The proposed plan of The proposed plan of work of the work of the « implementers « implementers consortium »: consortium »: objectives, methods, objectives, methods, expected outcomes, expected outcomes, timelines, partners timelines, partners Waranya Teokul (Thailand) and Salif Waranya Teokul (Thailand) and Salif Samaké (Mali) Samaké (Mali) Third expert consultation on positive synergies between health Third expert consultation on positive synergies between health systems and GHIs systems and GHIs WHO, 2-3 October 2008 WHO, 2-3 October 2008

Upload: anthony-bates

Post on 26-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The proposed plan of work of the « implementers consortium »: objectives, methods, expected outcomes, timelines, partners Waranya Teokul (Thailand) and

The proposed plan of The proposed plan of work of the work of the

« implementers « implementers consortium »: consortium »:

objectives, methods, objectives, methods, expected outcomes, expected outcomes, timelines, partnerstimelines, partnersWaranya Teokul (Thailand) and Salif Waranya Teokul (Thailand) and Salif

Samaké (Mali)Samaké (Mali)

Third expert consultation on positive synergies Third expert consultation on positive synergies between health systems and GHIsbetween health systems and GHIs

WHO, 2-3 October 2008WHO, 2-3 October 2008

Page 2: The proposed plan of work of the « implementers consortium »: objectives, methods, expected outcomes, timelines, partners Waranya Teokul (Thailand) and

19 avr. 2023 2Implementers consortium

Structure of presentationStructure of presentation

1.1. ObjectivesObjectives

2.2. MethodsMethods

3.3. Main activitiesMain activities

4.4. Expected outcomesExpected outcomes

5.5. TimelinesTimelines

6.6. Partners Partners

Page 3: The proposed plan of work of the « implementers consortium »: objectives, methods, expected outcomes, timelines, partners Waranya Teokul (Thailand) and

19 avr. 2023 3Implementers consortium

1. Objectives1. Objectives Mandate = provide Mandate = provide scientific, strategic and scientific, strategic and

technical advicetechnical advice to WHO and to the different to WHO and to the different consortia + development of consortia + development of recommendationsrecommendations

Specific terms of reference:Specific terms of reference: Act as a Act as a critical clearing-house for the work of the critical clearing-house for the work of the

academic and civil society consortiaacademic and civil society consortia, to ensure the , to ensure the quality and relevance of their outputs to the overall aims quality and relevance of their outputs to the overall aims of the Projectof the Project

Use the results of the evidenceUse the results of the evidence gathered by the gathered by the academic and civil society consortia to academic and civil society consortia to help WHO draft help WHO draft guidelines, formulate policy and implementguidelines, formulate policy and implement the the subsequent recommendationssubsequent recommendations

Act as Act as political mobilisers and advocatespolitical mobilisers and advocates & be a & be a ‘voice’ in different fora – major meetings, board meetings, ‘voice’ in different fora – major meetings, board meetings, etc. – to report on the “Positive Synergies” worketc. – to report on the “Positive Synergies” work

Page 4: The proposed plan of work of the « implementers consortium »: objectives, methods, expected outcomes, timelines, partners Waranya Teokul (Thailand) and

19 avr. 2023 4Implementers consortium

2. Methods2. Methods

VideoconferencesVideoconferences Regular meetings of experts subgroups + of Regular meetings of experts subgroups + of

the whole consortiumthe whole consortium Participation to other groups’ meetingsParticipation to other groups’ meetings Review of research protocols and evidenceReview of research protocols and evidence Inputs to and review of the draft guidelinesInputs to and review of the draft guidelines Participation to national and international Participation to national and international

forafora Support to the implementation of policy in Support to the implementation of policy in

countriescountries

Page 5: The proposed plan of work of the « implementers consortium »: objectives, methods, expected outcomes, timelines, partners Waranya Teokul (Thailand) and

19 avr. 2023 5Implementers consortium

3. Main activities3. Main activitiesA.A. Input to the other 2 consortia (Academic/CSO):Input to the other 2 consortia (Academic/CSO):

Look at the evidence produced by the other Look at the evidence produced by the other consortiaconsortia Provide Provide technical guidancetechnical guidance and feed-back and feed-back to the work of the other consortiato the work of the other consortia

To bring into consideration of the consortiums the To bring into consideration of the consortiums the challenges faced by countries (fragmented ongoing GHIs, challenges faced by countries (fragmented ongoing GHIs, etc.) etc.)

(Dedicated members of the consortium): (Dedicated members of the consortium): Participate in Participate in all the meetings of the Academic and civil society all the meetings of the Academic and civil society consortiaconsortia and report back to the Implementers’ and report back to the Implementers’ consortiumconsortium

(All members of the Consortium): (All members of the Consortium): Attend the regular Attend the regular stock-taking expert consultationsstock-taking expert consultations

Foster countries’ participation and leadershipFoster countries’ participation and leadership in the in the work of the other consortiawork of the other consortia

Page 6: The proposed plan of work of the « implementers consortium »: objectives, methods, expected outcomes, timelines, partners Waranya Teokul (Thailand) and

19 avr. 2023 6Implementers consortium

B.B. Technical Guidance:Technical Guidance:

Participation in the Participation in the Scientific Advisory Scientific Advisory Committee meetingsCommittee meetings

Consolidated opinion on the quality and Consolidated opinion on the quality and relevance of the evidencerelevance of the evidence to the aims of the to the aims of the ProjectProject

Participation in the Participation in the meetings of the WHO meetings of the WHO writing committee that will develop guidancewriting committee that will develop guidance on positive synergieson positive synergies

Organise (in collaboration with WHO) a Organise (in collaboration with WHO) a ministerial meeting to endorse WHO guidanceministerial meeting to endorse WHO guidance (prior to G8)(prior to G8)

Promote and guide the Promote and guide the implementation of policy implementation of policy and recommendationsand recommendations in countries in countries

Collaborate in the Collaborate in the early evaluation of the early evaluation of the policy’s implementationpolicy’s implementation

Page 7: The proposed plan of work of the « implementers consortium »: objectives, methods, expected outcomes, timelines, partners Waranya Teokul (Thailand) and

19 avr. 2023 7Implementers consortium

C.C. Advocacy:Advocacy:

Bring Positive Synergies work on to the Bring Positive Synergies work on to the agendaagenda of appropriate fora – including Member of appropriate fora – including Member State meetings, board meetings, and other high-State meetings, board meetings, and other high-level foralevel fora

Present the technical guidancePresent the technical guidance that results that results from the Project in appropriate forafrom the Project in appropriate fora

Act as advocates and political mobilisers for Act as advocates and political mobilisers for the “Positive Synergies” workthe “Positive Synergies” work, and obtain , and obtain consensus on the recommended strategies for consensus on the recommended strategies for maximizing positive synergies between health maximizing positive synergies between health systems and GHIssystems and GHIs

Page 8: The proposed plan of work of the « implementers consortium »: objectives, methods, expected outcomes, timelines, partners Waranya Teokul (Thailand) and

19 avr. 2023 8Implementers consortium

4. Expected outcomes4. Expected outcomes Research of the 2 other consortia is supervisedResearch of the 2 other consortia is supervised Evidence is validatedEvidence is validated Guidelines on positive synergies are fed by practice Guidelines on positive synergies are fed by practice

and developed with inputs from recipient countriesand developed with inputs from recipient countries A ministerial meeting to endorse WHO guidance is A ministerial meeting to endorse WHO guidance is

organisedorganised A consensus A consensus on maximising positive synergies is on maximising positive synergies is

advocatedadvocated Positive synergies policy and recommendations Positive synergies policy and recommendations

are:are: promoted in countries and in appropriate forapromoted in countries and in appropriate fora implemented in countriesimplemented in countries

Policy’s implementation is assessedPolicy’s implementation is assessed

Page 9: The proposed plan of work of the « implementers consortium »: objectives, methods, expected outcomes, timelines, partners Waranya Teokul (Thailand) and

19 avr. 2023 9Implementers consortium

5. Timelines5. Timelines

A. Input to the other two A. Input to the other two consortiaconsortia

TimelineTimeline

Look at the evidence Look at the evidence produced by the other produced by the other consortia consortia technical technical guidanceguidance

Oct 08 - June Oct 08 - June 0909

Participation in meetings of Participation in meetings of Academic & CSO consortia Academic & CSO consortia and report backand report back

Sept 08 - Sept 08 - June 09June 09

Regular stock-taking expert Regular stock-taking expert consultationsconsultations

Oct 08 - June Oct 08 - June 0909

Foster countries’ Foster countries’ participation & leadership in participation & leadership in other consortiaother consortia

Oct 08 - June Oct 08 - June 0909

Page 10: The proposed plan of work of the « implementers consortium »: objectives, methods, expected outcomes, timelines, partners Waranya Teokul (Thailand) and

19 avr. 2023 10Implementers consortium

B. Technical guidanceB. Technical guidance TimelineTimeline

Participation in the Scientific Participation in the Scientific Advisory Committee meetingsAdvisory Committee meetings

Oct 08 - June Oct 08 - June 0909

Consolidated opinion on the Consolidated opinion on the quality and relevance of the quality and relevance of the evidenceevidence

Oct 08 - June Oct 08 - June 0909

Meetings of WHO writing Meetings of WHO writing committee committee guidance on guidance on positive synergiespositive synergies

Mar 09 - Dec Mar 09 - Dec 0909

Ministerial meeting to Ministerial meeting to endorse WHO guidance, prior endorse WHO guidance, prior to G8to G8

Late June 09Late June 09

Implementation of policy and Implementation of policy and recommendations in recommendations in countriescountries

June 09- Dec June 09- Dec 09 (and 09 (and beyond)beyond)

Evaluation of policy’s Evaluation of policy’s implementationimplementation

2010 2010

Page 11: The proposed plan of work of the « implementers consortium »: objectives, methods, expected outcomes, timelines, partners Waranya Teokul (Thailand) and

19 avr. 2023 11Implementers consortium

C. AdvocacyC. Advocacy TimelineTimeline

Bring Positive Synergies work Bring Positive Synergies work on to the agenda of on to the agenda of appropriate fora, incl. appropriate fora, incl. Member State meetings, Member State meetings, board meetings, and other board meetings, and other high-level forahigh-level fora

Oct 08 - Dec Oct 08 - Dec 0909

Present the technical Present the technical guidance resulting from the guidance resulting from the project in appropriate foraproject in appropriate fora

June - Dec June - Dec 0909

Advocate and mobilise for the Advocate and mobilise for the “Positive Synergies” work, “Positive Synergies” work, and obtain consensus on the and obtain consensus on the recommended strategies for recommended strategies for maximizing positive synergiesmaximizing positive synergies

Oct 08 - Dec Oct 08 - Dec 0909

Page 12: The proposed plan of work of the « implementers consortium »: objectives, methods, expected outcomes, timelines, partners Waranya Teokul (Thailand) and

19 avr. 2023 12Implementers consortium

6. Partners6. Partners Leadership = MoHs of Mali and Leadership = MoHs of Mali and

ThailandThailand Around 15 members =Around 15 members = Coalition Coalition

of implementers incl. of implementers incl. representatives from GHIs, representatives from GHIs, recipient governments, and NGOsrecipient governments, and NGOs

Optimum diversification in terms of Optimum diversification in terms of professional background, gender, professional background, gender, geographical representation, geographical representation, international standing and affiliationsinternational standing and affiliations

Page 13: The proposed plan of work of the « implementers consortium »: objectives, methods, expected outcomes, timelines, partners Waranya Teokul (Thailand) and

19 avr. 2023 13Implementers consortium

6. Partners6. Partners Proposed composition of membership :Proposed composition of membership :

3 from low income countries 3 from low income countries 3 from lower middle income countries3 from lower middle income countries 3 from GHIs : GF, GAVIs, PEPFAR3 from GHIs : GF, GAVIs, PEPFAR 1 each from the Academic Consortium and 1 each from the Academic Consortium and

the Civil Society Consortium, in order to the Civil Society Consortium, in order to facilitate close cooperation between the facilitate close cooperation between the different consortiadifferent consortia

3 from international NGOs or independent 3 from international NGOs or independent scholars or actively engage in health scholars or actively engage in health systemsystem

2 public figures such as politicians / 2 public figures such as politicians / celebrity/ journalists (for advocacy purpose)celebrity/ journalists (for advocacy purpose)

From Africa, Asia, Latin America, EuropeNorth America