Table of Contents
1. Project Outline
2. Output 1: Formulation of Kathmandu valley and district level plan
3. Output 2: Formulation of a seismic resistant building guideline and its dissemination and HRD
4. Output 3: Formulation of prioritized reconstruction project (Grant Aid Program)
5. Output 4: Formulation and implementation of Quick Impact Projects(QIPs)
6. Other items
3
1. Project Outline
Study Area
5
Background of the Project
On Sunday, 25 April 2015, a 7.6 magnitude earthquake struck Barpak , about 76 Km northwest of Kathmandu
To date, there are over 8,631 casualties, 16,808 injuries.
There are 0.5million of buildings totally collapsed and 27 million houses of buildings partially damaged
Points of land slides are more than 3,300 including Tibet side and delay of rehabilitation and reconstruction efforts
The government of Nepal submitted a request to the government of Japan for a rehabilitation and recovery project on 5th of June. Based on the request and a series of consecutive discussions, both sides agreed on and signed the Record of Discussion (R/D) on 15th of June.
This Project is implemented by the Japan International Cooperation Agency through the JICA Project Team based on the contents agreed on the R/D stated above.
6
Objectives
• To implement Technical Cooperation Project and Development Study to support process of early rehabilitation and recovery of the affected areas
• To formulate disaster resilient nation and society by referring the experience and lessons learned of the disaster and reconstruction in Japan.
• To implement a prioritized reconstruction project to fill the demand-supply gap which arises during the transition from humanitarian assistance phase to rehabilitation and reconstruction
• To develop additional projects such as Program Grant Aid and Loan Projects.
7
Project Outputs
Outputs Descriptions
Output1: Formulation of Plans
Formulation of Kathmandu city resilient plan Formulation of Rehabilitation and Reconstruction grand design for Gorkha and Sindhupalchowk
Output2: Enhancement of Seismic Resistance building and structure
Preparation of Seismic resistant guideline for building and structure Human resource development plan for seismic resistant housing and school buildings
Output3: Identification and formulation of emergency recovery and rehabilitation projects(Grant Aid )
Prepare outline technical design and cost estimation for implementation of priority projects that are found applicable for Japanese grant aid scheme
Output4: Implementation of emergency recovery and rehabilitation (Quick Impact Projects: QIPs)
Formulation of quick impact projects and their implementation.
8
Project Time Frame Implementation Period: July 2015 – June 2017
Ju
l
Au
g
Se
p
Oct
No
v
De
c
Ja
n
Fe
b
Ma
r
Ap
r
Ma
y
Ju
n
Ju
l
Au
g
Se
p
Oct
No
v
De
c
Ja
n
Fe
b
Ma
r
Ap
r
Ma
y
Ju
n
Ju
l
Output 1:
Formuation of National level and
District level plans
Output 2:
Promotion and dissemination of
seismic resistant buildings and
structures
Output3:
Formulation of prioritized
reconstruction projects (Program
Grant Aid)
Output 4:
Formulation and implementation of
QIPs
Year
Month
2015 2016 2017
Formulation of Kathmandu vally resilient Plan
Grand design for recon. & rehab. for 2 Districts
Digital Topo. Map
Land side Hazard Map
Review
Stru
cture
Co
de
Develo
p
Gu
idelin
es
Form
ulate
PG
AP
rojects
Form
ulate
QIP
s Implementation of Quick Impact Projects
Implementation of Program Grant Aid Projects
Work Items for all Outputs in Common
• Item [1]: Collection, analysis, evaluation of the existing plan and information for developing a framework of the Project
• Item [2]: Survey and analysis of the current condition
• Item[3]: Study tour in Japan
• Item[4]: Implementation of capacity building
10
Output 1:
• Output1 Formulation of Kathmandu valley and district level plan
– Item[5]: Purchase of satellite images or shoot of aerial photos
– Item[6]: Preparation of digital topographic maps
– Item[7]: Preparation of hazard map
– Item[8]: Formulation of Kathmandu resilient plan & grand design for district level rehabilitation and recovery
11
2. Output 1
Plan for Geospatial information
①Satellite imagery (1.50mResolution)
②Existing Map (1/25,000・1/50,000)
Sindhupalchok
Gorkha
Katmandu Basin
Topographic map Katmandu Basin (1/5,000・1/10,000)
Hazard map Gorkha Sindhupalchok
Plan for Topographic Map
Topographic map Katmandu Basin 1/5,000 : 100km2 1/10,000 : 721km2
Policy
Objectives
Projects
Towards Resilience: Disaster Risk Reduction and Build Back Better
1.Creating Safer Cities and Rural
3.Restoration of Local Economy
2.Recovery of People’s Daily Life
Creation of Safer Communities by Structural and Non-structural measures
Capacity Development on Disaster Prevention through Resilient communities, and Creation of Living Environment toward Sustainable Livelihood
Recovery and Promotion of Industry such as Tourism and Agriculture to enhancement of community power
15
Construction of Public Facilities and Provision of Equipment
Implementation of Livelihood Recovery and Skill Training & Building Resilient Community
15
Kathmandu Resilient Plan / Grand Design
for Rehabilitation and Recovery
3. Output 2
Output 2:
• Output2 Formulation of a seismic resistant building guideline and its dissemination and HRD
– Item[9]:Confirmation of and review on the building and infrastructure standards
– Item[10]:Formulation of seismic resistant building guideline
– Item[11]: Support to build model housing and schools
– Item[12]: Study on dissemination mechanism
17
18
Typical Failure Pattern of Non-engineered houses
Hiroshi IMAI
Delaminating Wall
・Joints filled with stone pieces or joints left unfilled
・Low shear strength, particularly with poor mortals.
・Brittle behavior in tension as well as compression.
Gap between outside to inside
Delaminating wall
1
9
Residence Model House Construction
Tribhuvan University June 20,2015
4. Output 3
Output 3
• Output 3 Formulation of prioritized reconstruction project (Grant Aid Program)
– Item[13]: Selection of prioritized reconstruction project plans
– Design and approximate cost estimation of the prioritized reconstruction project plans
21
Construction of Safe School Example of Pakistan Muzaffarabad
Work Schedule for Output 3
23
July August September
Review exiting studies
Sounding at relevant organizations
Criteria for survey site selection
Selection of site to be surveyed
Site survey
Criteria for selection of Priority Reconstruction Projects (PRPs)
Selection of PRPs
Project profile
Technical note
Outline design
Construction plan
Outline cost estimate
Reporting
Natural condition survey
Products of Output 3
24
Progress report (end of September)
Selection results of priority reconstruction projects (Grant Aid Program) and prioritized project list
Project profile of priority reconstruction projects
Outline design
Outline cost estimate
Results of survey for environmental and social considerations
5. Output 4
Output 4
• Output4 Formulation and implementation of Quick Impact Projects(QIPs)
– Item[14]: Formulation of QIPs
– Item[15]: Implementation and implementation management of QIPs
26
27
Formulation and Implementation of Quick Impact Projects (QIPs)
• Formulation process
2) Needs survey Interviews at target DDCs
Items identified in Output 3 but cannot be
implemented through grant aid program
Concepts and ideas shared by relative
government agencies and donor organizations
Longlist of candidate projects
3) Establishment of criteria for project evaluation / evaluation of candidate projects
Shortlist of candidate projects
4) Selection of QIPs Site survey and collection of detail
information
Effect of project implementation
Consistency with formulation concept
Balance with other formulation
concepts
Areal distribution
Expandability of project effect
Prioritization of QIPs
1) Concept for QIP formulation Formulation of QIPs necessary and effective for
the disaster affected areas
Discussion with Relevant Organizations of Nepal
QIPs to be implemented
Survey for Local Governments
• Interviews with DDCs in the project area
– Preparation of longlist at DDC→Finalization at Municipal / Village level
– However, with the consensus of DDC, project list may be directly prepared at Municipal / Village level. This may save considerable amount of time.
28
District Municipality/VDC
Sindhupalchok 1.Melamchi Municipality(Melamchi、Talamarang、Jyamire、Sindhukot、Bansbari、Shikharpur、Phataksila); 2.Chautara Municipality(Chautara、Pipaldanda、Kubhinde、Sanusirbari); 3.Barhabise VDC
Gorkha 1.Ghyachok VDC; 2.Warpak VDC; 3.Simjung VDC; 4.Sairpani VDC; 5.Muchchok VDC; 6.Jaubari VDC; 7.Takmaj Hiakuri VDC; 8.Shrithankot VDC; 9.Tarkukot VDC; 10.Chhoprak VDC; 11.Gaugkhu VDC; 12.Masel VDC; 13.Nataeshwar VDC; 14.Taple VDC; 15.Khoplang VDC; 16.Prithbinarayan Municipality; 17.Phinam VDC; 18.Virkot VDC; 19.Deurali VDC; 20.Bakrang VDC; 21.Manakamana VDC
Selection of QIPs for Implementation
• Site survey / collection of detail information
– Access to site / physical obstacles for implementation
– Readiness of concrete implementation plan, participation of local government staff in project activities
– Plan for operation and maintenance
• Selection of QIPs
– Examination in reference to individual formulation concept
– Project effect, areal distribution of projects, balance among other formulation concepts, further expandability of project effect
– Prioritization of QIPs based on implementation period, importance, balance among formulation concepts and sector coverage
29
6. Other items
Reporting Schedule
Report Date Copies
Inception Report (IC/R) July 2015 20 copies
Progress Report (PR/R) September 2015 20 copies
Interim Report1 (IT/R1) April 2016 20 copies
Interim Report2 (IT/R2) November 2016 20 copies
Draft Final Report (DF/R) April 2017 20 copies
Final Report (F/R) June 2017 30 copies
31
The following reports are scheduled to be prepared and submitted within the Project period.
Study Tour in Japan(three times)
32
• Visit to disaster affected areas in Japan to observe undertaken / ongoing efforts for recovery and reconstruction
• To share actual experiences and lessons learned in Japan from past disasters
Lecture on
protection facilities
Local industry
(food processing)
Relocation housings
Stockpile
warehouse
Requirements
The following items will be required from the government of Nepal (as stated in the R/D).
• Assignment of C/P personnel
• Office space with necessary equipment (Kathmandu, Shindhpalchowk, and Gorkha)
• Provision of available data (including maps and photographs) and information
• Grant privileges, exemptions and benefits including official visas.
• Selection of Joint Coordination Committee (JCC) members and coordination
33