the new public safety decree 7964 and its technical impact on the construction field in lebanon
TRANSCRIPT
-
DECREE 7964 PUBLIC SAFETY LAW
BRIEF PRESENTATION
JUNE 2013
-
WAL YTEFAS CILBUP - 4697 EERCED
5002/30/11 39241
2102/40/70 :no deussI
2102/21/60 :ecnis elbacilppA
2
-
Main definitions as per the decree 7964:
The technical control:
The technical controller: 4 categories
Apave was among the first accredited Technical Control Office in Lebanon by Decision #1139 dated 2/11/2012 as 1st category.
3
DECREE 7964 - PUBLIC SAFETY LAW
-
Main definitions as per the decree 7964:
The norms and standards adopted:
Libnor:
LIBNOR is a public institution attached to the Ministry of Industry. It is the sole authority to issue, publish and amend Lebanese standards and to give the right to use the Lebanese Conformity Mark (NL Mark).
Apave is a member in 3 committees and the head of the fire safety committee. 4
DECREE 7964 - PUBLIC SAFETY LAW
-
Applicable on:
New buildings that do not have permit yet.
Buildings under construction that need a new permit (adding new building above existing building, adjusting the occupancy).
Cases under discussion!
5
DECREE 7964 - PUBLIC SAFETY LAW
-
Project Owner
What is Third Party Technical Control
Consult / Designer Contractor / Executor
Technical third Party
DECREE 7964 - PUBLIC SAFETY LAW
-
The missions : Mission L:
Solidity of the building and the equipments that are part of the structure, including the closing walls and coverage clos et couverts (curtain walls, cladding, waterproofing).
Shoring and excavation works are not part of the mission.
Mission PS: Seismic stability.
7
DECREE 7964 - PUBLIC SAFETY LAW
-
Seismic
Changing the seismic acceleration coefficient to 0,25G
0.25 g Horizontal Acceleration Moderate seismic Risk
-
Adopted Norms and Standards
9
French Norms (PS92, BAEL, DTU...).
American Norms (UBC or IBC, ACI..).
-
Adaptation to French Referenced Documents (according to Libnor - NL 135)
10
Apply the Seismic Design Rules PS92 & Guide AFPS 1992 considering a minimum value of the peak ground acceleration (acclration nominale) equal to aN = 2.5m/s2 corresponding to seismic zone II (zone de sismicit II) and to an occupancy category of normal hazard (catgorie douvrages dits risque normal). The above mentioned value is subject to an increase based on the class of hazard of the structure.
-
Adaptation to American Referenced Documents (according to Libnor - NL 135)
11
Uniform Building Code UBC 97 The seismic zone factor to be adopted is Z =0.25 Apply the following table to define the Seismic Coefficient Ca taking into account the Seismic Zone Factor Z and the Soil Profile type :
SOIL PROFILE TYPE SEISMIC ZONE FACTOR, Z
Z = 0.25
SA 0.2
SB 0.25
SC 0.29
SD 0.32
SE 0.35
SF See Footnote 1
TABLE 16-Q SEISMIC COEFFICIENT Ca 1Site-specific geotechnical investigation and dynamic site response analysis shall be performed to determine seismic coefficients for Soil Profile Type SF.
-
Adaptation to American Referenced Documents (according to Libnor - NL 135)
12
SOIL PROFILE TYPE
SEISMIC ZONE FACTOR, Z Z = 0.25
SA 0.2
SB 0.25
SC 0.4
SD 0.47
SE 0.74
SF See Footnote 1
1Site-specific geotechnical investigation and dynamic site response analysis shall be performed to determine seismic coefficients for Soil Profile Type SF.
Apply the following table to define the Seismic Coefficient Cv taking into account the Seismic Zone Factor Z and the Soil Profile type: TABLE 16 R SEISMIC COEFFICIENT Cv
-
Adaptation to American Referenced Documents (according to Libnor - NL 135)
International building Code IBC Adopt the following spectral response acceleration parameters Ss
(short period) and S1 (1-second period) :
13
COUNTRY
2009 IBC MCE SPECTRAL RESPONSE ACCELERATION
Ss
S1
LEBANON 1.20 0.40
Apply the following table to determine the Site Coefficient Fa taking into account the Ss parameter and the Site Class :
-
Adaptation to American Referenced Documents (according to Libnor - NL 135)
14
SITE CLASS MAPPED SPECTRAL RESPONSE ACCELERATION AT SHORT PERIOD
SS = 1.20
A 0.8
B 1.0
C 1.0
D 1.0
E 0.9
F Note b
TABLE 1613.5.3 (1) VALUES OF SITE COEFFICIENT Fa
b- Values shall be determined in
accordance with Section 11.4.7of ASCE 7.
-
Adaptation to American Referenced Documents (according to Libnor - NL 135)
Apply the following table to determine the Site Coefficient Fv taking into account the S1 parameter and the Site Class:
TABLE 1613.5.3 (2) VALUES OF SITE COEFFICIENT FV
15
SITE CLASS
MAPPED SPECTRAL RESPONSE ACCELERATION AT 1 SECOND PERIOD
S1 = 0.40
A 0.8
B 1.0
C 1.4
D 1.6
E 2.4
F Note b
b- Values shall be determined in accordance with Section 11.4.7of ASCE 7.
-
Wind
For the calculation of the wind loads on Buildings, Structures (excluding bridges) and every portion thereof, the value of the Basic Wind Speed (or Reference Wind Speed) shall be taken from the relevant Lebanese Meteorological Authority in form of National Wind Map
16
-
Basic Wind speed (Libnor NL 137 draft version)
This value shall be as per the definition of the Basic Wind Speed for every Referenced Documents (American UBC, IBC or French NV65).
It is recommended that the minimum Basic Wind Speed value not be less than the value here below ( for Beirut area):
17
-
Basic Wind speed (Libnor NL 137 draft version)
Uniform Building Code UBC97 : Vfm = 38 m/s .
Design under the International Building Code IBC 2009: V3s = 45 m/s .
Design under the French Document Rgles NV65: 2009: Vnormal = 35 m/s
European Standard - Eurocode 1: Vb,0 = 26 m/s
18
-
The missions:
Mission S:
Fire safety of the project including fire resistance of the structure, architectural arrangements and electromechanical systems.
This mission also includes protection against falling : guardrails, facades, windows
This mission does not include safety during construction.
19
DECREE 7964 - PUBLIC SAFETY LAW
-
Procedure of the technical control mission:
20
Signed by: the Owner and the Technical controller
Agreement
Conformity letter + Signing the permit drawings
Permit
Full technical report
Start of execution
Conformity report
Occupational permits
Solving architectural
issues regarding fire safety norms
Reviewing all the structural
mechanical and electrical designs
Site Visits & site visits reports
Reviewing the testing on materials
Materials submittals
DECREE 7964 - PUBLIC SAFETY LAW
-
Procedure of the technical control mission:
In conclusion: 3 requested deliverables
21
DECREE 7964 - PUBLIC SAFETY LAW
-
Classification of buildings:
3 categories.
Decree 7964 currently applicable on 1st category.
S = (Sbasements + S ground floor + S upper floors S parking)
22
DECREE 7964 - PUBLIC SAFETY LAW
-
Classification of buildings:
23
DECREE 7964 - PUBLIC SAFETY LAW
-
Classification of buildings:
24
DECREE 7964 - PUBLIC SAFETY LAW
-
Classification of buildings:
Ch = Number of rooms
25
DECREE 7964 - PUBLIC SAFETY LAW
-
Classification of buildings:
B = Number of beds
26
DECREE 7964 - PUBLIC SAFETY LAW
-
Classification of buildings:
H = Height as per the Construction code V = Number of parking spots
SS = Number of basements
27
DECREE 7964 - PUBLIC SAFETY LAW
-
Thank you for your attention!