the role of the licensed surveyor in the process of registration

15
16.10.2014 UN-WPLA-Workshop Vienna Gerald Fuxjäger Licensed Surveyor 1 The role of the licensed surveyor in the process of registration. Gerald Fuxjäger

Upload: merritt-nixon

Post on 03-Jan-2016

50 views

Category:

Documents


3 download

DESCRIPTION

The role of the licensed surveyor in the process of registration. Gerald Fuxjäger. Gerald Fuxjäger. born 1961 in Lienz TU Graz, master´s degree surveying and geoinformation 1988 s pecialized in photogrammetry Civil Engineer for Surveying and Geoinformation = licensed surveyor 1995 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: The role of the licensed surveyor in the process of registration

16.10.2014 UN-WPLA-Workshop Vienna Gerald Fuxjäger Licensed Surveyor 1

The role of the licensed surveyor in the process of

registration.

Gerald Fuxjäger

Page 2: The role of the licensed surveyor in the process of registration

14.05.2014 Geokolloquium Graz Gerald Fuxjäger Grundlagenvermessung in Albanien 2

Gerald Fuxjäger

• born 1961 in Lienz

• TU Graz, master´s degree surveying and geoinformation 1988– specialized in photogrammetry

• Civil Engineer for Surveying and Geoinformation= licensed surveyor 1995

• CEO and part-owner ADP Rinner ZT GmbH

• juridical confirmed and certified expert

• President of the Chamber for Architects an Civil Engineers in • Styria and Carinthia, since 2006

Page 3: The role of the licensed surveyor in the process of registration

14.05.2014 Geokolloquium Graz Gerald Fuxjäger Grundlagenvermessung in Albanien 3

1 Education

• Master´s Degree in Surveying

• 3 years of practice,

– thereof min. 1 year in land register projects, employed at a licensd surveyor

• Course and examination for Civil Engineers

• Authorization by ministry of economics

• Sworn statement / oath at the Governor

• Membership at chamber of architects and civil engineers

Page 4: The role of the licensed surveyor in the process of registration

14.05.2014 Geokolloquium Graz Gerald Fuxjäger Grundlagenvermessung in Albanien 4

2 quantity of licensed surveying

•more than 25.000 projects per year

•more than 90 % of licensed surveyors

– in an open market

•Customers– Governmental offices– Communities– Companies– private owners

Page 5: The role of the licensed surveyor in the process of registration

14.05.2014 Geokolloquium Graz Gerald Fuxjäger Grundlagenvermessung in Albanien 5

3 offering phase• Investigation at regional government GIS

• Consulting, contracting with costumer

Page 6: The role of the licensed surveyor in the process of registration

14.05.2014 Geokolloquium Graz Gerald Fuxjäger Grundlagenvermessung in Albanien 6

4.1 Investigation phase

• at VA / BEV for

– DKM

– KDB fix points in ETRS and MGI coo.

– Old plans

Page 7: The role of the licensed surveyor in the process of registration

14.05.2014 Geokolloquium Graz Gerald Fuxjäger Grundlagenvermessung in Albanien 7

4.2 Investigation phase

• at Ministry of JusticeBook of ownership

•Investigation at community for minimum area of parcels, width of roads, etc.

Page 8: The role of the licensed surveyor in the process of registration

14.05.2014 Geokolloquium Graz Gerald Fuxjäger Grundlagenvermessung in Albanien 8

5 preparing phase

• Transformation ETRS – MGI

• Transformation of old (local) plans

• Plan for the negotiation

• Fixing the date

• Invitation of all neighbours, ev. reinvestigation

• Preparing the protocol

Page 9: The role of the licensed surveyor in the process of registration

14.05.2014 Geokolloquium Graz Gerald Fuxjäger Grundlagenvermessung in Albanien 9

6.1 field work

• Searching and remeasuring fix points

• Searching and remeasuring boarder points

• Boarder negotiation with all neighbours

– consulting

• Fixing of old boarders

• (re-) marking of boarder points

• Declaration of approval of all neighbours

Page 10: The role of the licensed surveyor in the process of registration

14.05.2014 Geokolloquium Graz Gerald Fuxjäger Grundlagenvermessung in Albanien 10

6.2 field work

• when parcels are divided:

constructing and definition of new boardersfixing and marking of new boarder points

• measuring all old and new boarder points

• controlling

• writing the protocol

Page 11: The role of the licensed surveyor in the process of registration

14.05.2014 Geokolloquium Graz Gerald Fuxjäger Grundlagenvermessung in Albanien 11

7 assessment phase

• Geodetical calculation

• Making plan and area calculation

• Sending draft to costumer

• Finishing plan and area calculation

• Controlling, digital signing

• Submitting digital to VA / BEV

• Submitting analog to local community, ev. to forest and water office

Page 12: The role of the licensed surveyor in the process of registration

14.05.2014 Geokolloquium Graz Gerald Fuxjäger Grundlagenvermessung in Albanien 12

8.1 final phase

• Getting (positive) administrative decisions from– VA / BEV, local community, ev. forest and water office

• Preparing final delivering, analog signing

• Delivering to costumer and / or notary– Plan– Area calculations– Protocol– Administrative decisions

Page 13: The role of the licensed surveyor in the process of registration

14.05.2014 Geokolloquium Graz Gerald Fuxjäger Grundlagenvermessung in Albanien 13

example

Page 14: The role of the licensed surveyor in the process of registration

14.05.2014 Geokolloquium Graz Gerald Fuxjäger Grundlagenvermessung in Albanien 14

8.2 final phase

• Writing bill to costumer

• Paying administrative fees

• Archiving digital and analog

Page 15: The role of the licensed surveyor in the process of registration

14.05.2014 Geokolloquium Graz Gerald Fuxjäger Grundlagenvermessung in Albanien 15

•Thank you for your attention,

•Questions ?

End