the process flow
DESCRIPTION
Process flow of AM factoryTRANSCRIPT
The Process Flow
Merchandising- Recieving the techpack from buyer and receiving the order on the basis of buying sample.
After buying sample approval Fit sample is sent to buyer on the basis of which buyer appoves P.O.
After P.O. reciept the sealer and size set sample made and sent to factory along with Production File
Store- 50% Fabric and trims received by Store from main store
PPC- Pre Production Meeting to discuss the production files with Merchant and go ahead for Pilot sampling.
Pilot, reference and rack samples are made, reports made and sent to Head office for buyer approval.
After Pilot and rack sample approval the NSR meeting is held and PPM notes are discussed along with R&D reports and go ahead for bulk production
Cutting- Cut Plan made as per P.O. and markers and cutting is done as per cut plan and sent to production floor after quality audit
Sewing-Producing arments from cut panels through progressive bundle system. Inspection of pieces at endline and dispatch area.
Washing- Pieces sent to washing after Kaj button and the washed as per approved recipe for washing, lot wise.
Finishing-Washed pieces comes to finishing 100% audit. Reject pieces are sent to floor for part change.
Other types of defects are mended in finishing room, then the pieces are sent for initial checking, pressing and then final checking.
Packing- Again after 100% audit the pieces are sent for packing, here pieces are packed as per buyer requirements with given packing trims
Buyer Audit and dispatch- After packing pieces are sent to Buyer QA for approval of the shipment at AQL and then dispatched in container.
The Material Flow
Store:
Cutting:
Fabric Inhouse Temprory stored on pallets fabric inspection Temprory stored
on racksissued to
cutting/washing
Issued to Sewing
Auditing
Ticketing
Bundeling
end piece stored on racks
Cutting
Fabric laying
CAD/Manual Marker making
Marker Planning
temprory stored under tables
Fabric lot recieved
Sewing:
Finishing:
issued to washing/finishing
Quality Audit
end line inspection
inline inspection
sewing
Piece feeding
Line setting
Line planning
Production sample recieved
issued to packing
Auditing
lable/tag attatchment
buton sew
button marking
spotting
alteration
inspection
sorting
lot recieved from sewing/washing
Packing:
dispatch to delivery
final auditing
carton packing
piece packing
size wise sorting
passed through needle testing machine
lot recieved from finishing
Sewing Floor 2Description CapacitySewing Machines 300Production Per day 1900 pcsRacks(1’x0.5’) 200
Sewing Floor 1Description CapacitySewing Machines 300Production Per day 2500 pcsRacks(1’x0.5’) 200
Finishing (Ground Floor)Description CapacitySewing Machines 12
Cutting(Basement)Description CapacityCutting Tables 10Capacity 2000 pcs per day
Material Handling equipmentDescription CapacityTrolley 5Racks (2’x3’) 60Racks (4’x4.2’) 10
ManpowerProduction 353Quality 26Finishing 112Washing 9Packing 12
HR 4Maintenance 3Store 7IE 7Cutting 29IT 1