Page 1: THE RIP Road Map

RECOMMEND

Part I

Presentation of the RIP Roadmap

by Partners: AT, PL, CZ & SI

24th Oct. 2013, 4th WS in Poland

24th Oct 2013

Page 2: THE RIP Road Map

THE RIP Road Map

• General information about the RIP: Each partner will create an individual RIP for his region The RIP will consist of 2 independent parts

• Roadmap for the RIP- • Regional Implementation Plan -

The Roadmap focuses on the WHY a special good practice or new idea was chosen and WHO and HOW it will be implemented within the partner region

Target of the Road Map presentation at the WS 4:

informing the partners about• your selected action for the RIP

• the reasons / back ground info for your selection

• Which stakeholders will implement your RIP

24th Oct 2013 2

Page 3: THE RIP Road Map

RECOMMEND RIP Road Map

Lower AustriaBenjamin Kuscher

24th Oct 2013

Toruń / PL

24th Oct 2013

Page 4: THE RIP Road Map

Overview: now - then

4

Short description about your challanges which hinder respectively make the implementation of eco friendly actions difficult:

*) xxxxx*) xxxxx*) xxxxx*) xxxxx*) xxxxx

our solution

A common search tool (My eco-expert) will be used to strengthen transparency regarding

- qualification,- experience, - competence and - licensees of all consultants

The target is to light out the funding jungle

Our current situation• Each eco-funding scheme in Lower Austria manages its own pool of experts (often the same persons) and wants to keep control. • There is a lack of cooperation between the eco-funding institutions.• There are already existing search tools but with specific needs for specific institutions – • The tools are used only by one organisation.• Finding the appropriate external eco-expert or eco-funding scheme is not easy enough

Our proposal

24th Oct 2013

Page 5: THE RIP Road Map

New plan for My ECO-Expert

524th Oct 2013

Ökomanagement NÖ

Environmental Consulting by Chamber of Commerce

eNuKlimabündnis

UmweltberatungEnergieberatung

RECOMMEND Pilot

My ECO-expert

ClientsCompanies Public Org.

RECOMMEND RIP

Page 6: THE RIP Road Map

More info about your planned action

6

My eco-expert Key words as answers are enough….

What is it about A common search tool for eco-experts of all consultancy programmes in the region. (My eco-expert)

What do you expect to achieve?

• Easier access to expertise• More funding cases• More transperancy on the quality of the consultancy• Improve the cooperation of ALL initiatives supporting eco-

management and eco-innovation in Lower Austria• Improve the transparency and service for the clients

Indicators you expect to achieve?

• Higher number of funded projects• Better image of the funding institutions• More and better cooperation between funding organisations• Increasing quality of the external experts and funded projects via

transparency (feedback, evaluation, reports)

Has someone already tested the practice / idea? If yes, who & where & when?

The idea is new to most funding organisations – only one organisation is using a search tool. The technique is not new, but the trans-organisational use of a search tool is unique

Is it easy to implement? Please explain why or why not

The technique and data are available. It just depends on the cooperational will of the stakeholders. This will should be guaranteed by the RIP.

24th Oct 2013

Page 7: THE RIP Road Map

My stakeholders

724th Oct 2013

Stakeholder A Barbara NährerRegional Government Department of environmental and energy economics Programme Manager Ökomanagement

Main fields of activities of stakeholder organisation 

 *) “Ökomanagement Niederösterreich” (regional Government)Environmental consulting support for public and private organisations.

Priorities and interests of stakeholder in relation to the selected good practice/idea.

 *) Creating a one-stop-shop for eco-management funding projects in Lower AustriaHigher quality of external experts and funding projectsHigher cooperation between the institutions

Risk & chance of this stakeholder to support or to hinder my RIP

 *) No risk. They will support the RIP. However due to a restructuring process within the reg. gov. there is a uncertainty how the funding scheme will be organised in the future.

STAKEHOLDER A

Page 8: THE RIP Road Map

My stakeholders

824th Oct 2013

STAKEHOLDER B

Stakeholder B Energie und Umweltagentur NÖ eNuEnergy Agency Lower AustriaHubert FragnerHead department for communities

Main fields of activities of stakeholder organisation 

 *) Environmental consulting support for public organisations

Priorities and interests of stakeholder in relation to the selected good practice/idea.

 *) Creating a one-stop-shop for eco-management funding projects in Lower AustriaHigher cooperation between the institutions

Risk & chance of this stakeholder to support or to hinder my RIP

 *) They support the cooperation, but do not see so much need that the expert needs to be selected by the client. They still prefer to assign an expert. But this is according to competition regulations not possible anymore. So we are sure to convince them.

Page 9: THE RIP Road Map

My stakeholders

924th Oct 2013

STAKEHOLDER C

Stakeholder C Lower Austrian Regional government,Office Department of economy, tourism and technologyDoris MayerResponsible for sustainability programmes

Main fields of activities of stakeholder organisation 

 *) This department is responsible for all economic funding schemes.The ecological funding schemes for companies are therefore a crosscutting issue which will need to be addressed by both departments.

Priorities and interests of stakeholder in relation to the selected good practice/idea.

 *) Creating a one-stop-shop for eco-management funding projects in Lower Austria

Risk & chance of this stakeholder to support or to hinder my RIP

 *) This department will support the RIP, however they are also responsible for the restructuring of Ökomanagement NÖ.

Page 10: THE RIP Road Map

Realisation of My eco-Expert

10

Ökomanagement supports the transperant

selection of experts

Eco-experts will support the creation of one singe

search tool.

The federal gov. supports clear and transperant criteria for

eco-experts

Eco-experts will fear the additional work in providing the requested information.

Opposition in the own department because they want to keep controle of

their expert pool.

Yellow circles: supportRed circles: obstacles

Please state in key words which main support and main obstacles /threats/ difficulties you are expecting to face when establishing the RIP in your region.

Chamber of commerce will see it as competition

24th Oct 2013

Page 11: THE RIP Road Map

Promotion possibilities for RIP

1124th Oct 2013

HOW the RIP & his supporters can be promoted

 

On regional level • Promotion in newsletters • Promotion at events in Lower Austria and Vienna• RIP will be presented jointly with other regional RIPs

On national level

 • Promotion in newsletters• Promotion at project meetings with the Austrian sustainability officers

(Austrian provinces)On international level

• Promotion at international meetings (best practice)

Any idea how you resp. the RECOMMEND team can promote the Final RIP on regional / national and / or international level?e.g. signing the RIP at press conference, round table with stakeholders, press release, promoting at international events suchas Open Days…)

Page 12: THE RIP Road Map

TO DO List for the next months

1224th Oct 2013

MONTH 2013 TO DOs Who

September Introduction of the idea at selected incubators 

Barbara Nährer and partners

October RIP presented at Working Summit.  

Barbara Nährer and partners

November Preparation base conceptDraft search criteria for eco-experts

Barbara Nährer and partners

December Discussion with selected consultants/external expertsFinal definition of search criteria for eco-experts

Barbara Nährer and partners

MONTH 2014 TO DOs Who

January system specification for the platform/database in cooperation with the contractor

Barbara Nährer and partners

February Implementation of the platform (local contractor)test version of My eco-expert

Barbara Nährer and partners

March Implementation of the platform (local contractor)Collection of expert data

Barbara Nährer and partners

April Implementation of the platform (local contractor)Input of expert data

Barbara Nährer and partners

Page 13: THE RIP Road Map

RECOMMEND RIP Road Map

Kujawsko-Pomorskie VoivodeshipRafał Modrzewski

24th Oct 2013

Torun / PL

24th Oct 2013

Page 14: THE RIP Road Map

Overview: now - then

14

Short description about your challanges which hinder respectively make the implementation of eco friendly actions difficult:

*) xxxxx*) xxxxx*) xxxxx*) xxxxx*) xxxxx

our solution

Establishing new innovation voucher scheme

Establishing instruments of support for clusters development

Our current situation

Innovation voucher scheme - regional R&D sector not used efficiently

Low level of cooperation between R&D sector and companies

Lack of instruments of support for clusters development (ecoclusters)

Our proposal

24th Oct 2013

Page 15: THE RIP Road Map

More info about your planned action

15

Name / Key Words of your selected action you want to implement

Key words as answers are enough….

What is it about Innovation voucher scheme / instruments of clasters’ support

What do you expect to achieve? Use of regional R&D sector / creation of new clasters

Indicators you expect to achieve? Number of companies supported in the scope of research’s effects implementation/ Number of clusters supported,

Has someone already tested the practice / idea? If yes, who & where & when?

Voucher scheme – South Moravian Innovation Centre/ Clusters - Peterborough EnviroCluster, UK; Green Tech Valey, Austria

Is it easy to implement? Please explain why or why not

Voucher scheme – easy to implement – experience from implementation of simmilar scheme;Clusters – difficulties caused by entrepreneurs’ attitude

24th Oct 2013

Page 16: THE RIP Road Map

My stakeholders

1624th Oct 2013

Stakeholder A please state his / her name, name of organisation, his / her function *) Marshal’s Office of Kujawsko-Pomorskie Voivodeship*) Agnieszka Jóźwiak

*) Department of EU Funds and Projects Management

Main fields of activities of stakeholder organisation 

 Regional Operational Programme Management

Cooperation with Business Support Institutions

Priorities and interests of stakeholder in relation to the selected good practice/idea.

 Including good practise solutions into New ROP programming period

Risk & chance of this stakeholder to support or to hinder my RIP

chance – better effects of future ROP implementation

risk - EU legal obstacles, political will

STAKEHOLDER A

Page 17: THE RIP Road Map

My stakeholders

1724th Oct 2013

STAKEHOLDER B

Stakeholder B please state his / her name, name of organisation, his / her function Kujawsko-Pomorska Agency of InnovationMarta Dolecka

Main fields of activities of stakeholder organisation 

Support of innovation development in the region

Priorities and interests of stakeholder in relation to the selected good practice/idea.

 Implementation of new voucher scheme

Risk & chance of this stakeholder to support or to hinder my RIP

chance – tight cooperation with entrepreneurs – best knowledge about their needs

risk – EU legal obstacles

Page 18: THE RIP Road Map

My stakeholders

1824th Oct 2013

STAKEHOLDER C

Stakeholder C please state his / her name, name of organisation, his / her function / Toruń Regional Development AgencyPiotr Józefiak

Main fields of activities of stakeholder organisation 

Support for enterepreneurship development (technological parks, business incubators)

Priorities and interests of stakeholder in relation to the selected good practice/idea.

 Implementation of clusters’ instruments of support

Risk & chance of this stakeholder to support or to hinder my RIP

 chance - great knowledge and experience in cooperation with entrepreneurs

risk – entrepreneurs negative attitude

Page 19: THE RIP Road Map

Realisation of RIP

19

R&D potential

Engaged business support

institutions

Regional Operational Programme resources

Entrepreneurs’ mentality

Political changes

Yellow circles: supportRed circles: obstacles

Please state in key words which main support and main obstacles /threats/ difficulties you are expecting to face when establishing the RIP in your region.

EU legal obstacles

24th Oct 2013

Page 20: THE RIP Road Map

Promotion possibilities for RIP

2024th Oct 2013

HOW the RIP & his supporters can be promoted

 

On regional level  -Opening of public consultations of the Kujawsko-Pomorskie Regional Operational Program 2014-

2020;- Workshop with Mr. Jindrich Weiss from South Moravian Innovation Centre who is a manager of the Innovation Vouchers Project.

On national level

  

On international level  

Any idea how you resp. the RECOMMEND team can promote the Final RIP on regional / national and / or international level?e.g. signing the RIP at press conference, round table with stakeholders, press release, promoting at international events suchas Open Days…)

Page 21: THE RIP Road Map

TO DO List for the next months

2124th Oct 2013

MONTH 2013 TO DOs Who

October   

 

November   ROP consultations,workshop with Mr. Jindrih Weiss from South Moravian Innovation Centre about voucher scheme,

 Marshal’s office of Kujawsko-Pomorskie Region, Kujawsko-Pomorska Agency of Innovation, R&D institutions from the region

December   Study visit in Green Tech Valey

 Marshal’s Office of Kujawsko-Pomorskie Region, Toruń Regional Development Agency, regional clusters‘ coordinators

MONTH 2014    

January   

 

February   

 

March   

 

April   

 

May   

 

June   Final approval of RIP and ist connections to ROP for 2014-2020

 Marshal’s Office of Kujawsko-Pomorskie Region

July   

 

August   

 

Page 22: THE RIP Road Map

RECOMMEND WS4 Poland

RIP Roadmap - Czech RepublicPP4 – Jan Jareš, Ekoport

24th Oct 2013

Page 23: THE RIP Road Map

Road Map CZ – South Bohemia

• based on ongoing PA – pilot innovation vouchers scheme• in relation to local pre-conditions of the region• low level of awareness on eco-innovation/eco-management• lesson learnt from other regions / best practice

24th Oct 2013 23

Page 24: THE RIP Road Map

Overview: now - then

24

Short description about your challanges which hinder respectively make the implementation of eco friendly actions difficult:

*) xxxxx*) xxxxx*) xxxxx*) xxxxx*) xxxxx

our solution

Pilot innovation voucher scheme (broad preferences)

Verification, feed back collection, raising awareness on +‘s of the tool

Scheme adjustment – „eco“ aspect (preference x special call)

Our current situation

No eco-innovation / management tool in the region

Low level of cooperation between R&D and local industry

Other regions have lead

No awareness among politicians

Our proposal

24th Oct 2013

Page 25: THE RIP Road Map

Planned action info

25

Name / Key Words of your selected action you want to implement

Key words as answers are enough….

What is it about Implementing of pilot (eco) innovation vouchers scheme

What do you expect to achieve? Functional and succesful eco-innovation tool

Indicators you expect to achieve? At least 1 mil. CZK / per year allocated for the scheme

Has someone already tested the practice / idea? If yes, who & where & when?

9 out of 14 regions in the CZ have succesfully implemented this kind of scheme

Is it easy to implement? Please explain why or why not

To achieve „eco“ innovation voucher scheme is „step by step“ approach

24th Oct 2013

Page 26: THE RIP Road Map

My stakeholders

2624th Oct 2013

Stakeholder A Regional Authority of South Bohemia Luboš Průchahead of division responsible for regional development, spatial planning, construction and investments at Regional Authority of South Bohemia

Main fields of activities of stakeholder organisation 

 Regional Authority of South Bohemia

Priorities and interests of stakeholder in relation to the selected good practice/idea.

implementation of the schemeadministration of the schemeadjustments / modifications

Risk & chance of this stakeholder to support or to hinder my RIP

Thanks to the RECOMMEND activitiy – importance of implementation this scheme as one of the last region in the Czech Republic has been pointed out. Regional Authority (leading members of the board) gave “green light” to the action.

STAKEHOLDER A

Page 27: THE RIP Road Map

My stakeholders

2724th Oct 2013

STAKEHOLDER B

Stakeholder B South Bohemian Agency for Support to Innnovative Entrepreneurship (JAIP) Petra Vachová, chairman

Main fields of activities of stakeholder organisation

Main organisation in the region focused on facilitation and intermediation of cooperation between R&D and industry.

Priorities and interests of stakeholder in relation to the selected good practice/idea.

feedback collection contribution to proposal for scheme adjustment facilitation of virtual communication platform

Risk & chance of this stakeholder to support or to hinder my RIP

JAiP has been active in initiating of such scheme for a long time so we have full support from them. Moreover JAiP is taking over major part of our Pilot action as external contractor.

Page 28: THE RIP Road Map

My stakeholders

2824th Oct 2013

STAKEHOLDER C

Stakeholder C South Bohemian University and Academy Technology Transfer Centre (JCTT) Růžena Štemberková

Main fields of activities of stakeholder organisation 

technology transfer servicesfacilitator of cooperation between R&D and industry

Priorities and interests of stakeholder in relation to the selected good practice/idea.

main communication channel and interface for the most significant R&D capacity in the regionsetting up formal cooperation within the scheme

Risk & chance of this stakeholder to support or to hinder my RIP

more or less supportive stakeholder implementation of the scheme will comply JCTT’s services for industry seeking for cooperation with R&D capacities

Page 29: THE RIP Road Map

Realisation of RIP

29

step by step approach

best practice / external experts

simplicity and transferability of the

tool

applicability of local R&D

capacities towards industry

perception of „eco“ in CZ

Yellow circles: supportRed circles: obstacles

low level of awareness

24th Oct 2013

Page 30: THE RIP Road Map

Promotion possibilities for RIP

3024th Oct 2013

HOW the RIP & his supporters can be promoted

 

On regional levelThrough release of communication materials such as leaflets / press conference / workshop.

On national level

 Dedicated website for the scheme and presentation within newly established communication platform for innovation vouchers managers.

On international level

Through official communication channels with RECOMMEND project and possibly localisation of the website to English version.

Any idea how you resp. the RECOMMEND team can promote the Final RIP on regional / national and / or international level?e.g. signing the RIP at press conference, round table with stakeholders, press release, promoting at international events suchas Open Days…)

Page 31: THE RIP Road Map

TO DO List for the next months

3124th Oct 2013

MONTH 2013 TO DOs Who

October Preparation of innovation voucher scheme (monitoring and selection of relevant R&D capacities)

contractor + Ekoport

November Preparation of innovation voucher scheme (communication and agreements preparation with relevant R&D capacities)

contractor + Ekoport

DecemberPreparation of innovation voucher scheme (elaboratin scheme documentation, legal analysis, regional authority negotiation)

contractor + Ekoport

MONTH 2014    

January Preparation of innovation voucher scheme (elaboratin scheme documentation, legal analysis, regional authority negotiation)

contractor + Ekoport

FebruaryFirst call preparation + follow up campaign contractor + Ekoport

MarchFollow-up campaign launch (website, leaflets, etc.) contractor + Ekoport

AprilStakeholders involvement / feedback / adaption Ekoport

MayProposal for possible modifications Ekoport

June„eco“ aspect proposal elaboration Ekoport

July„eco“ aspect proposal negotiation Ekoport

August2nd call preparation with „eco“ aspect integration Ekoport

Page 32: THE RIP Road Map

RECOMMEND RIP Road MapLEA Spodnje Podravje

Uroš Majerič

24th Oct 2013Torun / PL

24th Oct 2013

Page 33: THE RIP Road Map

Overview: now - then

33

Short description about your challanges which hinder respectively make the implementation of eco friendly actions difficult:

*) xxxxx*) xxxxx*) xxxxx*) xxxxx*) xxxxx

- Lack of networking- Lack of eco innovation - Lack of funding systems- Lack of R&D Projects- Great interest for implementation in renewable energy sources and increase of energy efficiency

our solution

-Establishment of the cluster-Proposal of efficient funding system for our situation -Connection with different organizations -Establishment of meetings on a regular basis

Our current situation Our proposal

24th Oct 2013

Page 34: THE RIP Road Map

More info about your planned action

34

Name / Key Words of your selected action you want to implement

Key words as answers are enough….

What is it about Eco Bionics Cluster

What do you expect to achieve? Network of partners, Program groups, Events, Shared Services,..

Indicators you expect to achieve? Number of partners, innovations, events,..

Has someone already tested the practice / idea? If yes, who & where & when?

New idea

Is it easy to implement? Please explain why or why not

No, it’s a new idea.

24th Oct 2013

Page 35: THE RIP Road Map

My stakeholders

3524th Oct 2013

Stakeholder A please state his / her name, name of organisation, his / her function College of Bionics PtujMsc. Darja Harb

Headmaster

Main fields of activities of stakeholder organisation 

- educational centre

Priorities and interests of stakeholder in relation to the selected good practice/idea.

 - research and development in the field of eco bionics

Risk & chance of this stakeholder to support or to hinder my RIP - high chance to support because their area of expertise

STAKEHOLDER A

Page 36: THE RIP Road Map

My stakeholders

3624th Oct 2013

STAKEHOLDER B

Stakeholder B please state his / her name, name of organisation, his / her function International institute for energy bionicsAnja Kostevšek

Director

Main fields of activities of stakeholder organisation 

 

- Development of novel technologies, approaches, methodologies, services and products in the field of environmental and energy bionics

Priorities and interests of stakeholder in relation to the selected good practice/idea.

 - Research in the field of eco innovation and bionics

Risk & chance of this stakeholder to support or to hinder my RIP - High chance because there is no group connection established

Page 37: THE RIP Road Map

My stakeholders

3724th Oct 2013

STAKEHOLDER C

Stakeholder C please state his / her name, name of organisation, his / her function / Local Businesses

Main fields of activities of stakeholder organisation 

- Supply chain for request and demand

Priorities and interests of stakeholder in relation to the selected good practice/idea.

 - Being eco frendly, inovative, using new technology and products, establishment of new buissnes connections

Risk & chance of this stakeholder to support or to hinder my RIP

Page 38: THE RIP Road Map

Realisation of RIP

38

new connections with different organizations

support by national policies

lack of financial funds

Yellow circles: supportRed circles: obstacles

Please state in key words which main support and main obstacles /threats/ difficulties you are expecting to face when establishing the RIP in your region.

not enough support

24th Oct 2013

Page 39: THE RIP Road Map

Promotion possibilities for RIP

3924th Oct 2013

HOW the RIP & his supporters can be promoted

 

On regional level  - Press releases, seminars for stakeholders, information dissemination through WEB pages, articles etc.

On national level

  - Press releases, signing the RIP at press conference with the Minister

On international level  - Promoting at international events, on different scientific and technical fairs, in papers and journals

Any idea how you resp. the RECOMMEND team can promote the Final RIP on regional / national and / or international level?e.g. signing the RIP at press conference, round table with stakeholders, press release, promoting at international events suchas Open Days…)

Page 40: THE RIP Road Map

TO DO List for the next months

4024th Oct 2013

MONTH 2013 TO DOs Who

October  - Cluster organization plan - LEA Spodnje Podravje, External experts

November - Cluster organization plan  - LEA Spodnje Podravje, External experts

December  - Cluster organization plan  - LEA Spodnje Podravje, External experts

MONTH 2014    

January  - Cluster organization plan - LEA Spodnje Podravje, External experts

February  - RIP Preparation - LEA Spodnje Podravje, External experts

March - RIP Preparation - LEA Spodnje Podravje, External experts 

April - RIP Preparation  - LEA Spodnje Podravje, External experts

May  - RIP Preparation  - LEA Spodnje Podravje

June   - RIP Preparation

 

 - LEA Spodnje Podravje

July  - RIP Preparation  - LEA Spodnje Podravje

August  - Finalization of the RIP  - LEA Spodnje Podravje, External experts

Page 41: THE RIP Road Map