the iwrm phase ii 2019 2023 myanmar-norway …...nov 07, 2019  · committee (ncrmc) and the...

12
The IWRM phase II 2019 – 2023 Myanmar-Norway Environmental Programme II Norway-Myanmar Environmental Programme; Presentation of results and introduction of the second phase Toe Aung (WMD FD) and Ingrid Nesheim (NIVA) October 25th, International Business Center, Yangon

Upload: others

Post on 18-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The IWRM phase II 2019 2023 Myanmar-Norway …...Nov 07, 2019  · Committee (NCRMC) and the National Water Resource Committee (NWRC) have cross over management responsibilities in

The IWRM phase II 2019 – 2023 Myanmar-Norway Environmental

Programme II

Norway-Myanmar Environmental Programme;

Presentation of results and introduction of the second

phase

Toe Aung (WMD FD) and Ingrid Nesheim (NIVA)

October 25th, International Business Center, Yangon

Page 2: The IWRM phase II 2019 2023 Myanmar-Norway …...Nov 07, 2019  · Committee (NCRMC) and the National Water Resource Committee (NWRC) have cross over management responsibilities in

Myanmar-Norway Environmental Programme (2019- 2023)

NIVA and WMD FD are jointly responsible for the Programme’s coordination

Reports for download available from:

facebook page: IWRM and from Programme

homepage https://mnenvironment.com/

Page 3: The IWRM phase II 2019 2023 Myanmar-Norway …...Nov 07, 2019  · Committee (NCRMC) and the National Water Resource Committee (NWRC) have cross over management responsibilities in

IWRM project Phase II

Page 4: The IWRM phase II 2019 2023 Myanmar-Norway …...Nov 07, 2019  · Committee (NCRMC) and the National Water Resource Committee (NWRC) have cross over management responsibilities in

The IWRM II project

• Aim of good ecological status and healthy rivers and lakes (chemical and ecological status)

• River basin management and plans

• Good quantitative status

• Coordination of authorities

• Involvement of interested parties

Myanmar National

Water Framework Directive

(NWRC, 2014)

A system for ecological status

assement for rivers and lakes; (data

from representative rivers and

lakes in Myanmar; master students

A National Water Quality

laboratory: physical

paramterers, nutrients, heavy

metals and organic pollutants

Database; data user interface

Coordination and involvemnet

for the development of river

basin managemet plans

Page 5: The IWRM phase II 2019 2023 Myanmar-Norway …...Nov 07, 2019  · Committee (NCRMC) and the National Water Resource Committee (NWRC) have cross over management responsibilities in

Study sites

River Basin Management

Potential minings study sites:

Shwegyin; Moehti Moemi;

Indawgyi; Mawchi; Monywa;

Tanintharyi

Study sites for developing the system for ecological status

assessment: Try to cover diversity of main different ecological sites.

Lakes and reservoirs (total around not all yet selected 6 – 10):

Mandalay Region: Taungthaman Lake, Paleik Inn, Pyu Inn, and Sonye Inn,… Sagaing Region: Whettighan Lake,.. Magwe Region: Whetthae Lake,…

Rivers Bago Region: Bago River,

Shwegyin River, Sittaung River,

Thanintharyi Region: Tanintharyi River

Page 6: The IWRM phase II 2019 2023 Myanmar-Norway …...Nov 07, 2019  · Committee (NCRMC) and the National Water Resource Committee (NWRC) have cross over management responsibilities in

The project will continue and expand the river basin management approach in line with the Myanmar NWFD

Continue in Bago Sub-basin Area to follow up on the decided Programme of measures

Establish arenas for coordination of authorities and involvement of NGOs in sub-basins within for development of Sub-basin Water Management Plans

Facilitate for coordination between Sittaung Sub-basin Areas for development/ agreeing on a Sittaung River Basin Management Plan

Experiences from implementing the approach in sub-basins where different ethnic groups are present

Page 7: The IWRM phase II 2019 2023 Myanmar-Norway …...Nov 07, 2019  · Committee (NCRMC) and the National Water Resource Committee (NWRC) have cross over management responsibilities in

Initiate the River Basin Management Approach in Tanintharyi Region

The Tanintharyi Basin demonstrates a “Ridge to Reef” approach, as the largely influenced coastal areas is part of the basin.

The National Coastal Resource Management Committee (NCRMC) and the National Water Resource Committee (NWRC) have cross over management responsibilities in the basin- the case area represents an opportunity to link two national platforms.

The mixed impacts of mining, agriculture, and hydropower on the ecosystems demands integrated approaches to water resources management in a river basin in southern Myanmar.

Page 8: The IWRM phase II 2019 2023 Myanmar-Norway …...Nov 07, 2019  · Committee (NCRMC) and the National Water Resource Committee (NWRC) have cross over management responsibilities in

Monitoring, risk assessments, handling and

awareness for areas affected by mining

8

Six sites will be selected including:

Shwegyin; Moehti Moemi; Indawgyi and

other sites by discussing with relevant

stakeholders.

Overview of contamination issues Sampling, analysis and levels assessed at different

mining sites

Risk assessment of metals contamination

Communicating risks to local government and

civil society

Demonstration of risk assessment

Training workshops arranged for stakeholders

Page 9: The IWRM phase II 2019 2023 Myanmar-Norway …...Nov 07, 2019  · Committee (NCRMC) and the National Water Resource Committee (NWRC) have cross over management responsibilities in

The database and the Data user Interface

Training by stakeholders in project case areas – (as in Bago) for access to data in database and the database analyses tools.

Fact sheets - Develop dataproducts for automatically generated from Aquamonitor

Enhance/extend database with additional data

Key objective: FD to combine and visualise water

quality and spatial datasets from a variety of

sources

Page 10: The IWRM phase II 2019 2023 Myanmar-Norway …...Nov 07, 2019  · Committee (NCRMC) and the National Water Resource Committee (NWRC) have cross over management responsibilities in

The Data user Interface -New analysis tools

JupyterLab and QGIS

Platforms for scientific data analysis Spatial and statistical analyses Hydrological and water quality

modelling

Training for communication of data –master students; courses

Page 11: The IWRM phase II 2019 2023 Myanmar-Norway …...Nov 07, 2019  · Committee (NCRMC) and the National Water Resource Committee (NWRC) have cross over management responsibilities in

Foods for thoughts!

What synergies or initiatives should the Programme coordinators promote / facilitate for?

- within the programme or with other project ?

Page 12: The IWRM phase II 2019 2023 Myanmar-Norway …...Nov 07, 2019  · Committee (NCRMC) and the National Water Resource Committee (NWRC) have cross over management responsibilities in

Thank you for your time and your attention!