the ‘one’ trust

19
The ‘ONE’ Trust

Upload: opa

Post on 08-Jan-2016

40 views

Category:

Documents


1 download

DESCRIPTION

The ‘ONE’ Trust. The‘ONE’ Trust : Mission. To work as ONE united Sri Lanka to make a significant contribution to the Nation Re-building effort through Sustainable Economic Development. The Background……. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: The ‘ONE’ Trust

The ‘ONE’ Trust

Page 2: The ‘ONE’ Trust

The‘ONE’ Trust : Mission

To work as ONE united Sri Lanka to make a significant contribution to the Nation Re-building effort through Sustainable Economic Development

Page 3: The ‘ONE’ Trust

The Background…….

Given the re-building efforts that are taking place in the country today, Cargills Ceylon Ltd (Cargills) have come forward with the concept of “The ONE Trust”.

The ONE Trust which has been conceptualized by Cargills is a project to contribute to the Nation re-building effort through a long term sustainable project.

The project will be launched by Cargills and will be sustained through the help and support of partners who will join the project at various stages.

The project will be managed by a team of individual professionals led by Cargills, along with a team of professionals who share the same objectives and principles.

The project will be overseen by a Group of Trustees and independent auditors.

Page 4: The ‘ONE’ Trust

The ONE Trust

To help in the re-building efforts by

Providing necessary educational and other facilities and guidance to the children of Sri Lanka through – better values and positive thinking about the future

Page 5: The ‘ONE’ Trust

Project Details Implementation

The educational project will be managed by a partnership between an affected school and a partnering school in an unaffected area.

These partnering schools will follow the concept of “ADOPTING” a school in the affected areas.

The main focus of the project will be Primary education where ever possible since these kids are the most vulnerable.

Role of ONE Trust

The ONE Trust will do the matching of schools for partnerships The ONE Trust will fund facilities for the schools as well as pay and take

care of costs of all the volunteers for working on the project.

Page 6: The ‘ONE’ Trust

Project Details Implementation

Role of the Partnering Schools

The partner school will do day-to-day management of the project.

The partner schools will also contribute in terms of funding for the project.

The partner school will also help in finding teachers/ counselors and other volunteers & syllabi, text books etc

The partner school will also help immediately in setting up temporary shelters if needed for the children of these affected schools so that they are properly provided for until such time that the permanent new buildings are constructed.

Page 7: The ‘ONE’ Trust

Project Details Time Plan

Stage 1: To set up temporary centres that will substitute as educational and/ or counseling centers until the actual schools are re-build. Time period: starting February to continue as long as needed, until

all schools are re-built. Approx. upto 1 yr.

Stage 2: To facilitate the re-building of schools in terms of - Providing facilities, equipment to improve standards & finding teachers etc.- Conduct Special Programs on value building which will include the parents.- Training teachers etc.,Time period: as long as necessary depending on fund availability.

Page 8: The ‘ONE’ Trust

Project Details Geographical Focus

Will select areas in 1-3 districts where the need is most. Likely districts: Galle, Hambantota, Mullativu and Ampara.

Select at least 10 schools in total from the above districts or any other districts as per the need.

Page 9: The ‘ONE’ Trust

Finance and Legal Issues

The project will be under the supervision of a Group of Trustees.

The project will be managed by a group of professionals from Cargills, partner organizations and individuals.

Proper fund management resources and auditors will be utilized to manage the finances.

The project will be implemented with the consent of the education ministry.

For the purpose of project management a representative of The ONE Trust will be appointed to each of the management committees within the schools to monitor.

Page 10: The ‘ONE’ Trust

Funding - Grants

Select at least 10 schools in total with an estimate spend of Rs.4-5 million per school. (no. can be increased depending on the funds raised).

Initial seed capital to set up project expected from Cargills/ CT group.

The trust need to raise further funding of Rs. 50 million to complete the project.

Other funding:– Overseas Partners of Cargills Ceylon

Page 11: The ‘ONE’ Trust

Manpower

Initially volunteers from Cargills Volunteers from partner organisationsVolunteers from the partner schools in Western

Province and NGO’s

Page 12: The ‘ONE’ Trust

Our Projects

“The ONE Trust & The Musicians for the People Concert”

was held in aid of educational facilities for children in tsunami affected areason the1st & 2nd April 2005

 

Page 13: The ‘ONE’ Trust

Dharmmarama Kanishta Vidyalaya (750 – 950 students).Adopted by Musaeus College Colombo

The school which is located in Ahangama in the Galle District, is a Primary school that offers education from Grade 1 to Grade 5.

The current school premises which has been almost 100% destroyed, fall within the 300m demarcated area from the sea and hence there is no possibility of re-building at the same site.

The ONE TRUST team has already put up 2 sheds which could accommodate 350-400 children for conducting classes.

In addition to this, we have provided the school with the necessary books and other stationery items needed to start academic work.

Total Contribution Rs. 1.5M

Page 14: The ‘ONE’ Trust

The Diayalagoda Maha Vidyalaya (started in 1864 as the “English School”) was one of the schools affected by the TsunamiAdopted by St. Joesephs College Colombo 10

Situated in Beruwela Building in close proximity to the

main road- completely destroyed Replacements needed for Steel

Furniture, Cupboards, Video equipment, Lab equipment

Contribution from ONE Trust Rs. 2M

Total extent of the damage Rs. 10.75m

Page 15: The ‘ONE’ Trust

Madampe MV AmbalangodaAdopted by Ladies College Colombo 7

The school has one of the largest School playground areas in the district Total number of pupils 1000No. Of girls approximately 400: No. Of boys aprox.600Staff Teaching staff 47, Minor staff 5 = Total 51

Tsunami and Consequences (a)11 Teachers and 2 minor staff in and around the school area have lost houses, furniture and

property  (b)Other teachers around – Dodanduwa and Seenigama have been severely affected. 

School buildings assessed (a)No doors or windows (b)No desks or tables (c) All books have been destroyed 

(a)Computers (20 new) and 1 old) all destroyed as is the entire computer room. (b)Parapet wall that forms the front boundary of the school destroyed (c) 121 the majority of the children’s homes would have been destroyed

 (a)2 sets of parents have been killed. School reopened on 10th January 2005, Only 10 pupils attended.09.(a)Sports facility destroyed  (b)Home science facility destroyed  (c) Library destroyed  (d) Music and dancing facility destroyed

Contribution from ONE Trust Rs. 2.75M

Page 16: The ‘ONE’ Trust

Work Shop conducted at Madampe Maha Vidyalaya

Page 17: The ‘ONE’ Trust

Maha Vishnu Vidyalaya. Sri Mamanga Vidyalaya. Ramakrishnamission Maha Vidyalaya. Kalmunai

Adopted by Methodist College Colombo

Total number of Children 756

Maha Vishnu Vidyalaya and Sri Mamanga Vidyalaya completely destroyed and majority of the children affected

Ramakrishna Maha Vidayalaya is not damaged, however a large amount of students are affected.

ONE Trust contribution is Rs. 1.8M

Page 18: The ‘ONE’ Trust

Day Out for Children from Kalmunai

The ONE Trust organized a one days’ outing for the children of Maruthamunai Kalmunai.

These children were severely affected by the tsunami

Page 19: The ‘ONE’ Trust

Thank You

THE ONE TrustRebuild our nation with:

“One Mind, One Mission”

ConceptualizedBy

Cargills (Ceylon) LimitedMarch 2005