the public transport parking problems in the central ...ijeam.com/published paper/volume 43/issue...
TRANSCRIPT
International Journal of Engineering, Applied and Management Sciences Paradigms, Vol. 43, Issue 01
Publishing Month: January 2017
An Indexed and Referred Journal
ISSN (Online): 2320-6608
www.ijeam.com
IJEAM
www.ijeam.com 64
The Public Transport Parking Problems in the Central
Station in Khartoum North, the Republic of Sudan
Mysoon Sulieman Ibrahim1, Mahasin Abdullgader Eisa2 and Dr. Abdalla Babikir Abdelnabi3
1,2Faculty of higher studies, Slzaiem Alazhary University, Sudan
3Faculty of Urban Science, Slzaiem Alazhary University, Sudan
Publishing Date: January 24, 2017
Abstract The architectural and urban development leads to the emergence
of many problems the outstanding ones are linked with urban
transport and deserve mentioning in the traffic congestion. This
paper shows the stand on public transport parking problems
necessity of Central station parking by studying and analyzing
the current situation. To extract indicators that will help to put a
logical solutions whether are timely (short-term) and cheap, or
touches the future, long term and expensive. The paper also
found asset of recommendation that help to solve the problems
of public transport.
Keywords: Public Parking, Public Car, Longitude,
Latitude, GPS.
1. Introduction
Central station parking is the most important leg of the
position of public transport parking that linking
Khartoum North with the local area, But he became
suffers from many problems recently because of the
many changes have accompanied the general urban area,
Because of the sensitivity of the topic it had to be
addressed to it by this paper, (See Satellite Image number
(2), which describes the boundaries of the study area).
Satellite Image No. (1) shows the General Location
Aerial Photograph No. 2 shows the Boundaries of
the Study Area
2. The Problem of the Study
Lack of organize and direct the cars in the entry
and exit to and from the parking.
Weakness in the efficiency and sufficiency of the
parking, functionally and artistically.
So many cars and parking is tight and crowded
with slums and peddlers.
3. Methods and Means
We use the descriptive analytical method with assistance,
the case study method, the previous studies , field surveys
- with a number of programmes - like (Auto cad, Gis,
Google earth) , and also was used the computer programs
as « acces, word, exel, power point ».
International Journal of Engineering, Applied and Management Sciences Paradigms, Vol. 43, Issue 01
Publishing Month: January 2017
An Indexed and Referred Journal
ISSN (Online): 2320-6608
www.ijeam.com
IJEAM
www.ijeam.com
65
4. Results
After studying and analyzing of traffic in the area of
study we reached that following results :
4.1 Firstly, the Cars into the Parking:
Libya's parking: dedicated to it one track and the
number of cars 40 cars (buses), serving Khartoum North
and Omdurman area.
Kalakla’s parking , dedicated to it only one track ,
and the number of cars 150 cars (medium salons),
and linking the study area in Khartoum.
Shaabi Omdurman parking: dedicated to it a three
tracks, and the number of cars 120 vehicles (buses)
which serves Khartoum North and Omdurman area.
Meena barri parking: dedicated to it one track only,
and the number of cars 160 car (bus + medium
salons) that serves Khartoum Bahri - Khartoum.
Thawra’s parking: dedicated to it a one track, and
the number of cars 45 car (buses) and serves the area
of Khartoum North and Omdurman.
Shuhada’s parking: Dedicated to it one track, and
the number of cars 90 car (buses) which serves
Khartoum North and Omdurman area.
Shambat’s parking: It includes two destinations
(North and South) and dedicated to it a track, and the
number of cars 80 car (buses) and
serveembankments Khartoum North.
Sabrin parking: dedicated to it one track only, and
the number of cars 80 cars (buses) which serves
Khartoum North and Omdurman area.
Samrap’s parking: It includes two destinations
(East and North) and Dedicated to it a three tracks,
and the number of cars 35 car (buses + medium
salons) and serves Khartoum Bahri.
Hiy Alrawda’s parking: dedicated to it only one
track, and the number of cars 13 cars (medium
salons) which serves Khartoum Bahri.
Tayba alahamda’s parking: dedicated it t tow
racks, and the number of cars 80 car (buses) which
serves Khartoum Bahri.
Haj Yosif’s parking: dedicated to it six lines,
operated by 200 cars (buses + large buses + salons
medium) which connects Khartoum North East of
the Nile.
Jereef shreg’s parking: And dedicated to it only
one track, and the number of cars 50 car (buses)
which serves the east of the Nile.
4.2 Secondly, fics of roads (types - the width of
the states - services and the out standing
problems):
o Baladia street: high street ,Two-way, with four
tracks of the movement (width 24 meters), Separated
by a median embankment (width 2 meters), towards
the east-west , it has lighting, trees , ditches and
private parking , light is far 5 meters from the
asphalt road - no embankments - it's technical status
is good .
o Mazad Street: a secondary road (two directions) -
its four tracks of the movement (width 12 meters per
two tracks)-embankment (width 2 meters) - And has
lighting, trees , ditches - light is far 4 meters from the
asphalt road - Construction status is not bad.
o Kasala street: a secondary road (two directions) - Its
four tracks of the movement(width 12 meters) - it
has lighting, trees and ditches - light is far 4 meters
from the asphalt road – no private parking – no
embankments - It is the main entrance next to the car
from the east of the Nile to the study’s area - it's
technical state is low .
o Maona street : : high street ,Two-way, with four
tracks of the movement (width 24 meters), it has
electricity, lighting, embankments and ditches-light
is far 4 meters from the asphalt road-Construction
status is good- its The main entrance for those
coming from the North and Omdurman to the study
area.
o Alsaid Ali Almergani street : It is also high street -
Two-way, with four tracks of the movement (width
24 meters) - it has electricity, lighting,
embankments,trees and ditches - its The main
entrance for those coming from the Shaabi
Omdurman to the study area - - it's technical state is
good .
And The next aerial photograph No. 3 shows the streets
and parking of the study area).
Aerial Photograph No. 3 shows the Streets and
Parking of the Study Area
International Journal of Engineering, Applied and Management Sciences Paradigms, Vol. 43, Issue 01
Publishing Month: January 2017
An Indexed and Referred Journal
ISSN (Online): 2320-6608
www.ijeam.com
IJEAM
www.ijeam.com
66
5. The Problems if Study :
No smooth flow of movement.
Visual pollution.
The streets and parking in the area of study Suffering
from the narrowness , thats due to the human activity
And also Peddlers and stalls at random.
Lack of (urban design) elements in study area Such
as (seating areas, umbrellas, landscaping, modern
lighting, etc ...).
The size and number of cars unsuitable with the
space and the size of the parking.
Unavailability of private parking.
Cars stopped incorrectly, especially on a side of
Maona Street exacerbating the traffic problem.
6. Discussion
After discussing problems of the preview study, we
reached at logical solutions :
6.1 Now - Future "Recent solutions are easy in
execution - simple - not costive:
remove stalls and adjust the peddlers in the study
area.
providing private parking in front of the institutions
and shops and on the sides of roads in the study area.
direct Haj Yousif and Jeref cars in to the East
instead of the West, to reduce congestion.
providing (light panel) contain a minimum of
information (No. parking, the lines that serves
parking, etc.) , So that the light panel rising from the
embankments level (2.50 m) width (45 cm) and
length (65 cm).
paving pedestrian entrances and exits, and identify
their direction and painting lines on the floor of the
situation periodically.
provide services in the study areaespecially the
Office of cars lines (Trahin), That the responsibility
of the office is a management and controling acar
traffic at the entry and exit of the study area, In
addition to supervision of the maintenance of the
parking and providing requirements needed to run it
best.
6.2 In case that these solutions are not efficient
we think in the complicated solutions that need
constructions treatment that contain :
o design parking similar system of longitudinal parking
of heavy weights , Entrance and exit of the parking
(width 12 meters) - The path specified for the
direction of travel (width 4 meters). o divide the position to 7 trails, single track capacity of
10 large buses every half hour.
o Removal of the shops that require external display of
goods, and keep the ones that display goods within
the confines of the shop. o provision the elements of Urban Design (such as
seating areas, umbrellas, landscaping, lighting etc
...). And the following designs shows the proposal layout
parking cars.
Figure 1: The Planned after Development
6.3 The Internal Divisions of the Parking
shown in the Following Design
Figure 2: The Internal Divisions of the Parking
International Journal of Engineering, Applied and Management Sciences Paradigms, Vol. 43, Issue 01
Publishing Month: January 2017
An Indexed and Referred Journal
ISSN (Online): 2320-6608
www.ijeam.com
IJEAM
www.ijeam.com
67
Figure 3: The Parking and Footpaths
7. Recommandations
We also recommend to :
revision of the traffic by laws and analyzing the
weakness and strength in them to match with the
urban expansion.
development of the public transport to cope with the
modern application and the practical needs of the city
public transport has a big role to reduce traffic.
seperation of pedestrians and traffic movment to
achieve safety.
8. Conclusion
This short study conclude a number of solutions that
contribute activity in solving traffic problems, specially
The Public transport parking problems in the (Central
Station) – in kherthom North- the Republic of Sudan,
This leads to save effort and increase production.
References
[1] Working paper simple study in traffic at the 2 crosses
from Ebaid Khatim in the North Abdullah Babiker
acceptable for publication in journal of the faculty of
engineering , Nilian University 2015.
[2] Solution of traffic congestion along Wady street on
the area between the cross of Shuhada and
Omdurman emergency hospital round – Nasreldeen
Mustafa, Abdullah Babiker..and other, 2015.
[3] Working paper " solution of congestion in the tunnel
with Tabia street practical study,
[4] Abdullah Babiker and other accepted in the Scientific
magazine of the faculty of engineering, Nilian
University 2015.
[5] Reaseach for bachelor about transport problems in
Omdurman market mona mohammed adam and
others 2015
[6] Architectural planning Ministry. Khartoum state.
[7] Urban transport planning: Mahmood Himeidan/ sept.
2009.
[8] Guide to embankments design in high streets /
ministry of rural abd local affaris / Saudi Arabia
Kingdon / 1426h.
[9] Engineering transport and traffic / Mohamed Tawfeq
Ratio house university 1985.