the network rail (cambridgeshire level crossing reduction...
TRANSCRIPT
FOOT
PATH
8
FOOT
PATH
8
BOAT 33
P017P014
P018
P019 P020
P015
P016
!
!!
! !
!
!
C11 - Furlong DroveLevel Crossing
(to be closed)
0701 04
02A
"
05"
06
"
02
"
03
"
02 ELY TO PE
TERBORO
UGH RAILW
AY
Drain
Drain
Drain
Drain
Drain
Drain
Drain
MP 76.5
MP 76.75
DRAWING
CONTI
NUES
ON RE
PLACEM
ENT SH
EET 6
A FURLONG (track) (FURLONG DROVE)
MAIN DROVE
Transport and Works Act 1992The Network Rail (Cambridgeshire Level Crossing Reduction) Order
COUNTY OF CAMBRIDGESHIRE, DISTRICT OF EAST CAMBRIDGESHIREPARISH OF DOWNHAM
PLAN 25 0 25 50 75 100 125Metres
HORIZONTAL SCALE FOR PLAN 1:1250
Replacement Sheet 5 C11 - Furlong Drove Level Crossing
NOTE: The area enclosed by any limit of deviation or limit of land to be acquired or used is the area extending to the
outer edge of the line marking those limits.© Crown c opyrig h t and d atabase rig h ts 2017 Ord nance S urvey 0100040692.Th is datamust not be passed onto any c ontrac tor/s or th ird parties without permission from Network Rail’s OS Map Team and /or without your c ontrac tor/s d uly sig ned-upto th e OS FCDC Contrac tor Licence. S end ing and/or sh aring of OS d ata to/with external th ird -parties suc h as Network Rail’s Contractors, their d eleg ated ag ents and/orrepresentatives, with out proper g overnancewill put the Contrac tor (and Network Rail by extension) in breac h of the OS Contrac tor License c ond itions of ag reem ent.
No. on plan:
No. on plan:
No. on plan:
Existing or Alleged Public Right of Way
Powers Limited to Temporary Use of Land andAcquisition of Rights
Powers Limited to Temporary Use of Land
No. on plan:Powers Limited to Rights
Unrestricted powers to acquire land
New Public Right of Way
TRAFFIC REGULATION ORDERS(IF APPLICABLE)
010202A0307
¥
No. on plan:Powers Limited to Extinguishment of Rights
040506
Land Parcel Number
"
01
Limit of DeviationLimit of Land to be Acquired or Used
Individual Land Parcels are shaded incontrasting shades of grey
Network Rail PropertyAreas of Third Party Land Benefittingfrom New Access Rights
Centreline of WorkCommencement of Work
Termination of Work
New / Improved Access!(A
!
TR01 Traffic Reg ulation Ord er Reference Point
Ad m inistrative Bound aries
BOAT 33
BOAT 36
FOOTPATH 22
BOAT 34
P021
P022
!
!
10A
"
10
" 09
Drain
DRAWING CONTINUES ON REPLACEMENT SHEET 5
PYMOOR LANE
O FURLONG DROVE
Transport and Works Act 1992The Network Rail (Cambridgeshire Level Crossing Reduction) Order
COUNTY OF CAMBRIDGESHIRE, DISTRICT OF EAST CAMBRIDGESHIREPARISH OF DOWNHAM
PLAN 25 0 25 50 75 100 125Metres
HORIZONTAL SCALE FOR PLAN 1:1250
Replacement Sheet 6 C11 - Furlong Drove Level Crossing
NOTE: The area enclosed by any limit of deviation or limit of land to be acquired or used is the area extending to the
outer edge of the line marking those limits.© Cro w n co pyrig h t an d database rig h ts 2017 Ordn an ce Survey 0100040692.This datamust not be passed o n to an y co n tracto r/s o r third parties without permission fro m Netw o rk Rail’s OS Map Team an d/o r without yo ur co n tracto r/s duly sig n ed-upto th e OS FCDC Co n tracto r Licen ce. Sen din g an d/o r sh arin g o f OS data to /with extern al third-parties such as Netw o rk Rail’s Co n tracto rs, their delegated agen ts an d/o rrepresen tatives, with o ut pro per g o vern an cewill put the Co n tracto r (an d Netw o rk Rail by exten sio n ) in breach o f the OS Co n tracto r Licen se co n ditio n s o f ag reem en t.
No. on plan:
No. on plan:
No. on plan:
Existing or Alleged Public Right of Way
Powers Limited to Temporary Use of Land andAcquisition of Rights
Powers Limited to Temporary Use of Land
No. on plan:Powers Limited to Rights
Unrestricted powers to acquire land
New Public Right of Way
TRAFFIC REGULATION ORDERS(IF APPLICABLE)
091010A
¥
No. on plan:Powers Limited to Extinguishment of Rights
Land Parcel Number
"
01
Limit of DeviationLimit of Land to be Acquired or Used
Individual Land Parcels are shaded incontrasting shades of grey
Network Rail PropertyAreas of Third Party Land Benefittingfrom New Access Rights
Centreline of WorkCommencement of Work
Termination of Work
New / Improved Access!(A
!
TR01 Traffic Reg ulatio n Order Referen ce Po in t
Adm in istrative Bo un daries
FOOT
PATH
23
FOOT
PATH
23
FOOT
PATH
24
FOOT
PATH
24
P067
P070
P071 P075
P076
P073
P074
P069
P068
P072
!
!
!
!
!
!
!
!
!
!
C21 - Newmarket Bridge Level Crossing (subject to the use by vehicular traffic by persons authorised by Network Rail)
C22 - Wells Engine Level Crossing (subject to use by vehiculartraffic by persons authorised by Network Rail)
88
84
89
7980
70
73A
71
78
"
87
" 86
" 85
"
83
"
82
"
75"
74
"
81
"
73
ELY TO BURY ST EDMUNDS RAILWAY
ELY TO KING'S LYNN RAILWAY
LC
SP
SP
1.5m
0.0m
2.7m
Dra in
Dra in
Dra in
Dra in
Dra in
Dra in
Drain
Tra ck
MP 12
Bridg e
MP 11.75
MP 69.75
Path (um)
P um ping Sta tion
CAWDLE FEN
CAWDLE FENBRIDGE FEN
RIVER GREAT OUSE
Transport and Works Act 1992The Network Rail (Cambridgeshire Level Crossing Reduction) Order
COUNTY OF CAMBRIDGESHIRE, DISTRICT OF EAST CAMBRIDGESHIREPARISH OF ELY
PLAN 25 0 25 50 75 100 125Me tre s
HORIZONTAL SCALE FOR PLAN 1:1250
Replacement Sheet 19 C21 - Newmarket Bridge and C22 - Wells Engine Level Crossings
NOTE: The area enclosed by any limit of deviation or limit of land to be acquired or used is the area extending to the
outer edge of the line marking those limits.© Crown copyrig h t a nd da ta b a se rig h ts 2017 Ordna nce Surve y 0100040692.Th is da ta must not b e pa sse d onto a ny contra ctor/s or th ird pa rtie s without permission from Ne twork Ra il’s OS Ma p Te a m a nd/or without your contra ctor/s duly sig ne d-upto th e OS FCDC Contra ctor Lice nce . Se nding a nd/or sh a ring of OS da ta to/with e xte rna l th ird-pa rtie s such a s Ne twork Ra il’s Contra ctors, th e ir de le g a te d a g e nts a nd/orre pre se nta tive s, with out prope r g ove rna nce will put th e Contra ctor (a nd Ne twork Ra il by e xte nsion) in b re a ch of th e OS Contra ctor Lice nse conditions of a g re e m e nt.
No. on plan:
No. on plan:
No. on plan:
Existing or Alleged Public Right of Way
Powers Limited to Temporary Use of Land andAcquisition of Rights
Powers Limited to Temporary Use of Land
No. on plan:Powers Limited to Rights
Unrestricted powers to acquire land
New Public Right of Way
TRAFFIC REGULATION ORDERS(IF APPLICABLE)
707173A74757879
80818283848587
8889
¥
No. on plan:Powers Limited to Extinguishment of Rights
7386
Land Parcel Number
"
01
Limit of DeviationLimit of Land to be Acquired or Used
Individual Land Parcels are shaded incontrasting shades of grey
Network Rail PropertyAreas of Third Party Land Benefittingfrom New Access Rights
Centreline of WorkCommencement of Work
Termination of Work
New / Improved Access!(A
!
TR01 Tra ffic Re g ula tion Orde r Re fe re nce P oint
Adm inistra tive Bounda rie s
FOOT
PATH
1
FOOTPATH 10
FOOTPATH 1
P115
P117P122
P118
P119 P116
T005
!
!!
!
!
!
!
"
PATH NOT ON DEFINITIV E M AP
Brinkle y Road Le ve lCrossing (to re m ain ope n)
Six M ile Bottom Le ve lCrossing (to re m ain ope n)
C29 - CassellsLevel Crossing(to be closed)
05
09
06
07
05
02 02
"
03
"
04
"
01
"
01
"
04
LINE RAIL
W AY
CAM BRIDG
E TO IPSW
ICH
3
3
2
1
6
2
5
21 1
1
89
5
1
2
9
2
6
9
4
92
871
1
3
5 4
2
7
4
6
10
10
1112
Ex
FB
SP
Te l
The
De f
De f
Def
Hall
Ne w
THE
(PH)TCB
Tank
Path
Path
NookDaisy
M an
Pond
M P 8
Drain
JustinTrac k
Trac k
Trac k
Trac k
House
CliftonHouse
Station
32.3m
33.2m
36.3m
33.5m
M P.25
Lay-by
A 1304
Cottage
Gre e n
De e ping
Pavilion
Ce lad ineTam e risk
Gard e nsGard e ns
Tre e Tops
Allotm e nt Allotm e nt
He rm itage
The Hall
Hollyhoc ks
1.22m RH
1.22m RH
El Sub Sta
PADDOCKS
Ce d ar Lod ge
1.22m Tk H
The Conife rs
M e ad ow RueProspe c t V illa
Station House
The Bungalow
CP & ED Bdy
ARDROSS CT
W ar M e m orialCric ke t Ground
Hall Cottage s
Hall Cottage s
ED and Ward Bdy
DELAM ERE CLOSE
Station Cottage s
LONDON ROAD
Six M ile Bottom
St Ge orge 's Churc h
Parish of Carlton
Parish of Little Wilbraham
Parish of Little Wilbraham
Parish of Little Wilbraham
District of East CambridgeshireParish of Westley Waterless
District of East CambridgeshireParish of Brinkley
Parish of BrinkleyDistrict of East Cambridgeshire
District of South Cambridgeshire
District of South Cambridgeshire
District of South Cambridgeshire
District of South Cambridgeshire
BRINKLEY ROAD
BRINKLEY ROAD
A1304 LONDON ROAD
W ILBRHAM ROAD
Transport and Works Act 1992The Network Rail (Cambridgeshire Level Crossing Reduction) Order
COUNTY OF CAMBRIDGESHIRE
PLAN 25 0 25 50 75 100 125M e tre s
HORIZONTAL SCALE FOR PLAN 1:1250
Replacement Sheet 33 C29 - Cassells Level Crossing
NOTE: The area enclosed by any limit of deviation or limit of land to be acquired or used is the area extending to the
outer edge of the line marking those limits.© Crown c opyright and d atabase rights 2017 Ord nanc e Surve y 0100040692.This datamust not be passe d onto any c ontrac tor/s or third partie swithout permission from Ne twork Rail’s OS M ap Te am and /or without your c ontrac tor/s d uly signe d -upto the OS FCDC Contractor Lic e nc e . Se nd ing and/or sharing of OS d ata to/with e xte rnal third -partie s suc h as Ne twork Rail’s Contractors, the ir d e le gate d age nts and/orre pre se ntative s, without prope r gove rnanc e will put the Contractor (and Ne twork Rail by e xte nsion) in bre ac h of the OS Contractor Lic e nse c ond itions of agre e m e nt.
No. on plan:
No. on plan:
No. on plan:
Existing or Alleged Public Right of Way
Powers Limited to Temporary Use of Land andAcquisition of Rights
Powers Limited to Temporary Use of Land
No. on plan:Powers Limited to Rights
Unrestricted powers to acquire land
New Public Right of Way
TRAFFIC REGULATION ORDERS(IF APPLICABLE)
01 (Parish of Brinkle y)01 (Parish of Little W ilbraham )0304 (Parish of Brinkle y)04 (Parish of Little W ilbraham )05 (Parish of Brinkle y)05 (Parish of Little W ilbraham )
060709
¥
No. on plan:Powers Limited to Extinguishment of Rights
02 (Parish of Brinkle y)02 (Parish of Little W ilbraham )
Land Parcel Number
"
01
Limit of DeviationLimit of Land to be Acquired or Used
Individual Land Parcels are shaded incontrasting shades of grey
Network Rail PropertyAreas of Third Party Land Benefittingfrom New Access Rights
Centreline of WorkCommencement of Work
Termination of Work
New / Improved Access!(A
!
TR01 Traffic Re gulation Ord e r Re fe re nc e Point
Ad m inistrative Bound arie s