the road to predictive operations
TRANSCRIPT
![Page 1: The Road to Predictive Operations](https://reader033.vdocuments.us/reader033/viewer/2022060902/6298ef56146faa7e811e77cb/html5/thumbnails/1.jpg)
The Road to Predictive Operations
Brandon Porco
Network Operations Manager
www.NorthropGrumman.com
![Page 2: The Road to Predictive Operations](https://reader033.vdocuments.us/reader033/viewer/2022060902/6298ef56146faa7e811e77cb/html5/thumbnails/2.jpg)
Northrop Grumman Corporation
Northrop Grumman is a leading global security company providing innovative systems, products, and solutions in aerospace, electronics, information systems, shipbuilding and technical services to U.S. and international military, government and commercial customers worldwide.
Operations in all 50 states and 25 countries
120,000 employees
$17 B Market Cap
$33.8 B in Sales
![Page 3: The Road to Predictive Operations](https://reader033.vdocuments.us/reader033/viewer/2022060902/6298ef56146faa7e811e77cb/html5/thumbnails/3.jpg)
The Need for IT Transformation at Northrop Grumman
Greater enterprise focus: bring balance between sectors and enterprise
Service Catalog vs. custom
Enterprise architecture vs. local solutions and one-offs
Limited information architecture
Re-use vs. re-building
Implement technological advances within our service offerings
Complex funding model
Funding managed almost entirely by sectors
No line of sight to financial plan or cost of services
![Page 4: The Road to Predictive Operations](https://reader033.vdocuments.us/reader033/viewer/2022060902/6298ef56146faa7e811e77cb/html5/thumbnails/4.jpg)
Driving Factors
Historic reporting
Current operational status
Management by Excel
But that‟s not how you drive… right?
(and no, this isn‟t my car)
![Page 5: The Road to Predictive Operations](https://reader033.vdocuments.us/reader033/viewer/2022060902/6298ef56146faa7e811e77cb/html5/thumbnails/5.jpg)
Driving Towards Predictive Operations
When we drive, we look ahead. We look behind. We look at the current operating status… and we steer. It‟s real-time situational awareness and decision making.
![Page 6: The Road to Predictive Operations](https://reader033.vdocuments.us/reader033/viewer/2022060902/6298ef56146faa7e811e77cb/html5/thumbnails/6.jpg)
Predictive Operations is a Shift in Thinking
It‟s not about tools…yet
It‟s about avoiding downtime
Always On requires 100% uptime, not 99%
Customers expect 100%, soon they will demand it
99% availability won‟t be good enough
It isn‟t about high-availability networking
Reactive metrics, such as % Uptime, Cost of Downtime will become irrelevant
Cost of Downtime Avoided/month will become a more meaningful metric to show the value of predictive operations.
To achieve this, you have to know about a problem before it becomes downtime – hence, Predictive Operations
![Page 7: The Road to Predictive Operations](https://reader033.vdocuments.us/reader033/viewer/2022060902/6298ef56146faa7e811e77cb/html5/thumbnails/7.jpg)
It‟s A Change From Reaction to Prediction
Reactive Predictive
REGION SECTOR UNIT LOCATION% WAN
AVAILABILITY
UTILIZATION
%
LATENCY
milisecondsROOT CAUSE?
ROOT CAUSE
CATEGORYPLANNED? ACTION OWNER
West NGTS TSG Albuquerque 99.97 35.77 77
East NGTS LCOE California 99.25 17.9 60 AT&T circuit problem Circuit No Corrected
East NGTS TSG Columbus 99.97 12.21 38
Central NGTS SSG Fort Polk 100 0.26 21
East NGTS SSG Ft. Eustis 99.99 18.45 56
West NGTS SSG Ft. Irwin 100 46.11 102 No Response
Central NGTS TSG Grand Prairie 100 5.74 15
East NGTS LCOE Hagerstow 99.99 32.18 21
East NGTS TSHQ Herndon 99.99 8.41 45
East NGTS LCOE Indianapolis 99.95 18.17 47
Central NGTS LCOE Jacksonville 98.93 3.32 41 Unknown Unknown No Corrected
Central NGTS TSG Killeen 99.99 13.8 67
Central NGTS LCOE Lake Charles 100 57.1 17
West NGTS SSG Lakewood 100 19.8 76
West NGTS SSG Lakewood 100 43.75 96 No Response
East NGTS LCOE Lanham 99.99 2.18 10
West NGTS TSG Layton 98.73 48.98 108 Power Outage - Weather Power No Corrected
Central NGTS TSG Leavenworth 100 26.94 31
East NGTS LCOE Macon 99.82 6.65 40
East NGTS LCOE McGuire 100 1.76 53
East NGTS LCOE Middle River 99.66 33.8 33 Power Outage - Weather Power No Corrected
Central NGTS TSG Montgomery 100 7.07 36
East NGTS LCOE Norfolk 99.96 27.97 89 No Response
West NGTS LCOE Oak Harbor 100 12.41 72
East NGTS LCOE Oceana 99.78 12.08 52 Power Outage Power No Corrected
Central NGTS LCOE Oklahoma 99.99 42.06 14
East NGTS TSG Radcliff 100 30.67 70
West NGTS LCOE San Diego 99.99 33.31 72
West NGTS LCOE Sierra Vista 99.99 30.26 33
East NGTS TSG Suffolk 99.97 67.13 67
West NGTS LCOE Travis 99 5.15 56 Unknown Unknown No Corrected
East NGTS LCOE Warner Robins 100 63.1 50
East NGTS LCOE Warner Robins 100 51.69 31
East NGTS LCOE Warner Robins 100 31.75 61
East NGTS LCOE Warner Robins 99.68 69.22 52 Circuit Problem Circuit No Corrected
East NGTS LCOE White Marsh 99.99 12.13 16
![Page 8: The Road to Predictive Operations](https://reader033.vdocuments.us/reader033/viewer/2022060902/6298ef56146faa7e811e77cb/html5/thumbnails/8.jpg)
Effective Predictive Operations Define „Normal‟ First
![Page 9: The Road to Predictive Operations](https://reader033.vdocuments.us/reader033/viewer/2022060902/6298ef56146faa7e811e77cb/html5/thumbnails/9.jpg)
The Road to Predictive Operations
Observe and Learn before you buy any tools
Drive Simplicity & Transparency into your operations
Drive Standardization (This is KEY)
Search for Meaningful Metrics (we‟ll talk about that in a bit)
Remember, it‟s a Process – not a tool
1/3 Tool, 2/3 Prep (when it finally is time to look at a tool)
![Page 10: The Road to Predictive Operations](https://reader033.vdocuments.us/reader033/viewer/2022060902/6298ef56146faa7e811e77cb/html5/thumbnails/10.jpg)
Meaningful Metrics Answer Relevant Questions
Week Ending Week Ending Issue Resolution Status
1/8/2006 B 2/5/2006 B
1/15/2006 B 2/12/2006 B
1/22/2006 B 2/19/2006 Y New installation had logging set incorrectly
1/29/2006 B 2/26/2006 B
3/6/2006 B
3/13/2006 B
3/20/2006 B
3/27/2006 B
Legend
B 100%
G 95% to 99%
Y 85% to 94%
R Below 85%
After – “What types of tickets are there?”
Before – “Are we closing our tickets?”
![Page 11: The Road to Predictive Operations](https://reader033.vdocuments.us/reader033/viewer/2022060902/6298ef56146faa7e811e77cb/html5/thumbnails/11.jpg)
Meaningful Metrics Are Self-Evident
Before After
Equipment EOL
0
1000
2000
3000
4000
5000
6000
7000
Sep-06 Mar-07 Apr-07 May-07 Jun-07 Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07
Devices
OK EOSA EOS/EOSW EOCR EOL Other0
5
10
15
20
25
30
2007 2008 2009 2010 2011 2012
Number of Devices Reaching End of Life per Year (EOCR/EOL)
![Page 12: The Road to Predictive Operations](https://reader033.vdocuments.us/reader033/viewer/2022060902/6298ef56146faa7e811e77cb/html5/thumbnails/12.jpg)
Meaningful Metrics Are Actionable
Before After
0
50
100
150
200
250
300
350
400
Sep-07
Oct-07
Nov-07
Dec-07
Jan-08
Feb-08
Mar-08
Apr-08
May-08
Jun-08
Jul-08
Aug-08
Sep-08
Oct-08
Nov-08
Dec-08
Jan-09
Feb-09
Mar-09
Apr-09
May-09
Jun-09
Jul-09
Aug-09
Sep-09
<40 <80 <120 >120
![Page 13: The Road to Predictive Operations](https://reader033.vdocuments.us/reader033/viewer/2022060902/6298ef56146faa7e811e77cb/html5/thumbnails/13.jpg)
Meaningful Metrics Highlight Trends
Before After
![Page 14: The Road to Predictive Operations](https://reader033.vdocuments.us/reader033/viewer/2022060902/6298ef56146faa7e811e77cb/html5/thumbnails/14.jpg)
Our Tools
ITIL Service Framework Software
Request-to-Production Lifecycle management
Automated Network Change & Configuration Management
Integrated event management and automatic remediation of mis-configured elements
Network modeling prior to configuration changes
Network mapping linked to ITIL database
Performance analysis, near real-time trends/health data
Automating manual workflow processes
DNS, DHCP, IPAM
Firewall management & rule set modeling
Integrated governance and risk compliance
Correlate and analyze real-time streaming data from disparate and complex systems into a cohesive view
![Page 15: The Road to Predictive Operations](https://reader033.vdocuments.us/reader033/viewer/2022060902/6298ef56146faa7e811e77cb/html5/thumbnails/15.jpg)
Key Takeaways
Shift your thinking
It‟s not a tool problem
This is a process and will take time
1/3 tool, 2/3 prep
Standardization is key
Use meaningful metrics as a guide (and eventually to predict)
Events and thresholds need to be defined anyways, so do it early in the process
Don‟t get lost in the bells & whistles
Keep your focus – predict issues to avoid downtime
![Page 16: The Road to Predictive Operations](https://reader033.vdocuments.us/reader033/viewer/2022060902/6298ef56146faa7e811e77cb/html5/thumbnails/16.jpg)
Research Resources
PNL Site: http://predictiveanalytics.pnl.gov/about.stm
Gartner‟s PBS article link: http://www.gartner.com/technology/research/reports/pattern-based-strategy.jsp
SPC example: http://www.infinityqs.com/espc.html
Ionix Datasheet: http://www.emc.com/collateral/software/data-sheet/h5743-it-perf-report-ds.pdf
Splunk Site: http://www.splunk.com/?r=header
Opnet link: http://www.opnet.com/solutions/application_performance/riverbed.html
Article on Predictive Ops: http://www.thefreelibrary.com/Bright+future+for+predictive+network+management.(Database+&+Network...-a0107928301
![Page 17: The Road to Predictive Operations](https://reader033.vdocuments.us/reader033/viewer/2022060902/6298ef56146faa7e811e77cb/html5/thumbnails/17.jpg)
Thank You
Brandon Porco
Network Operations Manager
www.NorthropGrumman.com