The New 28 Silk Road: Challenges and Opportunities in China for Electronic Material Suppliers Candice Fan, Global Strategic Supply Manager, Linde Electronics

Upload: others

Post on 10-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

The New 28Silk Road: Challenges and Opportunities in China for Electronic Material Suppliers

Candice Fan, Global Strategic Supply Manager, Linde Electronics

Page 2: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

China and Taiwan: close, common language, common culture

TaiwanChina180 km

distance

Page 3: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

China and Taiwan: but also very different

China Taiwan

300mm wafer starts775,000 per month1 wafer start / km2

1,450,000 per month500 wafer starts / km2

Semiconductor salesUSD 16B

5% of globalUSD 51B

15% of global

Page 4: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

China and Taiwan: but also very different

China Taiwan

Population1,400 million19% of global

23 million0.32% of global

GDPUSD 11,200B18% of global

USD 520B0.84% of global

Page 5: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Logistics Management

Page 6: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

China5,500 km

Taiwan400 km

China and Taiwan: close but different…

Hsinchu park

Taichung park

Tainan park

Keelung port

Taichung port

Kaohsiung port

Tianjin port

Qingdao port

Lianyungang

Shanghai port

Ningbo port

North China base

West China base East China base

South China base

1800 km1200 km

1600 km

1400 km

Hong Kong port

Page 7: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Importing electronic materials into China

S. Korea

35 days

30 days

1~3 days

3~5 days

Taiwan

2~3 days

20~500 km1~ 3 days

1500 km5~7 days

1400~1900 km5~8 days

North China base

West China base

East China base

South China base

America

Europe

Japan

Shanghai port

1200 km3~5 days

Page 8: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

China raw material processor locations

Shanghai portAnhui

Jiangxi

Jiangsu

Zhejiang

Sichuan

Henan

Hebei

Shandong

Hubei

Tianjin

Guangdong

2000 km

1500 km

1000 km

500 km

Page 9: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Quality Gatekeeper

Page 10: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Examples of key China raw material supplies for electronic supply chain

Liaoning Fluorspar: HF, NF3, SF6, CF4, etc.

Page 11: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Examples of key China raw material supplies for electronic supply chain

Inner Mongolia Rare Earths: Ce, Pr, Nd, Sm, Eu, Gd, Tb, Dy, Ho, etc.

Page 12: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Examples of key China raw material supplies for electronic supply chain

Hubei Phosphoric Acid: PH3

Page 13: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Examples of key China raw material supplies for electronic supply chain

Guangxi Tungsten: WF6, WCl5

Page 14: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Examples of key China raw material supplies for electronic supply chain

Yunnan Germanium: GeH4, Ge2H6

Page 15: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Examples of key China raw material supplies for electronic supply chain

Yunnan Arsenic: AsH3

Page 16: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Between the variability of the raw material source

Source

Page 17: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

And the precision of manufacturing

Source Use

Page 18: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Material suppliers like Linde LienHwa are the quality gatekeepers

Source Quality Use

Page 19: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Linde LienHwa

Establish and certify QMS

Align with EICC

Ensure business continuity

Perform incoming material QC

Control production quality

Manage deviations from specification

Manage process changes

Raw materials

Manage deviations from specification

Manage process changes

Qualify suppliers

Qualify products

Manage supplier performance

Quality: Holistic, collaborative approach

We achieve electronics industry quality standards with close collaboration throughout the supply chain

CustomerManage deviations from specification

Manage process changes

Understand customer requirements

Check and develop requiredcapability

Page 20: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

High-purity EMs

15 to 20 years ago

High-purity EMs

Tight consistency

Within the last 10 years

High-purity EMs

Tighter consistency

Use of overall process control system

Recent / Present

High-purity EMs

Tighter consistency

Use of overall process control system

Fingerprinting

Near future

Quality: reduce variability, tighten control limits

IC technology step changes drive electronic materials purity and analytical requirements

Page 21: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Spec

0 10 20 30 40 50

ppm impurities

Number of measurements

CustomersExpect Linde to meet purity specifications and control limits

ExampleSpecification: 50 ppmControl limit: 20 ppmMean: 8 ppm

Mean

+3σ

Are even more concerned about unknown and uncontrolled impurities

Quality: Customers are driving tighter requirements

Page 22: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Quality: local and consistent

The highest quality demands production, stocking, and analysis local to the customer.

China

Page 23: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Quality: local and consistent

The highest quality demands production, stocking, and analysis local to the customer.

Taiwan

Page 24: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Quality: local and consistentCopy-exact procedures to produce consistent results

Page 25: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Raw materials

Chemical production Purification Blending Analysis Distribution

Transformation of raw materials to electronic-grade products requires quality throughout the supply chain

Material providers like Linde LienHwa are the quality gatekeepers

Page 26: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Business Continuity

Page 27: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Supply interruptions can be caused by natural disasters

Fukushima Earthquake and Tsunami: 2011

Page 28: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Supply interruptions can be caused by human events

Beijing Olympics: 2008

Page 29: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Supply interruptions can be caused by human events

G20 Summit: 2016

Page 30: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Supply interruptions can be caused by human events

Tianjin Port Explosion: 2015

Page 31: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

And they can happen close to home

921 Earthquake: 1999

Page 32: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

And they can happen close to home

Kaohsiung Gas Explosions: 2014

Page 33: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

>50+ sources globally

BCL3

B2H6

Cl2DCSHalocarbons HBrLaser gasNH3

Si2H6

WF6

BF3

ClF3

D2

GeH4

HClHF HeSiH4

TCSXe

N. America Asia

Cl2DCSF2 MixHalocarbonsHBrHCl NF3

NH3

SF6

Si2H6

CHF3

F2

GeH4

HCDS HeN2OPOCl3SiH4

TCS

Europe

DopantsHe N2O TCS

HCl HF NH3

Xe

Global EM supply network

Linde global supply network

Page 34: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Material supply by trading

Multiple sources – same product Example: HCl

Sourcing

• Access to 4/7 Global suppliers representing 67% of HCl capacity

• Distribute prime source to the respective region, as well as introduce new source for BCP

Assets

• Variety of fleet- ISO tube trailers- Drum, Y Tonner, Cylinder

• Capability in ISO tube service

• Periodic testing, maintenance, and upgrading of assets in line with global standards

Quality

• Proven track record of bulk HClsupply to semiconductors customers across the world for several decades

• Multiple sources – same final product

Supplier D (10%)

Supplier A (29%)

Supplier C (17%)

Supplier B (29%)

Supplier E (6%)

Supplier F (5%)Supplier G (4%)

Global Capacity 2017 (>17.5 Ktons)

Page 35: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Material supply by manufacture

Multiple local plants – same process Example: N2O

Manufacture

• High volume product – must be made close to customer for cost

• Manufacture in 4 countries to be close to customer

• Same process in each location

Assets

• Variety of fleet- ISO tube- Drum, Y Tonner, Cylinder

• Capability in ISO tube service

• Periodic testing, maintenance and upgrading of assets in line with global standards

Quality

• Proven track record of bulk N2O supply to semiconductors customers across the world for several decades

• Multiple local plants – same final product

#4 (14%)

Linde (31%)

#3 (16%) #2 (20%)

#5 (4%)#6 (2%)

Others (11%)

#7 (2%)

Page 36: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Local Capabilities

Page 37: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Linde LienHwa Taiwan electronic material infrastructure

AUECC plant (wet chemicals)

ESG warehouse

Electronics R&D Center

On-site / merchant plant

PGP plant

ESG plant

Hsinchu Science Park (North)

Taichung Science Park (Central)

Tainan Science Park (South)

Page 38: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Linde LienHwa China electronic material infrastructure

Linde ASU site

ESG plant

ESG warehouse

Jilin

Beijing

Shan’xi

Sichuan

Fujian

Guangdong

HebeiShanxiTianjin

Shandong

Henan

Anhui

Hubei

Jiangxi

Shanghai

Jiangsu

Zhejiang

Changshu

Liaoning

Bulk gas plant on customer site

Page 39: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

Linde LienHwa is the bridge to new markets and new materials

Logistics management• Integrating global supply

chains

• Networks covering all business zones

Quality gatekeeper• Critical link between raw

materials and fab

• New sources – same quality

Business continuity• Dual trade lanes

• Multiple sources

Local capabilities• Experience

• Capacity

Page 40: The New Silk Road - Linde Gas › en › images › Linde LienHwa...China and Taiwan: but also very different. China Taiwan. 300mm wafer starts 775,000 per month 1 wafer start / km

www.linde.com/[email protected]