Page 16: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

PHIN

NEY

17TH

AVE

NW

NE CAMPUSPKWY

SW ADMIRAL

RAINIER AVE S

COLL

EGE

WAY

N

21ST

AVE

SW

8TH AVE S

PORT

SIDE

TR

AIL

E GALER ST

26TH

AVE

S

WAY

WESTLAKE

BICYCLE MASTER PLANIMPLEMENTATION 2015

2015 ProjectsNeighborhood GreenwayProtected Bike LaneIn Street Minor SeparationMulti Use Trail

Existing Bike FacilitiesNeighborhood GreenwayProtected Bike LaneIn Street Minor SeparationMulti Use Trail

DELR

IDGE

WAY

SW

S PORTLAND ST

S MYRTLE ST

BEACON AVE S

AVE

N

N 43RD ST

N 34TH ST

DEXT

ER A

VE

AVE N

22N

DAV

E

UNIV

ERSI

TY B

R

S DEARBORN ST

NE RAVENNA

BLVD

ROOS

EVEL

T W

AY N

E

Page 17: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

BICYCLE MASTER PLANIMPLEMENTATION 2016

2016 ProjectsNeighborhood GreenwayProtected Bike LaneIn Street Minor SeparationMulti Use Trail

Existing Bike FacilitiesNeighborhood GreenwayProtected Bike LaneIn Street Minor SeparationMulti Use Trail

N 130TH ST

E PIKE ST

BROA

DWAY

E

6TH

AVE

S

SWIFTAVE S

43RD

AVE

S

RENTON AVE S

17TH

AVE

NW

W EMERSON PL

S ROYALBROUGHAM

WAY

20TH

AVE

W

PINEH

URST W

AY N

E

BANNERWAY NE

MER

IDIA

N A

VE N

7TH AVE2ND AVE

5TH AVE

E UNION ST

2ND

AVE ET S

GILMANAVE W

NOTE: These corridors will be studied in 2015 before final route selection

N 92ND ST

Page 18: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

Bicycle Master PlanImplementation

2016

0 0.5 1 1.5 2Miles

N

EW

S

S ORCAS ST

RENTON AVE S

SWIFT

AVE S

PINEH

URST W

AY N

E

UNIV

ERSI

TY B

R

ROO

SEVE

LTW

AY N

E

6TH

AVE

S

42N

DAV

E S

N 130TH ST

MER

IDIA

N A

VE N

BANNER

WAY NE

SEATTLEBLVD S

WESTLA

KEAVE N

20TH

AVE

WGILM

AN

AVE W

BICYCLE MASTER PLANIMPLEMENTATION 2017

2017 ProjectsNeighborhood GreenwayProtected Bike LaneIn Street Minor SeparationMulti Use Trail

Existing Bike FacilitiesNeighborhood GreenwayProtected Bike LaneIn Street Minor SeparationMulti Use Trail

ROY ST

34TH

AVE

SW

8TH

AVE

S

SR 520 TRAIL

N 100TH ST

NW 83RD ST

B-G TRAILMISSING LINK

E UNION STE COLUMBIA ST

MLK

JR

WAY

SS KING ST

S SNOQUALMIE ST

DEXT

ER A

VE VALLEY ST

NE 40TH ST

4TH AVE 5TH AVE

SPRUCE ST

NOTE: These corridors will be studied in 2015 before final route selection

Precise alignment subject to outcome of EIS

Page 19: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

Bicycle Master PlanImplementation

2016

0 0.5 1 1.5 2Miles

N

EW

S

S ORCAS ST

RENTON AVE S

SWIFT

AVE S

PINEH

URST W

AY N

E

UNIV

ERSI

TY B

R

ROO

SEVE

LTW

AY N

E

6TH

AVE

S

42N

DAV

E S

N 130TH ST

MER

IDIA

N A

VE N

BANNER

WAY NE

SEATTLEBLVD S

WESTLA

KEAVE N

20TH

AVE

WGILM

AN

AVE W

BICYCLE MASTER PLANIMPLEMENTATION 2018

2018 ProjectsNeighborhood GreenwayProtected Bike LaneIn Street Minor SeparationMulti Use Trail

Existing Bike FacilitiesNeighborhood GreenwayProtected Bike LaneIn Street Minor SeparationMulti Use Trail

RAVENNA PL NE

S ROYALBROUGHAM

WAY

S MORGAN ST

S HILL ST

AIRP

ORT

WAY

S

S FERDINAND ST

N 34TH ST

1ST

AVE

NE

16TH

AVE

E

EAST

LAKE

AVE

N6T

H A

VE S

SEATTLE BLVD

12TH

AVE

S

ALASKAN WAY

9TH

AVE

N

MARION STNOTE: These corridors will be studied in 2015 before final route selection

Precise alignment subject to outcome of EIS

Page 20: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

Bicycle Master PlanImplementation

2016

0 0.5 1 1.5 2Miles

N

EW

S

S ORCAS ST

RENTON AVE S

SWIFT

AVE S

PINEH

URST W

AY N

E

UNIV

ERSI

TY B

R

ROO

SEVE

LTW

AY N

E

6TH

AVE

S

42N

DAV

E S

N 130TH ST

MER

IDIA

N A

VE N

BANNER

WAY NE

SEATTLEBLVD S

WESTLA

KEAVE N

20TH

AVE

WGILM

AN

AVE W

BICYCLE MASTER PLANIMPLEMENTATION 2019

2019 ProjectsNeighborhood GreenwayProtected Bike LaneIn Street Minor SeparationMulti Use Trail

Existing Bike FacilitiesNeighborhood GreenwayProtected Bike LaneIn Street Minor SeparationMulti Use Trail

E DENNY WAY

S JACKSON STS DEARBORN ST

SW JUNEAU ST

SW ADMIRAL WAY

E PINE ST

BROAD ST

ALASKAN W

AY S

29TH

AVE

MLK JR W

AY S39TH AVE S

MLK JR W

AY S

NE 68TH ST

N 36TH ST

GREE

N L

AKE

WAY

N

1ST

AVE

NE

SENECA ST

SPRING ST

AIRPORT WAY S

1ST AVENOTE: These corridors will be studied in 2015 before final route selection

NE 100TH ST

Precise alignment subject to outcome of EIS

Page 21: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

SEATTLE BICYCLE MASTER PLAN IMPLEMENTATION PLAN 2015 - 2019 | 21

APPENDIX 4: PROJECT LISTS

Note that “Year” indicates planned construction year. Construction for some projects may span multiple years.

PROTECTED BIKE LANES

Primary Street Project ExtentsTotal Project

Length Year Tier8TH AVE S S Kenyon St to S Portland St 0.10 2015 3DELRIDGE WAY SW SW Andover St to West Seattle Bridge 0.25 2015 1DEXTER AVE/Roy St Mercer Ave to 7th Ave 0.45 2015 2N 34TH ST Fremont Ave N to Phinney Ave N 0.23 2015 1NE RAVENNA BLVD/COWEN PL NE E Greenlake Way N to NE 62nd St 1.10 2015 1RAINIER AVE S Ithaca Pl S to city limits 1.40 2015 1ROOSEVELT WAY NE NE 40th St to NE 45th St 0.30 2015 2NE CAMPUS PKWY University Way NE to Eastlake Ave NE 0.34 2015 4ROOSEVELT WAY NE NE 42nd St 0.05 2015 2ROOSEVELT WAY NE NE 45th St to NE 65th St 1.00 2015 2S DEARBORN ST Rainier Ave S to 5th Ave S 0.76 2015 1UNIVERSITY BR NE Campus Parkway to Fuhrman Ave E 0.35 2015 1WESTLAKE AVE N W Raye St to Valley St 1.24 2015 25th AVE* Denny Way to Olive Way 0.60 2016 2SWIFT AVE S S Warsaw to 19th Ave 0.30 2016 3W EMERSON PL Gilman Ave W to 21st Ave W 0.16 2016 16TH AVE S S Forest St to S Spokane St 0.41 2016 3S ROYAL BROUGHAM WAY E Frontage Rd S to Occidental Ave S 0.15 2016 3

2ND AV ET S*Yesler Way to S Jackson St - connection to S Dearborn St TBD 0.21 2016 1

PIKE ST* 2nd Ave to 9th Ave 0.43 2016 2UNION ST and CONVENTIONAL PL* 2nd Ave to Pike St 0.46 2016 2PINEHURST WAY NE NE 103rd St to NE 125th St 1.20 2016 3E PIKE ST* 9th Ave to Broadway 0.51 2016 1GILMAN AVE W and 20TH AVE W 32nd Ave W to Thorndyke Ave W 1.41 2016 3BROADWAY E E Denny Way to E Aloha St 0.57 2016 17TH AVE* Dexter Ave to Union St 0.69 2016 2

Page 22: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

22 | SEATTLE DEPARTMENT OF TRANSPORTATION

PROTECTED BIKE LANES

Primary Street Project ExtentsTotal Project

Length Year Tier2ND AVE* Broad St to Pike St 0.81 2016 1

N 130TH STLinden Ave N (Interurban Trail) to 5th Ave NE 1.15 2016 1

N 92ND ST Wallingford Ave N to 1st Ave N 0.40 2016 3

DEXTER AVE NMercer Ave to Roy St and Roy St to 9th Ave 0.18 2017 2

5th AVE* Spring St to S King St 0.68 2017 1M L KING JR WAY E Union St to S McClellan St 2.42 2017 18TH AVE S S Kenyon St to S Trenton St 0.50 2017 14TH AVE* Cedar St to S King St/2nd Ave Ext S 1.67 2017 1NE 40TH ST Brooklyn Ave NE to 7th Ave NE 0.41 2017 1VALLEY ST 9th Ave N to Fairview Ave N 0.25 2017 2S ROYAL BROUGHAM WAY S Occidental St to 6th Ave S 0.34 2018 3STEWART ST and EASTLAKE AVE E

7th Ave to Eastlake Ave E and Stewart St to Thomas St 0.57 2018 2

4TH AVE S and SEATTLE BLVD S and AIRPORT WAY S 2nd Ave Ext S to I-90 0.51 2018 1ALASKAN WAY Broad St to Virginia St 0.62 2018 1AIRPORT WAY S S Spokane St to Corson Ave S 1.37 2018 1N 34TH ST Fremont Ave E to Stone Way N 0.34 2018 16TH AVE S S Dearborn St to S Royal Brougham St 0.17 2018 39TH AVE N and BELL ST* Westlake Ave N to 7th Ave 0.70 2018 112TH AVE S and S MASSACHUSETTS ST

I-90 to S Massachusetts St and 12th Ave S to 13th Ave S 0.48 2018 1

12TH AVE S E Yesler Way to Golf Dr S 0.53 2018 1RAVENNA PL NE NE 55th St to Burke-Gilman Trail 0.17 2018 2AIRPORT WAY S S Corson St to S Hardy St 0.50 2019 11ST AVE* E Denny Way to Broad St 0.18 2019 2BROAD ST* Alaskan Way to 1st Ave 0.22 2019 2SPRING ST* Alaskan Way to 7th St 0.49 2019 2SENECA ST* Alakan Way to 9th Ave 0.61 2019 2ALASKAN WAY Virginia St to S Jackson St 0.84 2019 1M L KING JR WAY S S Holly St to S Henderson St 1.36 2019 1M L KING JR WAY S S Walden St to S Oregon St 0.65 2019 1EAST GREEN LAKE WAY N N 50th St to Kenwood Pl N 0.56 2019 1S JACKSON ST 20th Ave S to 31st Ave S 0.64 2019 1SW ADMIRAL WAY California Ave SW to SW Olga St 0.61 2019 11ST AVE NE NE 92nd St to N Northgate Way 0.90 2019 2NE 100TH ST 1st Ave NE to 5th Ave NE 0.30 2019 3

* Note that the Center City projects will be evaluated in 2015 before selecting final routes.

Page 23: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

SEATTLE BICYCLE MASTER PLAN IMPLEMENTATION PLAN 2015 - 2019 | 23

IMPLEMENTATION YEAR TOTAL MILES2015 7.572016 9.462017 6.112018 5.82019 7.86

NEIGHBORHOOD GREENWAYS

Primary Street Project ExtentsTotal Project

Length Year Tier

S MYRTLE ST37th Ave S/Chief Sealth Trail to Seward Park Ave S/Martha Washington Park 1.58 2015 1

22ND AVE (CANG Ph 1) S Jackson St to E John St 1.70 2015 117TH AVE NW NW 90th St to Ballard Ave NW 2.10 2015 1E GALER ST (CANG Ph 3) E John to E Roanoke St 2.00 2015 126TH AVE S (CANG Ph 2) S Jackson St to Rainier Ave S 1.30 2015 2

21ST AVE SWW Seattle Bridge Trail to Delridge Ave SW 4.00 2015 5

17TH AVE NW Ballard Ave NW to NW 45th St 0.20 2016 143RD AVE S/RAINIER VALLEY I-90 Trail to Barton Pl S 3.90 2016 1E UNION ST Broadway to 9th Ave 0.51 2017 1

SPRUCE ST

Broadway to Eastlake Ave E (3.5 mile long north-south greenway linking First Hill and Eastlake) 3.50 2017 1

N 100TH ST4th Ave NW to College Way N/North Seattle College 1.10 2017 1

E COLUMBIA ST Broadway to 29th Ave 1.21 2017 1S KING ST 5th Ave S to 20th Ave S 1.26 2017 1S SNOQUALMIE ST 13th Ave S to 34th Ave S 2.60 2017 134TH AVE SW SW Roxbury St to 26th Ave SW 3.00 2017 1N 83RD ST Loyal Way NW to Aurora Ave N 2.50 2017 1S MORGAN ST Beacon Ave S to 46th Ave S 2.10 2018 1MARION ST 7th Ave to Broadway 0.50 2018 11ST AVE NE E Greenlake Way N to N 36th St 2.10 2018 1S HILL ST 13th Ave S to 28th Ave S 1.00 2018 1

S FERDINAND STBeacon Ave S to Lake Washington Blvd 2.40 2018 1

16TH AVE E Volunteer Park to Judkins Park 2.80 2018 1

Page 24: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

24 | SEATTLE DEPARTMENT OF TRANSPORTATION

NEIGHBORHOOD GREENWAYS

Primary Street Project ExtentsTotal Project

Length Year TierS DEARBORN ST/29TH AVE 23rd Ave S to E Madison St 2.80 2019 1E DENNY WAY Broadway to 21st Ave E 0.80 2019 139TH AVE S S Myrtle Pl to S Kenyon St 1.00 2019 1SW JUNEAU ST 48th Ave SW to 34th Ave SW 0.90 2019 1NE 68TH ST/NE 66TH ST 8th Ave NE to 50th Ave NE 2.20 2019 1E PINE ST 17th Ave E to 33rd Ave E 0.90 2019 1N 36TH ST Fremont Ave N to Corliss Ave N 0.90 2019 1

IMPLEMENTATION YEAR TOTAL MILES2015 12.682016 4.12017 15.682018 10.92019 9.5

IN-STREET PROJECTS

Primary Street Project ExtentsTotal Project

Length Year TierPHINNEY AVE N N 43rd St to N 50th St 0.50 2015 1N 43RD ST Phinney AVE N to Fremont Ave N 0.11 2015 3RAINIER AVE S Ithaca Pl S to Seward Park Ave S 0.11 2015 2SW ADMIRAL WAY California Ave SW to SW 63rd St 1.15 2015 3COLLEGE WAY N N 92nd St to N 103rd St 0.52 2015 1RENTON AVE S 51st Ave S to S 112th St 1.30 2016 3MERIDIAN AVE N N 103rd St to N 112th St 0.90 2016 3BANNER WAY NE Roosevelt Way NE to 5th Ave NE 0.31 2016 2

Page 25: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

SEATTLE BICYCLE MASTER PLAN IMPLEMENTATION PLAN 2015 - 2019 | 25

OFF-STREET FACILITIES

Primary Street Project ExtentsTotal Project

Length Year TierBEACON AVE S 14th Ave S to S Holgate St 0.350 2015 1PORT SIDE TRAIL (west side) S King St to S Atlantic St 0.616 2015 2DUWAMISH TRAIL (S Portland St) W Marginal Way to 8th Ave S 0.560 2015 3B-GT “Missing Link” (pending outcome of EIS process) 11th Ave NW to Chittenden Locks 1.363 2017 2SR-520 Bridge Trail Montlake Blvd E to Eastside of water 2.182 2017 5

CATALYST PROJECTSProject Extents Year Tier

Chelan Ave SW/W Marginal Way/Alki Trail/SW Marginal Way/Delridge ST/SR-99 intersection - first phase

2015 N/A

University Bridge - north leg to Roosevelt Way NE/11th Ave NE and the University of Washington

2015 N/A

S Holgate St across I-5 2016 N/A

Page 26: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

26 | SEATTLE DEPARTMENT OF TRANSPORTATION

APPE

ND

IX 5

: STR

ATEG

IES

AND

PROG

RAM

S

CHAP

TER

4: T

HE B

ICYC

LE N

ETW

ORK

BMP

Stra

tegy

Activ

itySt

atus

4.1

– 4.

6 Im

plem

ent t

he b

icyc

le

faci

litie

sSe

e pr

ojec

t lis

ts fo

r pro

ject

s th

at w

ill b

e st

udie

d, d

esig

ned,

and

impl

emen

ted

in 2

015-

2019

. SDO

T w

ill c

ontin

ue to

rese

arch

and

in

corp

orat

e be

st p

ract

ices

, par

tner

with

oth

er

mod

es, a

nd d

evel

op e

duca

tiona

l too

ls.

SDOT

is o

n tr

ack

to m

eet 2

015

wor

k pl

an ta

rget

s.

4.7

Impl

emen

t upg

rade

s of

ex

istin

g bi

cycl

e fa

cilit

ies

Bicy

cle

faci

litie

s up

grad

e pr

ojec

ts w

ill b

e id

entif

ied

thro

ugh

BMP

proj

ect p

riorit

izat

ion,

an

d th

roug

h sa

fety

cor

ridor

pro

ject

s. R

efer

to

stra

tegy

7.3

and

7.1

3 fo

r rel

ated

wor

k.

SDOT

is o

n tr

ack

to m

eet 2

015

wor

k pl

an ta

rget

s.

4.8

Inst

all b

icyc

le d

etec

tion

at

traf

fic s

igna

ls in

eve

ry n

ew b

icyc

le

faci

lity,

as w

ell a

s w

ith a

ll st

reet

re

plac

emen

t pro

ject

s

SDOT

will

dev

elop

con

sist

ent b

icyc

le d

etec

tion

stan

dard

s by

bic

ycle

faci

lity

type

, inv

ento

ry

exis

ting

dete

ctio

n on

hig

h pr

iorit

y bik

e fa

cilit

ies

to d

eter

min

e up

grad

e ne

eds,

and

dev

elop

a

prio

ritiz

ed w

ork

plan

for i

mpl

emen

tatio

n.

SDOT

is c

urre

ntly

reco

mm

endi

ng a

ppro

pria

te b

ike

dete

ctio

n on

a c

ase-

by-c

ase

basi

s, a

nd w

ill s

tart

de

velo

ping

sta

ndar

ds b

ased

on

faci

lity t

ype

and

inte

rsec

tion

geom

etry

in 2

015.

4.10

Des

ign

all b

icyc

le fa

cilit

ies

to

mee

t or e

xcee

d th

e la

test

fede

ral,

stat

e an

d lo

cal g

uide

lines

This

is S

DOT’

s st

anda

rd p

ract

ice.

In a

dditi

on,

the

upda

te o

f the

Sea

ttle

Righ

t-of

-Way

Im

prov

emen

ts M

anua

l will

incl

ude

bicy

cle

faci

lity

desi

gn g

uide

lines

.

SDOT

is c

urre

ntly

upd

atin

g th

e Ri

ght-

of-W

ay

Impr

ovem

ent M

anua

l (RO

WIM

), w

hich

will

in

clud

e bi

cycl

e de

sign

gui

delin

es.

4.11

Impr

ove

bicy

cle

safe

ty a

nd

acce

ss a

t rai

lroad

and

rail

tran

sit

cros

sing

s an

d pa

ralle

l fac

ilitie

s

SDOT

will

con

duct

an

inve

ntor

y of

all

loca

tions

w

here

bic

ycle

faci

litie

s cr

oss

railr

oad

and

rail

tran

sit (

stre

etca

r and

Lin

k lig

ht ra

il) li

nes

in 2

015,

and

cre

ate

a pr

iorit

ized

list

of s

pot

impr

ovem

ent p

roje

cts.

SDOT

has

initi

ated

theT

rails

Upg

rade

and

M

aint

enan

ce P

lan,

whi

ch w

ill h

elp

prio

ritiz

e sp

ot

impr

ovem

ents

at r

ailro

ad c

ross

ings

.

4.12

– 4

.15

Mul

timod

al c

orrid

or

deve

lopm

ent

SDOT

’s M

ultim

odal

Cor

ridor

Dev

elop

men

t Pr

ogra

m w

ill b

egin

ass

essm

ent o

f ten

co

rrid

ors

in 2

014-

2015

.

SDOT

is c

urre

ntly

upd

atin

g th

e M

ultim

odal

Co

rrid

ors

wor

k pl

an to

bet

ter a

lign

with

the

new

ly re

leas

ed M

ove

Seat

tle d

ocum

ent.

4.16

Upd

ate

the

curb

spa

ce

allo

catio

n pr

iorit

ies

in th

e Co

mpr

ehen

sive

Pla

n up

date

SDOT

will

wor

k w

ith th

e De

part

men

t of

Plan

ning

and

Dev

elop

men

t (DP

D) a

s th

e Co

mpr

ehen

sive

Pla

n is

upd

ated

.

SDOT

is c

urre

ntly

con

duct

ing

a cu

rbsp

ace

man

agem

ent s

tudy

and

wor

king

with

DPD

on

the

Com

preh

ensi

ve P

lan

upda

te.

Page 27: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

SEATTLE BICYCLE MASTER PLAN IMPLEMENTATION PLAN 2015 - 2019 | 27

CHAP

TER

5: E

ND-

OF-T

RIP

FACI

LITI

ESBM

P St

rate

gyAc

tivity

Stat

us5.

1 Up

date

the

Seat

tle M

unic

ipal

Co

de (S

MC)

bic

ycle

par

king

re

quire

men

ts

SDOT

will

wor

k w

ith D

PD to

revi

ew th

e ex

istin

g la

ngua

ge a

nd id

entif

y pr

opos

ed c

hang

es.

This

wor

k is

pla

nned

for l

ater

in 2

015.

5.2

Deve

lop

a bi

cycl

e pa

rkin

g im

plem

enta

tion

prog

ram

SDOT

will

dev

elop

a m

etho

dolo

gy to

iden

tify

and

prio

ritiz

e hi

ghde

man

d lo

catio

ns fo

r bic

ycle

pa

rkin

g in

201

5, a

nd w

ill c

ompl

ete

a Cl

ient

As

sist

ance

Mem

o (C

AM) f

or in

stal

latio

n of

pr

ivat

e bi

cycl

e ra

cks

in th

e pu

blic

righ

t-of

-way

.

SDOT

is c

urre

ntly

wor

king

with

stu

dent

s fr

om th

e Un

iver

sity

of W

ashi

ngto

n to

hel

p pr

iorit

ize

bike

pa

rkin

g lo

catio

ns. I

nter

nal g

uide

lines

for p

rivat

e bi

cycl

e ra

ck in

stal

latio

n in

the

publ

ic ri

ght-

of-

way

hav

e be

en d

evel

oped

and

a C

AM w

ill b

e de

velo

ped

late

r in

2015

.5.

5 Pr

ovid

e sh

ort-

and

long

-ter

m

secu

re b

icyc

le p

arki

ng a

t hig

h-ca

paci

ty tr

ansi

t sta

tions

, tra

nsit

hubs

, and

hea

vily

-use

d bu

s st

ops

SDOT

will

par

tner

with

oth

er a

genc

ies

to

coor

dina

te th

e de

velo

pmen

t of l

ong-

term

se

cure

bic

ycle

par

king

.

SDOT

is c

urre

ntly

wor

king

with

Sou

nd T

rans

it on

N

orth

gate

Lin

k Li

ght R

ail E

xten

sion

to p

rovi

de

suffi

cien

t cov

ered

bic

ycle

par

king

.

Page 28: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

28 | SEATTLE DEPARTMENT OF TRANSPORTATION

CHAP

TER

6: P

ROGR

AMS

BMP

Stra

tegy

Activ

itySt

atus

6.1

and

7.9

Deve

lop

a bi

cycl

e sa

fety

ed

ucat

ion

prog

ram

SDOT

will

cont

inue

to b

uild

upo

n ex

istin

g sa

fety

ed

ucat

iona

l and

enc

oura

gem

ent p

rogr

ams,

and

cr

eate

new

pro

gram

s. A

s pa

rt o

f thi

s SD

OT w

ill:

• Ex

pand

sch

ool b

icyc

le s

afet

y ed

ucat

ion

to

two

mor

e sc

hool

s pe

r yea

r (12

tota

l in

2015

)•

Asse

ss fe

asib

ility

and

cos

t of i

nclu

ding

m

iddl

e sc

hool

and

hig

h sc

hool

road

way

sa

fety

edu

catio

n (a

s pa

rt o

f the

Sch

ool R

oad

Safe

ty p

lan)

• Re

sear

ch a

nd a

sses

s th

e fe

asib

ility

of l

aws

requ

iring

that

all

driv

er tr

aini

ng a

nd d

river

’s

licen

se re

new

al p

roce

sses

cov

er b

icyc

le

faci

litie

s an

d sa

fety

• De

velo

p an

d di

strib

ute

bicy

cle

educ

atio

n m

ater

ials

to e

ncou

rage

a w

ide

rang

e of

cu

rren

t and

new

ride

rs th

roug

hout

the

city

• En

gage

with

Sea

ttle

Publ

ic S

choo

ls

to c

ontin

ue S

afe

Rout

es to

Sch

ool

part

ners

hips

for t

raffi

c sa

fety

edu

catio

n an

d en

cour

agem

ent o

f wal

king

and

bik

ing

to

scho

ol

In F

all 2

015,

SDO

T w

ill e

xpan

d th

e SR

TS

prog

ram

to tw

o m

ore

scho

ols.

In 2

015,

SDO

T st

arte

d im

plem

entin

g a

plan

to

reac

h al

l ele

men

tary

sch

ools

bet

wee

n 20

15-

2018

. Pen

ding

the

succ

ess

of th

e el

emen

tary

sc

hool

pro

gram

and

fund

ing

avai

labi

lity,

SDOT

w

ill e

xpan

d th

e ed

ucat

ion

prog

ram

to m

iddl

e an

d hi

gh s

choo

l stu

dent

s in

201

9.

Late

r in

2015

, SDO

T w

ill e

valu

ate

how

this

may

fit

into

our

exi

stin

g w

ork

load

.

In 2

015,

SDO

T w

ill c

ontin

ue to

pub

lish

educ

atio

n an

d en

cour

agem

ent m

ater

ials

, in

clud

ing

an u

pdat

ed b

ike

map

, Sea

ttle

by B

ike

broc

hure

s, a

nd B

ikel

ife m

agaz

ine.

SDOT

will

con

tinue

eng

agin

g w

ith S

eattl

e Pu

blic

Sch

ools

to p

rom

ote

wal

king

and

bik

ing

to s

choo

l.6.

3 Su

ppor

t im

prov

ed a

cces

s to

bi

cycl

es a

nd e

ncou

rage

men

t of

bicy

clin

g op

port

uniti

es

SDOT

will

dev

elop

a m

etho

dolo

gy to

iden

tify

and

prio

ritiz

e hi

ghde

man

d lo

catio

ns fo

r bic

ycle

pa

rkin

g in

201

5, a

nd w

ill c

ompl

ete

a Cl

ient

As

sist

ance

Mem

o (C

AM) f

or in

stal

latio

n of

pr

ivat

e bi

cycl

e ra

cks

in th

e pu

blic

righ

t-of

-way

.

SDOT

is c

urre

ntly

wor

king

with

stu

dent

s fr

om

the

Univ

ersi

ty o

f Was

hing

ton

to h

elp

prio

ritiz

e bi

ke p

arki

ng lo

catio

ns. I

nter

nal g

uide

lines

for

priv

ate

bicy

cle

rack

inst

alla

tion

in th

e pu

blic

rig

ht-o

f-w

ay h

ave

been

dev

elop

ed a

nd a

CAM

w

ill b

e de

velo

ped

late

r in

2015

.

Page 29: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

SEATTLE BICYCLE MASTER PLAN IMPLEMENTATION PLAN 2015 - 2019 | 29

CHAP

TER

7: IM

PLEM

ENTA

TION

APP

ROAC

HBM

P St

rate

gyAc

tivity

Stat

us7.

1 an

d 7.

2 De

velo

p an

d st

reng

then

proc

edur

es a

nd p

roce

sses

for

bicy

cle

proj

ect d

eliv

ery

SDOT

has

a w

ell-

deve

lope

d ev

alua

tion,

de

sign

and

pub

lic e

ngag

emen

t pro

cess

for

neig

hbor

hood

gre

enw

ays.

In 2

015,

SDO

T w

ill

cont

inue

to u

se a

nd re

fine

this

pro

cess

, and

w

ill a

dapt

it fo

r oth

er p

roje

cts

type

s su

ch a

s pr

otec

ted

bicy

cle

lane

s. In

add

ition

, SDO

T w

ill:

• Co

llect

bef

ore

and

afte

r dat

a an

d co

mpl

ete

perc

eptio

n su

rvey

s•

Deve

lopi

ng g

uide

lines

for “

pop-

up” b

icyc

le

faci

litie

s•

Enha

nce

data

col

lect

ion

prog

ram

by

inco

rpor

atin

g ne

w te

chno

logy

SDOT

will

con

tinue

to c

ondu

ct d

ata-

driv

en

plan

ning

pro

cess

es, c

olle

ctin

g qu

antit

ativ

e “b

efor

e” d

ata

and

adm

inis

terin

g pe

rcep

tion

surv

eys

as fu

ndin

g al

low

s.

SDOT

has

dev

elop

ed “p

op-u

p” n

eigh

borh

ood

gree

nway

gui

delin

es a

nd g

uide

lines

for P

ark-

ing

Day

inst

alla

tions

.

The

Cent

er C

ity B

ike

Net

wor

k st

udy

will

util

ize

GPS

rider

ship

dat

a vi

a St

rava

to id

entif

y th

e m

ost c

omm

only

utli

ized

rout

es in

the

cent

er

city

. In

addi

tion,

SDO

T is

curr

ently

test

ing

new

mic

ro ra

doar

det

ectio

n fo

r cou

ntin

g bi

kes

on p

rote

cted

bik

e la

nes.

7.3

And

7.13

Rev

iew

bic

ycle

-rel

ated

co

llisi

ons,

col

lisio

n ra

tes

and

frequ

enci

es o

ver t

ime

and

iden

tify

and

impl

emen

t saf

ety s

trat

egie

s.

Impr

ove

bicy

cle

faci

litie

s as

nee

ded,

ba

sed

on p

erfo

rman

ce c

riter

ia.

SDOT

will

bui

ld o

n th

e ex

istin

g co

llisi

on re

view

pr

ogra

m a

nd w

ill:

• An

alyz

e bi

cycl

e-in

volv

ed c

ollis

ions

per

fa

cilit

y ty

pe to

iden

tify

tren

ds, b

ehav

iors

, an

d en

gine

erin

g so

lutio

ns•

Crea

te a

dat

a-dr

iven

pro

cess

to id

entif

y sp

ot

and/

or c

orrid

or im

prov

emen

t pro

ject

s•

Deve

lop

a pr

iorit

ized

list

of s

pot

impr

ovem

ent p

roje

cts

SDOT

is in

itiat

ing

a Bi

cycl

e an

d Pe

dest

rian

Safe

ty A

naly

sis

to a

ddre

ss th

ese

conc

erns

. The

dr

aft r

epor

t is

expe

cted

by

the

end

of 2

015

and

will

hel

p pr

iorit

ize

spot

impr

ovem

ents

in 2

016.

7.14

And

7.5

Cre

ate

a m

ulti-

use

trai

ls u

pgra

de a

nd m

aint

enan

ce

plan

. Neg

otia

te m

aint

enan

ce

agre

emen

ts w

ith p

artn

ers.

SDOT

will

dev

elop

a tr

ails

upg

rade

and

m

aint

enan

ce p

lan

in 2

015,

whi

ch w

ill g

uide

fu

ture

upg

rade

s to

the

mul

ti-us

e tr

ails

.

SDOT

is in

itiat

ing

a Tr

ails

Upg

rade

and

M

aint

enan

ce P

lan

to g

uide

futu

re in

vest

men

ts.

The

draf

t rep

ort i

s ex

pect

ed b

y th

e en

d of

201

5.

Page 30: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

30 | SEATTLE DEPARTMENT OF TRANSPORTATION

CHAP

TER

7: IM

PLEM

ENTA

TION

APP

ROAC

HBM

P St

rate

gyAc

tivity

Stat

us7.

10 –

7.1

2 M

aint

ain

on-s

tree

t an

d of

f-st

reet

bic

ycle

faci

litie

s.

Cons

ider

mai

nten

ance

cos

ts,

proc

edur

es, a

nd lo

ng-t

erm

fund

ing

mec

hani

sms

are

a pa

rt o

f all

new

bi

cycl

e fa

cilit

y pr

ojec

ts. E

ncou

rage

pe

ople

to re

port

impr

ovem

ents

re

ques

ts to

SDO

T.

To a

ddre

ss m

aint

enan

ce, S

DOT

will

:•

Crea

te li

fe-c

ycle

cos

ts p

er b

icyc

le fa

cilit

y to

be

tter u

nder

stan

d an

d ga

uge

curr

ent a

nd

futu

re m

aint

enan

ce n

eeds

• Co

ordi

nate

pro

ject

s w

ith S

tree

t M

aint

enan

ce P

avin

g pl

an•

Eval

uate

add

ition

al b

ike

faci

lity

swee

ping

as

par

t of t

he S

PU/S

DOT

stre

et s

wee

ping

pr

ogra

m•

Com

plet

e 10

bik

e sp

ot im

prov

emen

ts in

201

5•

Cont

inue

to p

rom

ote

exis

ting

way

s fo

r peo

ple

to re

port

mai

nten

ance

and

im

prov

emen

ts re

ques

ts

As w

e co

ntin

ue to

bui

ld p

rote

cted

bik

e la

nes,

tr

acki

ng m

aint

enan

ce c

osts

will

be

impo

rtan

t. SD

OT is

cur

rent

ly re

sear

chin

g be

st p

ract

ices

fr

om p

eer c

ities

.

As p

art o

f the

Com

plet

e St

reet

s fr

amew

ork,

SD

OT is

wor

king

to c

oord

inat

e up

com

ing

pavi

ng p

roje

cts

and

prop

osed

bic

ycle

faci

litie

s.

As th

e ci

ty b

uild

s a

criti

cal m

ass

of p

rote

cted

bi

ke la

nes,

SDO

T w

ill id

entif

y th

e m

ost c

ost

effe

ctiv

e w

ay to

sw

eep

bicy

cle

faci

litie

s.

SDOT

is o

n tr

ack

to c

ompl

ete

10 b

ike

spot

im

prov

emen

ts in

201

5. T

he u

pcom

ing

Trai

ls

Upgr

ade

and

Mai

nten

ance

Pla

n an

d Bi

cycl

e an

d Pe

dest

rian

Safe

ty A

nalys

is w

ill h

elp

prio

ritiz

e bi

ke s

pot i

mpr

ovem

ents

beg

inni

ng in

201

6.

SDOT

and

the

May

or’s

Offi

ce a

re c

ontin

uing

to

pro

mot

e th

e w

eb-b

ased

, Fin

d It,

Fix

It,

app

licat

ion

to im

prov

e re

port

ing

of

mai

nten

ance

requ

ests

.7.

17 E

stab

lish

a br

oad-

base

d fu

ndin

g ap

proa

chSD

OT w

ill c

ontin

ue to

rese

arch

and

pur

sue

gran

ts, a

nd o

ther

fund

ing

oppo

rtun

ities

.SD

OT re

cent

ly a

nnou

nced

a p

ropo

sal f

or a

new

le

vy to

repl

ace

Brid

ging

the

Gap,

whi

ch e

xpire

s at

the

end

of 2

015.

Page 31: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

SEATTLE BICYCLE MASTER PLAN IMPLEMENTATION PLAN 2015 - 2019 | 31

OTHE

R RE

LATE

D ST

RATE

GIES

AN

D AC

TION

SBM

P St

rate

gyAc

tivity

Stat

usDe

velo

p an

d im

plem

ent a

pro

cess

to

eva

luat

e tu

rn o

n re

d re

stric

tions

, du

al tu

rns,

and

spe

ed li

mit

chan

ges.

This

will

be

addr

esse

d as

par

t of r

oad

safe

ty

wor

k st

artin

g in

late

201

4 an

d co

ntin

uing

into

20

15 a

nd b

eyon

d.

Visi

on Z

ero

iden

tifie

s da

ta-d

riven

ped

estr

ian

safe

ty e

nhan

cem

ents

incl

udin

g lo

wer

spe

ed

limits

, lea

ding

or l

aggi

ng p

edes

tria

n in

terv

als,

pr

otec

ted

turn

pha

ses,

elim

inat

ion

of d

ual t

urn

lane

s, s

igna

l im

prov

emen

ts a

nd n

o tu

rns

on

red.

In 2

015,

SDO

T is

eva

luat

ing

safe

tyim

prov

emen

ts a

t the

follo

win

g lo

catio

ns

dow

ntow

n: 5

th A

ve a

t Uni

on, U

nive

rsity

, Spr

ing,

an

d Se

neca

Str

eets

; 6th

Ave

at P

ike,

Spr

ing,

Ch

erry

, Jam

es, a

nd U

nive

rsity

Str

eets

;an

d 7t

h Av

e an

d Ol

ive

Way

.

Page 32: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

32 | SEATTLE DEPARTMENT OF TRANSPORTATION

APPENDIX 6: PROJECT CHANGES IN THIS UPDATE

1. Projects added to the Implementation Plan as part of the March 2015 update:

a. In 2015, the existing bike lanes on College Way N, between N 92nd St and N 103rd St will be upgraded to buffered bike lanes (0.52 miles).

b. A bike lane on Meridian Ave N, between N 103rd St and N 112th St (0.9 miles), has been added to the 2016 project list, in order to coordinate with the paving project.

c. A PBL on 5th Ave, between Denny St and Olive St (0.6 miles), will be evaluated in 2015 as part of the Center City network development process.

d. A PBL on Swift Ave S, between S Warsaw St and 19th Ave S, has been added to the 2016 project list. (This project was mapped but not listed in the October 2014 Implementation Plan.)

e. A bike lane on Renton Ave S, between 51st Ave S and S 112th St (1.3 miles), has been added to the 2016 project list, in order to coordinate with the paving project.

f. A bike lane on Banner Way N, between Roosevelt Way NE and 5th Ave NE (0.31 miles), has been added to the 2016 project list.

g. A PBL on Airport Way S, between S Corson St and S Hardy St (0.5 miles), has been added to the 2019 project list. (This project was mapped but not listed in the October 2014 Implementation Plan.)

h. A PBL on the University Bridge, from NE Campus Pkwy to Fuhrman Ave (0.35 miles), has been added to the 2015 project list and will be installed in 2015-2016 as part of the Roosevelt Paving and Safety Project.

i. A PBL on Roosevelt Way NE, from NE 45th St to NE 65th St (1.0 miles), has been added to the 2015 project list and will be installed in 2015-2016 as part of the Roosevelt Paving and Safety Project.

j. Based on community support and engineering feasibility, the Pinehurst Way NE PBL project limits will now span NE 103rd St to NE 125th St (1.2 miles). The previous project extents were Roosevelt Way NE to NE 117th St (0.5 miles).

k. A PBL on N 92nd St, between Wallingford Ave N and 1st Ave N (0.4 miles), has been added to the 2016 project list, in order to coordinate with the paving project.

l. A PBL on 1st Ave NE, between NE 92nd St and N Northgate Way (0.9 miles), has been added to the 2019 project list, in order to coordinate with the Sound Transit Northgate Station construction.

m. A PBL on NE 100th St, between 1st Ave NE and 5th Ave NE (0.3 miles), has been added to the 2019 project list, in order to coordinate with the Sound Transit Northgate Station construction.

Page 33: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

SEATTLE BICYCLE MASTER PLAN IMPLEMENTATION PLAN 2015 - 2019 | 33

2. Projects previously in the Implementation Plan that have been modified to create more logical project limits or remedy inconsistencies:

a. NE Campus Pkwy PBL project now spans from Eastlake Ave NE/Roosevelt Way NE to University Way NE and includes a block of Brooklyn Ave NE (NE Campus Pkwy to NE 40th St) to better integrate the existing network and provide access to the B-GT detour and University of Washington campus. The project length has also been corrected.

b. 0.3 miles of the planned 0.35 miles of the Roosevelt Way NE protected bike lanes between NE 40th St and NE 45th St were constructed in 2015. The remaining 0.05 miles of PBL at NE 42nd St will be constructed as part of the AAC project in 2015 – 2016.

c. The 2nd Ave Extension S PBL project from S Yesler St to S Jackson St will likely be extended to connect to the planned protected bike lane on S Dearborn St; the alignment will be determined as part of the Center City Bike Network process.

d. Based on community outreach and engineering judgment, the S Myrtle St neighborhood greenway planned route deviates from the route shown in the BMP. The planned route connects Martha Washington Park and John C Little, Sr., Park and is 1.58 miles long.

e. The 17th Ave NW neighborhood greenway will connect Whitman Middle School (NW 90th St) with Ballard Ave NW (2.1 miles) in 2015. In 2016, SDOT will extend the project to the Ballard Bridge and NW 45th St (0.2 miles).

f. The S Hill St neighborhood greenway route has been reduced to 1.0 miles (between 13th Ave S and 28th Ave S), as the Rainier Valley North-South (43rd Ave S) neighborhood greenway project extents will include the rest of S Hill St project (0.7 miles). The Rainier Valley North-South project is planned for 2016 implementation.

g. In order to coordinate with the Sound Transit Roosevelt Station plans, the NE 68th St neighborhood greenway project limits have been extended 0.7 miles to 8th Ave NE / Weedin Pl NE.

Page 34: The Seattle Department of Transportation SEATTLE ......Building network connectivity Implementing programs All of these factors were considered in developing the project lists for

34 | SEATTLE DEPARTMENT OF TRANSPORTATION

The Seattle Department of Transportation700 5th Avenue, Suite 3800PO Box 34996Seattle, WA 98124-4996(206) 684-ROAD (7623)www.seattle.gov/transportation 3.2015