The LHC Access System. Why do we put doors ? P. Ninin, L. Scibile & the Access project team TS/CSE. LHC Access Project is made of 2 parts: * LHC Access Safety System (High reliability Interlock system) * LHC Access Control System (Industrial Access equipment). - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: The LHC Access System

Workshop Chamonix XIV , 17-21 January 2005

The LHC Access System

Why do we put doors ?

P. Ninin, L. Scibile & the Access project team TS/CSE

Page 2: The LHC Access System

P. Ninin and L. Scibile, TS/CSEWorkshop Chamonix, 17-21 January 2005

LHC Access Project is made of 2 parts:

* LHC Access Safety System (High reliability Interlock system)

* LHC Access Control System (Industrial Access equipment)

Integrated concept for Machine & Experiments

Page 3: The LHC Access System

P. Ninin and L. Scibile, TS/CSEWorkshop Chamonix, 17-21 January 2005

LHC Access Control System

Goals:– Manage access right

– Identify user

– Verify authorization

– Automatic or remote access control

Status– Contract running

– System engineering completed

– Site acceptance of “LHC 0” June 2005

Page 4: The LHC Access System

P. Ninin and L. Scibile, TS/CSEWorkshop Chamonix, 17-21 January 2005

LHC Access Safety SystemGoals:

– Protect personnel during Beam operation • nobody inside - Stop LHC if a Door is open or an Emergency Stop is

pushed

– Allows Access operation when safety conditions are met• No radiation hazards (LHC beam, RF)

– Distributed, highly reliable interlock system • Strictly designed according to the prescription of the IEC 61508 - Safety

Integrity Level 3

Status:– Specifications review EDMS 456549 (Access Safety Working Group)– HW and SW Architecture prototyping (Siemens Safety Matrix)– Contract for the system integration, installation and commissioning.– On going safety studies

Page 5: The LHC Access System

P. Ninin and L. Scibile, TS/CSEWorkshop Chamonix, 17-21 January 2005

LHC Access Safety LHC Access Control

ACCESS SAFETY

ACCESS CONTROL

Page 6: The LHC Access System

P. Ninin and L. Scibile, TS/CSEWorkshop Chamonix, 17-21 January 2005

LE PUPITRE DE CONTRÔLEProposal G. Roy, L. Hammouti

Com m ande pour re tirer un VETO +

confirm ation que le VETO est re tiré

Position sûre de tous les EIS (non a lim enté, ferm é etc.)

Com m ande pour envoyer un VETO

MODE Aucun VETO sur le groupe d’EIS correspondant

Position non sûre d’au moins un EIS (alimenté, ouvert, etc.)

Clig n o te m e n t sig n a la n t u n in cid e n t o u a n o m a lie su r le s EIS

co rre sp o n d a n ts (e x in tru sio n )

RF ZONE

TES T LOCAL

OFF

ON

OFF_ Le OFF sur des EIS faisceau/machine (verrouillage en

position sûre des éléments) est toujours possible_ Le OFF sur des EIS accès (verrouillage de la zone) n’est

possible que si la zone est sûre .

IMPORTANT

EIS covered : EIS-f circulant + TED bas de TI2/TI8+ ((SEPT + KICKERS) ou (TBSE + MBI))

SITE 6SITE 3

EIS-m

ONOFF

MA C HINE

EIS-aT

ON OFF

A C C ESTU NNEL

SITE 1

ATLAS

EIS-aT

ON OFF

A C C ESTU NNEL

EIS-aS

ON OFF

A C C ESSER V IC E

EIS-aEx

ON OFF

A C C ESEX PER IENC E

SITE 4

EIS-aT

ON OFF

A C C ESTU NNEL

EIS-aS

ON OFF

A C C ESSER V IC E

EIS-aEx

ON OFF

A C C ESEX PER IENC E

ON OFF

ENA B LE

EIS-aT

ON OFF

A C C ESTU NNEL

ALICE

EIS-aEx

ON OFF

A C C ESEX PER IENC E

SITE 2

EIS-aS

ON OFF

A C C ESSER V IC E

EIS-aT

ON OFF

A C C ESTU NNEL

CMS

EIS-aEx

ON OFF

A C C ESEX PER IENC E

SITE 5

EIS-aS

ON OFF

A C C ESSER V IC E

EIS-aT

ON OFF

A C C ESTU NNEL

EIS-aS

ON OFF

A C C ESSER V IC E

SITE 7

EIS-aT

ON OFF

A C C ESTU NNEL

TI8

EIS-f

ONOFF

FA ISC EA U

EIS-aT

ON OFF

A C C ESTU NNEL

LHC-B

EIS-aEx

ON OFF

A C C ESEX PER IENC E

SITE 8

EIS-aS

ON OFF

A C C ESSER V IC E

TI2

EIS-f

ONOFF

FA ISC EA U

LHC

O K O K

EIS-f

OFF

FA ISC EA U

EIS-a

ON OFF

A C C ES

ON

BIWDelay

RAD.Delay

LOCALRF CONTROL

Page 7: The LHC Access System

P. Ninin and L. Scibile, TS/CSEWorkshop Chamonix, 17-21 January 2005

Controlled Area

CCC

Com m ande pour re tirer un VETO +

confirm ation que le VETO est re tiré

Position sûre de tous les EIS (non a lim enté, ferm é etc.)

Com m ande pour envoyer un VETO

MODE Aucun VETO sur le groupe d’EIS correspondant

Position non sûre d’au moins un EIS (alimenté, ouvert, etc.)

Clig n o te m e n t sig n a la n t u n in cid e n t o u a n o m a lie su r le s EIS

co rre sp o n d a n ts (e x in tru sio n )

RF ZONE

TES T LOCAL

OFF

ON

OFF_ Le OFF sur des EIS faisceau/machine (verrouillage en

position sûre des éléments) est toujours possible_ Le OFF sur des EIS accès (verrouillage de la zone) n’est

possible que si la zone est sûre .

IMPORTANT

EIS covered : EIS-f circulant + TED bas de TI2/TI8+ ((SEPT + KICKERS) ou (TBSE + MBI))

SITE 6SITE 3

EIS-m

ONOFF

MA C HINE

EIS-aT

ON OFF

A C C ESTU NNEL

SITE 1

ATLAS

EIS-aT

ON OFF

A C C ESTU NNEL

EIS-aS

ON OFF

A C C ESSER V IC E

EIS-aEx

ON OFF

A C C ESEX PER IENC E

SITE 4

EIS-aT

ON OFF

A C C ESTU NNEL

EIS-aS

ON OFF

A C C ESSER V IC E

EIS-aEx

ON OFF

A C C ESEX PER IENC E

ON OFF

ENA B LE

EIS-aT

ON OFF

A C C ESTU NNEL

ALICE

EIS-aEx

ON OFF

A C C ESEX PER IENC E

SITE 2

EIS-aS

ON OFF

A C C ESSER V IC E

EIS-aT

ON OFF

A C C ESTU NNEL

CMS

EIS-aEx

ON OFF

A C C ESEX PER IENC E

SITE 5

EIS-aS

ON OFF

A C C ESSER V IC E

EIS-aT

ON OFF

A C C ESTU NNEL

EIS-aS

ON OFF

A C C ESSER V IC E

SITE 7

EIS-aT

ON OFF

A C C ESTU NNEL

TI8

EIS-f

ONOFF

FA ISC EA U

EIS-aT

ON OFF

A C C ESTU NNEL

LHC-B

EIS-aEx

ON OFF

A C C ESEX PER IENC E

SITE 8

EIS-aS

ON OFF

A C C ESSER V IC E

TI2

EIS-f

ONOFF

FA ISC EA U

LHC

O K O K

EIS-f

OFF

FA ISC EA U

EIS-a

ON OFF

A C C ES

ON

BIWDelay

RAD.Delay

Example – Access at point 4 during RF tests

During Local Control: Restricted list of people that can access the zone

Local control panel

DELEGATION OF CONTROL

ENABLEENABLE

Access Valves Valves HV inhibit RF inhibit

Activity Mode Stoppers SC Module ACN

Beam CLOSED OUT OPEN OPEN NO NO

Access OPEN-ACCESS IN CLOSED CLOSED YES YES

Conditioning, RF Tests OPEN-RF Enable IN OPEN OPEN NO IF Valves CLOSED

SAFETY MATRIX

Interlock handling: Door opening cuts RF in all cavities. Around 3 secs later (exact time to be determined) the 18 kV cells are opened. The 18 kV is however the ‘legal’ interlock for INB. Handled completely by Access people.

Page 8: The LHC Access System

P. Ninin and L. Scibile, TS/CSEWorkshop Chamonix, 17-21 January 2005

LHC Experiments

• Dedicated list for controlling the access to the experimental areas

• Delegation of the Access Control Desks to the experiment control rooms

Page 9: The LHC Access System

P. Ninin and L. Scibile, TS/CSEWorkshop Chamonix, 17-21 January 2005

Installation phases

• Between today, the HW commissioning, the machine checkout, and the beam operation?

Installation HW commissioning Machine checkout Beam operation

Installation Access ControlCCC - Surface

+ Where required

Underground Access ControlLimit the constraint of transport

Access safety

LASSCommissioned

RF TestWhen?

LHC phases

Page 10: The LHC Access System

P. Ninin and L. Scibile, TS/CSEWorkshop Chamonix, 17-21 January 2005

From Commissioning to LHC Operation

• Access control for the Commissioning– Specific authorization lists– Installation of access points prior to equipment

commissioning– Remote control integrated in the CCC– New training integrated in authorization database– First points to be installed in point 7-8

• Access Safety for the RF Commissioning• Access Safety for the LHC Operation

– Completely tested before the COLD CHECKOUT• Patrol• Safety Matrix• Actions on the machine elements

– INB/DSO tests before FIRST BEAM

Page 11: The LHC Access System

P. Ninin and L. Scibile, TS/CSEWorkshop Chamonix, 17-21 January 2005

Conclusion

• For the time being:– In line with LHC planning

– No major technical issues to be solved

• Thanks to:– Access Safety Working Group (G. Roy)

– LHC Area Access Working Group (D. Swoboda)

• Special request to AB:– To finalize the list of equipments (EIS) which needs to be

interlocked with the access.

Page 12: The LHC Access System

P. Ninin and L. Scibile, TS/CSEWorkshop Chamonix, 17-21 January 2005

Thanks to the LHC Access projects collaborators

Jean-Francois JugetSerge Di Luca

T. RiescoN. RamaS. Grau

M. MunozF. HavartM. Boffard

E. Sanchez-Corral MenaT. Ladzinski

G. RoyD. Swoboda

G. SmithT. Pettersson

A. DayCEGELEC – SCHNEIDER - SIEMENS