The Replanting of Lochaber Hydro Power Station. by Andrew Thick. E V E N T S P O N S O R S. Topics to be covered today. Scheme modelling; Operating capability of Lochaber; Turbine Selection; Penstock works. Schematic of the Lochaber Scheme. Gravity Inflows. Surge Chamber. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: The Replanting of Lochaber Hydro Power Station

1

The Replanting of Lochaber Hydro Power Station

by Andrew Thick

Page 2: The Replanting of Lochaber Hydro Power Station

E V E N T S P O N S O R S

Page 3: The Replanting of Lochaber Hydro Power Station

3

Topics to be covered today

• Scheme modelling;• Operating capability of Lochaber;• Turbine Selection;• Penstock works.

Page 4: The Replanting of Lochaber Hydro Power Station

4

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows Gravity

Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 5: The Replanting of Lochaber Hydro Power Station

5

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows Gravity

Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 6: The Replanting of Lochaber Hydro Power Station

6

Page 7: The Replanting of Lochaber Hydro Power Station

7

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows Gravity

Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 8: The Replanting of Lochaber Hydro Power Station

8

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows Gravity

Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 9: The Replanting of Lochaber Hydro Power Station

9

Page 10: The Replanting of Lochaber Hydro Power Station

10

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows Gravity

Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 11: The Replanting of Lochaber Hydro Power Station

11

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows Gravity

Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 12: The Replanting of Lochaber Hydro Power Station

12

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows Gravity

Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 13: The Replanting of Lochaber Hydro Power Station

13

Page 14: The Replanting of Lochaber Hydro Power Station

14

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows Gravity

Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 15: The Replanting of Lochaber Hydro Power Station

15

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows Gravity

Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 16: The Replanting of Lochaber Hydro Power Station

16

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows Gravity

Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 17: The Replanting of Lochaber Hydro Power Station

17

Page 18: The Replanting of Lochaber Hydro Power Station

18

Simplified Lochaber Scheme Model

QTspill

QP/H

QTin

Laggan

QTin

QTunnel

Treig

QLspillQLin

QLin

QLin

Qintakes

Qintakes

Page 19: The Replanting of Lochaber Hydro Power Station

19

Energy Modelling Results

Trial 1 2 3 4 5 6 7

Installed Cap. (MW) 65 80 60 70 80 90 100

Overall Efficiency (%) 75 87 87 87 87 87 87

Headloss Coeff. (k) 0.021 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172

Operating rule Ext Ext Max E Max E Max E Max E Max E

Laggan Spill (mcm) 2,034 1,794 4,160 1,709 1,227 1,074 801

Treig Spill (mcm) 154 121 857 201 54 10 7

Ave. Energy (GWh/yr) 467 569 523 574 581 583 580

Page 20: The Replanting of Lochaber Hydro Power Station

20

Scheme Operating Capability Diagram

9.3 % Q90.7 % QAverage Operation

0 % Q100 % QNo Gravity Inflows

100 % Q0 % QMax. Gravity Inflows

Page 21: The Replanting of Lochaber Hydro Power Station

21

Turbine Selection

The steps towards to turbine selection were:• Analysis of historical data of scheme operation• The number of generating units was selected – 5• Analysis of operating data from scheme model• Performance data from tendering suppliers was fed into the scheme model

Page 22: The Replanting of Lochaber Hydro Power Station

22

Penstock works

Key aspects of the penstock works were:• Need to undertake the works minimising shutdown of generation.• Existing penstock system was very complex.• In order to maintain double isolation, the penstocks needed to be dewatered sequentially.• The works were complex with poor access. • Decision with RTA to laser scan the penstock system and create a 3-D model.

Page 23: The Replanting of Lochaber Hydro Power Station

23

Page 24: The Replanting of Lochaber Hydro Power Station

24

Page 25: The Replanting of Lochaber Hydro Power Station

25

Penstock works

Key aspects of the penstock works were:• Need to undertake the works minimising shutdown of generation.• Existing penstock system was very complex.• In order to maintain double isolation for the penstocks needed to be dewatered sequentially.• The works were complex with poor access. • Decision with RTA to laser scan the penstock system and create a 3-D model.

Page 26: The Replanting of Lochaber Hydro Power Station

26

Page 27: The Replanting of Lochaber Hydro Power Station

27

Page 28: The Replanting of Lochaber Hydro Power Station

28

Project Summary

• The generating plant has been replaced to give 25+ years life extension.

• The water to wire efficiency has been improved from 75% to 90+%.

• Energy production increased from 460 GWh/yr to 600+ GWh/yr.

• The scheme’s capability is better understood and limitations identified.

• The scheme was completed ahead of schedule and is operating successfully with minimal disruption to Smelter operations during construction

Page 29: The Replanting of Lochaber Hydro Power Station

Contact Details

Andrew Thick BEng CEng MIMechEURS Infrastructure and Environment UK LimitedInternational House, Dover PlaceAshfordKent TN23 1HUUnited KingdomTel: +44 (0) 1233 [email protected]

Thank you for your kind attention