The Growth of Advanced Conversion Technologies for the

Treatment of Waste in the UK.

Keith Riley Vismundi Limited Lingfield Surrey RH7 6BT

Page 2: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

Vismundi

2  

Document Control

Name Signature Date Prepared by Keith Riley 15/04/2015 Checked by Approved by Keith Riley 15/04/2015

Issue Date Status Draft 1 Draft for comment Final 26th April 2015 Report issued

DISCLAIMER

This document has been prepared solely for the use of Ricardo-AEA and its clients and should not be relied upon or used for any other review project or technology without an independent review being carried out as to its suitability and the prior written authority of Vismundi Limited. Vismundi and its directors accept no responsibility or liability for the consequences of this document being used for a purpose other than the purposes for which it was written. Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be taken to confirm his agreement, to indemnify Vismundi and its directors accept no responsibility or liability for this document to any party other than to the person by whom it was commissioned.

Vismundi has prepared this document in its professional capacity as an Advisor to Ricardo-AEA. The report, therefore, does not in any way purport to include any legal advice or opinion, and financial statements, figures etc that have not been audited and provided by accountants, should not be relied upon other than as broad guidance.

Vismundi has set out the information, assessments and conclusions contained in this document on the basis of information supplied by third parties.

Final 16th August 2015 Public edition

Page 3: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

Vismundi

3  

0.0 Contents

Section Title Page 1.0 Introduction 4

2.0 Summary 4

3.0 Description of Survey and Results 5

4.0 Changes in the UK Waste Management Market 7

5.0 The Renewables Order 7

6.0 Electricity Market Reform and Projected Impacts 8

7.0 Conclusions 9

8.0 Acknowledgements 10

Appendix 1 Database of UK ACT Projects 11

Page 4: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

Vismundi

4  

1.0 Introduction

This report was commissioned by Ricardo-AEA under PO 70102294, and funded by the International Energy Agency’s Bioenergy Agreement through Task 36, managed by Ricardo AEA.

Vismundi Limited was requested to investigate the apparent growth of the use of Advanced Conversion Technologies (gasification and pyrolysis) for the treatment of waste in the UK, and identify the number of projects in development and in operation, and state the reason for the growth experienced.

Vismundi has used direct knowledge, internet search engines and the Planning Portal to produce a database of ACT projects, now presented in this report as of March 2015. As a result, 88 projects have been identified in various stages of development. The report then explains how changes in the market for energy from waste in the UK, the Renewables Obligation (RO), and Electricity Market Reform (EMR) has facilitated a growth from a couple to the current number in 5 years.

2.0 Summary

The use of advanced conversion technologies (ACT) – namely pyrolysis and gasification – has increased rapidly in the UK over the last five years. In 2008, when Waste Gas Technology UK Ltd retrofitted an Energos gasification unit into an old incinerator in the Isle of Wight, it became the first successful operational gasification unit in the country using waste as fuel. Today, using Vismundi’s direct market knowledge of the waste management market, internet search engines and the UK Government Planning Portal1 a survey has revealed a total of 87 ACT projects in the UK with the intent of treating MSW or C&I wastes, in various states of realisation. Whilst some of these facilities are delayed in their development – and some are even moribund, - 23 of them are progressing, and a further 28 have a chance of moving into development and operating at some time in the future - a remarkable increase over a relatively short period of time. 37, however are considered to be moribund or have little chance of being developed, indicating that projections based on the number of projects announced or even for which planning permission is granted, overstates the likely growth in waste management infrastructure.

The decline in local authority energy from waste procurements under PFI and the Renewables Obligation (RO) with the incentives offered through Renewable Obligation Certificates (ROCs) has change the market for energy from waste infrastructure development. The competitive advantage provided to ACT by ROCs compared with combustion technologies has facilitated ACT schemes to come forward, but has also encourage a significant amount of speculation by potential developers. The outcome of the 2014 allocation round of Electricity Market Reform (EMR), with its use of auction to award Contracts for Difference (CfDs), indicates, however, that in the future only the more competitive developments will have any chance of receiving an incentive payment and it is expected that the more

1

http://www.planningportal.gov.uk/wps/portal/portalhome/unauthenticatedhome/!ut/p/c5/04_SB8K8xLLM9MSSzPy8xBz9CP0os3gjtxBnJydDRwMLbzdLA09nSw_zsKBAIwN3U_1wkA6zeHMXS4gKd29TRwNPI0s3b2e_AGMDAwOIvAEO4Gig7-­‐eRn5uqX5CdneboqKgIAGUwqho!/dl3/d3/L2dBISEvZ0FBIS9nQSEh/  

Page 5: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

Vismundi

5  

speculative projects will fall away. Consequently, only a fraction of the 88 projects identified are expected to be realised.

3.0 Description of Survey and Results

The survey of ACT projects in the UK intended for the treatment of either MSW or C&I wastes is presented in Appendix 1.

The projects, which include both pyrolysis and gasification technologies, were identified from a combination of sources viz:

• Vismundi’s direct knowledge of the waste management marketplace and thecompany’s own involvement in some of those projects;

• Internet searches using key words and Google Alerts reporting pages relatedto energy from waste ;

• Trade publications such as MRW, Edie Environmental News, ENDS Reportetc;

• The UK Government Planning Portal, whose home page ishttp://www.planningportal.gov.uk/wps/portal/portalhome/unauthenticatedhome/!ut/p/c5/04_SB8K8xLLM9MSSzPy8xBz9CP0os3gjtxBnJydDRwMLbzdLA09nSw_zsKBAIwN3U_1wkA6zeHMXS4gKd29TRwNPI0s3b2e_AGMDAwOIvAEO4Gig7-eRn5uqX5CdneboqKgIAGUwqho!/dl3/d3/L2dBISEvZ0FBIS9nQSEh/

The survey was carried out over March 2014 to March 2015. Initial findings were reported at the IEA Task 36 at Harwell on 29th October 2014 in Vismundi presentation ” Drivers for Advanced Thermal Technologies – Why Gasification is booming in the UK”. At this time it was reported that over 100 pyrolysis and gasification projects had been identified. Subsequent refinement of the survey reclassified some projects as biomass rather than waste, and eliminated others considered to be “false” announcements and that have notr even received real consideration. As a consequence, the number of projects now identified as having some basis and proposed for the treatment of wastes as at March 2015 is 87.

The database presented in Appendix 1 is in the form of a spreadsheet table and provides the following information:

• Project reference – this is just an allocated number• Developer – the name of the company responsible for developing the project

as far as it is known.• Site name – the name by which the site is known• Address – postal address of the site• County - county, unitary authority or city in which the project lies• Country – England, Scotland, Wales or Northern Ireland to allow a sort by

administration• Waste throughput (tpa) – tonnage of waste of thermal treatment process• Generation capacity (MW) – reported capacity of plant in MW electrical• Technology - the type of technology or the proprietary make if known• Programme – any information on programme timescales if known• Status – a short statement of the current position of the project• KR Comments – the personal view of the author.

Page 6: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

Vismundi

6  

• References – internet URLs referring to the project. These are given just aslinks to provide information. They are not comprehensive and in some casesmay not be reliable a number are press extracts.

The database shows the following:

1. Pyrolysis is not yet commonly used for waste treatment, although at times it isdifficult to differentiate between a pyrolysis stage (in near zero oxygen)followed immediately by combustion of the syngas and gasification (sub-stoichiometric combustion) followed by full combustion. The reason it is lesspopular than gasification is probably because it is endothermic and requiresenergy to be input to maintain stable reaction.

2. There are 88 identified projects as of March 2015. Of these, 61 are inEngland, 14 in Scotland, 10 in Wales and 3 in Northern Ireland.

3. Using the traffic light system, only 23 of the 87 projects are green with a highprobability of proceeding. 27 are amber and may or may not go ahead, but37 are red with a low probability of proceeding. This indicates how theconsidering the number of EFW projects alone, without considering thecontext in which they sit misleads evaluations of capacity versus availablewaste. It is the writer’s view that with the recent implementation of CfD underEMR, most of the amber projects are likely to falter.

4. The survey shows that gasification technology in particular, but also pyrolysishas become an accepted method of thermal treatment of waste and that theROC system has been successful in encouraging developers to considerACT.

5. There is a large number of pyrolyser and gasifier designs and more aredeveloped every year. It is apparent from the survey, however, that certainproprietary suppliers are beginning to dominate. Within the UK, the ACTtechnology suppliers that appear to be establishing themselves (inalphabetical order) are:

• Advanced Plasma Power• Alter NRG (plasma)• Biomass Power• Chinook Sciences• Energos• Kobelco• New Earth Technologies• Nexterra• Outotec• Valmet

Time will tell whether these will continue to develop ow whether some will fall by the wayside.

Page 7: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

Vismundi

7  

4.0 Changes in the UK Waste Management Market

The most significant change in the EfW market in the UK over the last three years has been the demise of local authority contracts under PFI. This has had two major impacts:

• The number of local authority procurements has drastically reducedand a number were even cancelled. Whilst there will continue to belocal authority tenders, (a) with some notable exceptions, most of theurban conurbations have the benefit of at least one EFW plant within acatchment distance and so the number of future plants required totreat MSW will be considerably less than has been procured in therecent past; and (b) the absence of PFI support disincentivises localauthorities to procure EfW plants for themselves and so there isgreater propensity to share or even adopt a more commercialapproach to disposal of their residual waste;

• The slow down in sales to local authorities implies that future EfWplant sales must rely on C&I treatment of waste. This is a verydifferent market than the MSW one and from a plant supplier’s point ofview, considerably more competitive, because a C&I collector hasmore choice of disposal route (including export), and is not driven byethical policy such as carbon footprint or proximity principle.

The result of the above is that the marketplace for EfW plant sales is dependent on C&I sales with the only driver being a financial one – ie to be competitive with landfill disposal or the cost of export. Despite local authority “best value” methodology, the fact is that PFI has allowed the capital cost of EfW to rise and the typical costs seen in PFI tenders is too high to be competitive in the C&I marketplace. To have a forward order book, it is now necessary for an EfW plant supplier/developer to make use of any financial support available wherever possible to reduce the impact of the capital cost on the gate fee.

5.0 The Renewables Obligation

The Renewables Obligation (RO) has been the main support mechanism for renewable electricity projects in the UK. Smaller scale generation is mainly supported through the Feed-in Tariff Scheme (FITS). The RO came into effect in 2002 in England and Wales, and Scotland, followed by Northern Ireland in 2005. It places an obligation on UK electricity suppliers to source an increasing proportion of the electricity they supply from renewable sources.

Renewables Obligation Certificates (ROCs) are “green” tradable certificates issued to operators of accredited renewable generating stations for the eligible renewable electricity they generate. Ultimately, they are used by electricity suppliers to demonstrate that they have met their obligation, but have no fixed value, but is worth around £46 per ROC in 2013/14 prices.

Page 8: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

Vismundi

8  

A full explanation of the RO and ROCs will not be given here, but needless to say, the ROC mechanism effectively subsidised ACT because the number of ROCs issued to each generator is determined according to not only the amount of electricity it generates, but also the type of technology it uses - each type falls under a ‘banding level’ indicating the number of ROCs issued for each MWh generated by that technology. Until 2014, the banding awarded ACT 2 x ROCs, which is now regressing and in 2016 will be 1.8 x ROCs. However, because it is considered to be an established technology, EfW combustion is awarded no ROCs. Hence, if by way of example, the wholesale price of electricity is say £50/MWh and a ROC is worth £46, even after regression, an ACT would receive £132.30/MWh for the renewable content of its waste fuel, whereas a combustion EfW plant would receive just £50 – whereas the gate-fee received by each could be more or less the same.

Hence, with a shift in the marketplace created by the end of PFI and the strong incentive towards ACT provided by ROCs led to many developers starting to consider pyrolysis and gasification technologies. As successful experience in operating such plants in Northern Europe and Japan became known, projects involving ACT started to come forward.

For energy from waste and ACT, ROCs will no longer be available unless the plant is commissioned and accepted by Ofgem by 31st March 2017 unless it has been awarded a “grace period”, in which case the longstop date is 31st March 2018. After this date, all projects with ROCs will be grandfathered and all new projects will need to apply for a CfD (see Section 8 below). Announcement of the end of ROCs was made by DECC in October 2012.

Following the announcement of EMR in July 2011 and the ending of ROCs, with no details available of what EMR would bring, a surge in ACT developments occurred, including a number that were purely speculative. Now that EMR is implemented and we are now in the transition period when operators may choose between the two, it can be expected that the rush for ACT will slow down and the longstop date for ROCs approaches and plants cannot be built and commissioned in time, by Q3 2015, it can be expected that all new ACT developments will fall under EMR.

6.0 Electricity Market Reform and Projected Impacts

The objective of Electricity Market Reform is to deliver the more renewable energy and reliable supply, while minimising costs for consumers in the long term. The intent is to transform the UK electricity sector to one in which low-carbon generation can compete with conventional, fossil-fuel generation.

The mechanism for achieving this is called “Contract for Difference” (CfD). The full scope of EMR and CfD is too extensive to report here, but in essence, new energy from waste developments requiring to avail themselves of:

(a) a subsidy to boost the value of electricity sales; and

(b) an off-take contract that protects them from exposure to the wholesale electricity market,

will need to undertake a bidding process in an auction under what is known as an “allocation round”. Details of the allocation process can be found on the DECC website at https://www.gov.uk/government/collections/electricity-market-reform-contracts-for-difference

Page 9: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

Vismundi

9  

To win a CfD, a project has to bid within a “pot”. In 2014, Pot 1 was for more established technologies, Pot 2 for emerging technologies and Pot 3 for dedicated biomass. Energy from Waste with CHP was in Pot 1, and ACT was in Pot 2, in competition with offshore wind and biomass with CHP.

Budgets were set for each pot and starting with the lowest bid price and progressing upwards, projects were accepted and awarded a CfD until the budget was exceeded (ie bid price/MW x capacity). The project “breaking the bank” was then removed, the auction terminated and a strike price awarded to all successful bidders at the highest bid price accepted under the pot for each of the years 2016, 2017 and 2018, depending on when the project is to be be commissioned.

The 2014 allocation round has just completed and the CfD Register has been issued. It is of note that :

(a) Combustion EfW is not supported unless it is accompanied by CHP;

(b) Two EfW with CHP projects were successful, but both are associated with paper mills to take the heat and can probably be considered as being exceptional;

(c) Only three ACT projects were successful, at a strike price of £114/MWh at the price basis date (equivalent to approximately £120/MWh at current day prices);

It is unlikely that the structure of the allocation round process will change in the foreseeable future. Therefore, ACT projects that require support above say £120/MWh will not win a CfD and therefore will not be developed. This implies that only the larger, more efficient ACT projects will be developed until such time the support mechanism is changed, if it ever is.

6.0 Conclusions

The database of ACT projects in the UK as at March 2015 has been presented along with the writer’s view of their likely probability of being developed. There are 87 projects identified, but only 23 have a high probability of being developed.

The reason for the surge in ACT projects has been explained. It has been described how the move away form PFI support for local authority procurements, the new importance of the C&I waste marketplace, the RO and support given by ROCs to ACT, the ending of ROCs and the impending introduction of EMR have all conspired to encourage developers to propose ACT projects – a number of them purely speculative.

Lastly the impact of EMR has been discussed and the CfD allocation round mechanism described. It is now expected that the number of ACT projects coming forward will significantly slow down and it is possible that no new combustion EfW plants will be developed unless they are accompanied by a distributed energy system or some form of CHP.

Page 10: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

Vismundi

10  

7.0 Acknowledgements

The author wishes to acknowledge and thank the International Energy Agency and Ricardo-AEA, whose support enabled this report to be compiled.

Page 11: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

Vismundi

11  

Appendix 1

Database of UK ACT Projects

Page 12: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

Reference  

No.  

Develop

er  

Site  Nam

e  

Address  

Coun

ty  

Coun

try  

Waste  

Throug

hput  

(tpa

)  

Gen

eration  

Capa

city  

(MW)  

Techno

logy  

Prog

ramme  

Status  

KR  

Commen

ts  

References  

1.0    Gasification  

1.1  

A  E  Stua

rt  &  Son

s  

Hill  Ba

rton

 

Hill  Ba

rton

 Business  

Park,  C

lyst  St  M

ary  

Devon  

Englan

d  

72,000

 

2.6  

Fibre  Bricketts  

Unkno

wn  

Plan

ning  permiss

ion  

approved

 Decem

ber  

2009

 

Project  u

sing  6  

gasifiers  with

 5  

engine

s.    Project  has  

been

 up  for  sale.  

Nom

inated

 in  Devon

 Waste  M

anagem

ent  

Plan.    

https://www.devon

.gov.

uk/text/plando

c_25

_357

8.pd

fhttps://www.devon

.gov.

uk/text/plando

c_22

_357

8.pd

fhttp://w

ww.prope

rtypil

ot.co.uk/pdf/169

+141

1324

7.pd

fhttp://www.m

ineralandw

asteplanning.co

.uk/ne

ws/10

9065

1/en

ergy-­‐gen

eration-­‐plant

1.2  

Advanced

 Plasm

a  Po

wer  

Tyseley  Urban

 Re

source  Cen

tre”  2  

Hay  Ha

ll  Ro

ad,  Tyseley  

Birm

ingham

 

Birm

ingham

 

Englan

d  

50,000

 

6.0  

APP  Plasma  

Plan

ning  permiss

ion  

gained

 Decem

ber  

2013

 

Awaitin

g  ou

tcom

e  of  

ETI  com

petition  

Plan

ning  permiss

ion  

gran

ted.  No  

developm

ent.  Linked

 to  ETI  com

pletion  for  

efficient  gasificatio

n.  

No  an

noun

cemen

t  yet  

from

 ETI.  If  A

PP  doe

s  no

t  win  com

petition,  

plan

t  may  not  go  

ahead.

http://w

ww.letsrecycle.c

om/new

s/latest-­‐

news/app-­‐wins-­‐

perm

ission-­‐for-­‐tyseley-­‐

gasification-­‐plant/      

http://blog.advanced

plas

mapow

er.com

/new

s/adv

anced-­‐plasma-­‐po

wer-­‐

receives-­‐plann

ing-­‐

perm

ission-­‐waste-­‐

energy-­‐project-­‐tyseley/

1.3  

Air  P

rodu

cts  

Tees  Valley  1  (TV1

)  

Stockton

-­‐On-­‐Tees    

Tyne

 &  W

ear  

Englan

d  

350,00

0  

49.9  

Alter-­‐NRG

 plasm

a  gasifier/Foster  W

heeler  Syngas  

Clean-­‐up

/Air  Prod

ucts  APU

 

Constructio

n  commen

ced  

August  201

2  

In  con

struction  -­‐  late.  

Und

er  con

struction.  Rep

orted  

difficulties.    Said  to

 be  no

w  in  

commiss

ioning.  FW  

constructio

n  completed

.    Major  

restructure  of  te

am  with

in  AP.  

Power  outpu

t  likely  to  be  

redu

ced  from

 that  stated

.  

http://w

ww.airp

rodu

cts.co.uk/micro

site/uk/teesvalley/    

http://w

ww.airp

rodu

cts.co.uk/micro

site/uk/teesvalley/facilities.htm    

http://w

ww.waste-­‐m

anagem

ent-­‐    

https://www.gov.uk/governmen

t/n

ews/ne

w-­‐ene

rgy-­‐de

al-­‐to-­‐save-­‐84m

-­‐from

-­‐governm

ent-­‐

billw

orld.com

/articles/20

13/11/50

-­‐mw-­‐plasm

a-­‐gasification-­‐waste-­‐to-­‐

energy-­‐techn

ology-­‐for-­‐second

-­‐tees-­‐

valley-­‐

site.htmlhttp://www.airp

rodu

cts.co.

uk/m

icrosite/uk/teesvalley/pd

f/Tees -­‐

Valley_Re

newable_Ene

rgy_Facility.p df

1.4  

Air  P

rodu

cts  

Tees  Valley  2  

(TV2

)  

Stockton

-­‐On-­‐

Tees    

Tyne

 &  W

ear  

Englan

d  

350,00

0  

49.9  

As  Item

 1.2  

Constructio

n  started  Ap

ril  

2014

 

Und

er  

constructio

n  

As  Item

 1.2  

As  Item

 1.2  

Page 13: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

1.5  

Alternative  Use  

Group

/Alche

my  Farm

s  

Riverside  Indu

stria

l  Plan

t  

Marsh  Lan

e,  Riversid

e  Indu

stria

l  Estate,  

Boston

,  PE21  7P

J  

Lincolnshire  

Englan

d  

9020

0    woo

d  +  46

500  

sewage  slu

dge  

12.0  

Waste  woo

d  &  se

wage  

sludge.  Tho

ught  to

 be  

Dragon

 EFW

 

Plan

ning  granted

 April  

2010

 

Little  is  kno

wn  ab

out  

this.  How

ever,  D

ragon  is  

a  pyrolysin

g  system

 that  

has  n

ot  yet  proven  to  be  

finan

cially  viable.  

http://w

ww.organ

ics-­‐

recycling.org.uk/page.p

hp?article=1

133&

name

=Plann

ing+gran

ted+

for+

Brita

in%27

s+first+d

ual+

waste+gasificatio

n+po

wer+p

lant+    

http://w

ww.lincolnshire

echo

.co.uk/W

ASTE-­‐

FUEL-­‐TOWN-­‐

HOMES/story-­‐

1119

5094

-­‐de

tail/story.html

http://w

ww.m

ineralan

dwasteplan

ning.co.uk/ne

ws/10

8891

3/12

mw-­‐

gasification-­‐po

wer-­‐

station

1.6  

Amey  Cespa

 

Waste  Recovery  

Park,  D

ickens  Roa

d,  

Old  W

olverton

 

Milton

 Keyne

s  

Northam

pton

shire

 

Englan

d  

90,000

 MSW

 

7.0  

Energos  w

ith  CHP

 

Ope

ratio

nal  

Septem

ber  2

016  

Und

er  con

struction  

Loc

al a

utho

rity

MS

W c

ontra

ct.

http://w

ww.m

kwaster

ecovery.com/    

http://w

ww.letsrecycle

.com

/new

s/latest-­‐

news/am

eycespa-­‐

confirm

ed-­‐fo

r-­‐milton

-­‐keynes/    

http://w

ww.waste-­‐

managem

ent-­‐

world.com

/articles/20

13/07/go-­‐ahe

ad-­‐fo

r-­‐7-­‐

mw-­‐w

aste-­‐to-­‐en

ergy-­‐

gasification-­‐facility-­‐in-­‐

milton

-­‐keyne

s.html

1.7  

AWM  

Form

er  

Solaglas  Site

 

Ripley  Roa

d,  

Brad

ford  

Yorkshire

 

Englan

d  

160,00

0  

20.0  

Prob

ably  

Kobe

lco  

Plan

ning  

perm

ission  

rene

wed

   July  201

3    

No  progress  

Form

erly  an  

Energos  

Project.  

Situ

atio

n un

cert

ain  

  http://w

ww.

energ-­‐

grou

p.com/e

nergy-­‐

recovery-­‐

facility/com

mun

ity-­‐

liaiso

n/brad

ford-­‐plan

t/  

1.8  

Barry  Re

newab

le  

Energy  (B

ioGen

)  po

wer)  

Barry  Do

ck  

Barry,  Vale  of  

Glamorgan  

Glamorganshire  

Wales  

80,000

 

Form

erly  Ene

rgos  

with

 CHP

 

Plan

ning  

perm

ission  gained

 Septem

ber  2

009.  

No  progress  

Form

erly  a  FCC

 project.    S

ituat

ion

unc

erta

in

http://w

ww.wast

e-­‐man

agem

ent-­‐

world.com

/article

s/20

11/02/waste-­‐

to-­‐ene

rgy-­‐chp-­‐

prop

osals-­‐for-­‐

barry-­‐wales.htm

l    http://w

ww.bioge

npow

er.com

/abo

ut.htm

l#plan

tport

folio

1.9  

BCB  

Environm

ental  

Man

agem

ent  

Ltd

Unit  8

6  Marston

 Moo

r  Bu

siness  P

ark  

Tockwith

,  Wethe

rby  

Yorkshire

 

Englan

d  

60,000

 

Unkno

wn  

Plan

ning  

perm

ission  

refused  

No  progress  

Situ

atio

n  un

know

n

1.10

 

BH  Ene

rgy  Gap

 LLP  

Kirk  San

dal  

Road

,  Kirk

 Sand

al  

Doncaster  

Yorkshire

 

Englan

d  

120,00

0  

12.5  

Kobe

lco  

Plan

ning  

perm

ission  

implem

ented  

Octob

er  201

2  

Und

er  

developm

ent  

Plan

ning  

perm

ission  

implem

ented.  

In  

developm

ent  

www.bhe

nergy

gap.co.uk  

Page 14: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

1.12

 

Binn

 Waste  

Man

agem

ent  

Ltd  

Binn

 Farm  

Glenfarg,  

Perthshire,  

Scotland

 

Perthshire  

Scotland

 

60,000

 

4.5  

TBA  

Plan

ning  

perm

ission  

gran

ted  

Octob

er  201

1  

No  progress  

Orig

inally  

intend

ed  as  a

 BO

S  gasifier  

until  Dargavel  

prob

lems  

emerged.

Goo

d  

Goo

d lik

elyh

ood

of  

proc

eedi

ng  

tend

er.  

Plan

ning  

application

gained

by  Sita

,bu

tthe

yha

veab

ando

nedthe  

project.    

http://w

ww.th

ecou

rier.c

o.uk/new

s/lo

cal/p

erth-­‐

kinross/sita-­‐uk-­‐

wins-­‐approval-­‐

for-­‐gasification-­‐

sche

me-­‐at-­‐binn-­‐

farm

-­‐1.325

11    

http://w

ww.m

ine

raland

wasteplann

ing.co.uk/ne

ws/1

1026

88/gasificati

on-­‐techn

ology-­‐

preferred-­‐binn

s-­‐farm

-­‐efw

-­‐facility

1.13

 

BioG

en  

Power  

Irvine,  North  

Ayrshire  

Ayrshire  

Scotland

 

80,000

 

6.5  

Energos  

Plan

ning  

perm

ission  

gained

 Au

gust  200

7.  

No  progress  

Ex-­‐Biogen  

site.  Project  

thou

ght  to  be

 ab

ando

ned.  

http://w

ww.

energ-­‐

grou

p.com/e

nergy-­‐from

-­‐waste/plants-­‐

unde

r-­‐de

velopm

ent /  

1.14

 

BioG

en  

Power  

New

port  

Docks  

New

port  

Mon

mou

thsh ire  

Wales  

120,00

0  

12.0  

Energos  

Plan

ning  

perm

ission  

gained

 April  

2009

 

No  progress  

Ex-­‐Biogen  

site.  Project  

thou

ght  to  be

 ab

ando

ned.  

http://w

ww.

biogen

power.

com/abo

ut.ht

ml#plan

tportf

olio  

1.15

 

Biossence  

Ford  M

otor  Com

pany  

Complex  

Dagenh

am  Dock  (ELSEF)  

Lond

on  

Englan

d  

130,00

0  

19.0  

Valm

et  (formerly  

Metso)  

Non

e  

Aban

done

d  

Plan

ning  permiss

ion  

gran

ted.  No  

developm

ent.  Biossence  

Dagaen

ham  placed  into  

receivership  by  LW

ARB.  

Site  tu

rned

 over  to  

resid

entia

l  de

velopm

ent  

http://w

ww.m

rw.co.uk/

news/lond

on-­‐

gasification-­‐firm-­‐enters-­‐

administratio

n/86

6021

1.article  

1.16

 

Biossence  

Hooton

 Park  

Sustaina

ble  

Energy  Facility  

Hooton

 Park,  

North  Roa

d,  

Wirral  

Cheshire  

Englan

d  

400,00

0  

49.7  

Valm

et  (formerly  

Metso)  

Revised  plan

ning  

perm

ission  gained

 Septem

ber  2

014.  

Awaits  fina

ncial  

close  

Requ

ires  

commercial  

arrangem

ents  and

 fin

ancial  close  to

 be

 achieved.    

http://w

ww.hoo

ton

park.com

/    http://w

ww.end

swastean

dbioen

ergy.com

/article/13

1491

2/green-­‐

light-­‐biossen

ces-­‐

hooton

-­‐park-­‐wte-­‐

plan

t  

1.17

 

Biossence    

Coph

all  W

ood  

Polegate    

East  Sussex  

Englan

d  

95,000

 

18.0  

Valm

et  (formerly  

Metso)  

none

 

Aban

done

d  

Plan

ning  

application  

with

draw

n  prior  

to  com

mittee  

meetin

g  following  

criticism

 from

 ESCC

.  

http://w

ww.bioss

ence.com

/nod

e/4 7    

http://w

ww.bexhi

llobserver.n

et/ne

ws/local/p

lans-­‐

for-­‐po

legate-­‐

energy-­‐

conversio

n-­‐plan

t-­‐scrapp

ed-­‐1-­‐

1436

175

Page 15: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

1.18

 

Birm

ingham

 Bio  

Power  

Birm

ingham

 

Englan

d  

67,000

 

10.0  

Nexterra  

Commiss

ioning  

2016

 

In  con

struction  

Waste  woo

d  project.  Will  

proceed.  

http://w

ww.pow

er-­‐

techno

logy.com

/pro

jects/birm

ingham

-­‐bio-­‐po

wer-­‐plant-­‐

tyseley/    

http://w

ww.nexterr

a.ca/files/BB

PL-­‐

project.p

hp  

1.19

 

Blakeleys  W

aste  

Man

agem

ent  Ltd  

Environm

ental,  

Energy  &  Ecology  

Centre  

Bickershaw

 Lan

e,  

Wigan

 

Lancashire  

Englan

d  

70,000

 

12.0  

Unkno

wn  

Plan

ning  

perm

ission  

gran

ted,  Ja

nuary  

2013

 

No  progress  

Blakeleys  h

as  

been

 acquired  by  

Ainscough  

Investmen

ts.  

Deliberating  over  

the  de

velopm

ent.  

 

http://w

ww.blake

leys.co.uk/enviro

nmen

t_en

ergy_e

cology_n

ews.htm l    

http://w

ww.blake

leys.co.uk/enviro

nmen

t_en

ergy_e

cology_cen

tre.ht ml

1.20

 

Bomba

rdier  

Aerospace  

7  Airport  R

oad,  

Belfa

st  Harbo

ur  

Estate  

Glenfar,  C

rummlin  

Lisburn  

Northern  Ire

land

 

80,000

 

12.0  

Biom

ass  P

ower  Ltd  

grate  gasification  

9.0  

At  fina

ncial  close  

Orig

inally  a  Biogen  

project.    

http://w

ww.plann

ingni.

gov.uk/in

dex/ne

ws/ne

ws_releases/com

mon

_ne

ws_bo

mbardier-­‐

energy-­‐from

-­‐waste.htm

   http://w

ww.bbc.co.uk/

news/uk-­‐northern-­‐

ireland

-­‐      

http://w

ww.ciwm-­‐

journal.co.uk/archives/

5558

2561

8573

1.21

 

Chinoo

k  Sciences    

Lond

on  Sustainab

le  

Indu

strie

s  Park  

Dagenh

am  Dock,  

New

ham  

Lond

on  

Englan

d  

180,00

0   20  

Chinoo

k  

Complete  20

16/7  

Plan

ning  permiss

ion  

gran

ted  May  201

4  

Ex  Cyclamax  

project.  Re

ported

ly  

unde

r  con

struction  

http://w

ww.m

rw.co.uk

/hom

e/cyclam

ax-­‐

unveils-­‐plans-­‐fo

r-­‐east-­‐

lond

on-­‐gasificatio

n-­‐facility/30

0635

2.article    

http://chino

okum

.com

/future-­‐

projects/thames-­‐

gateway-­‐project/  

1.22

 

Clean  Po

wer  Prope

rties  

Ltd  

New

 Lod

ge  Farm  

Pontardu

lais  Ro

ad,  

Cwmgw

ili,  Llane

lli  

 Carmarthen

shire

 

Wales  

128,00

0  

Unspe

cifie

d  pyrolysis

 

Unkno

wn  

 Plann

ing  ap

plication  

validated

 in  Feb

ruary  20

14  

(ref.  S/295

59)  ,  Awaits  

determ

ination  

Local  cou

ncil  no

t  in  favour  

of  develop

men

t.  Plan

ning  

application  likely  to  be  

refused.  

http://cwmgw

ilien

ergy.co. uk/    

http://w

ww.llan

ellistar.c

o.uk/Cou

ncil-­‐voices-­‐

oppo

sition-­‐waste-­‐disp

osal-­‐

plan

t/story-­‐21

2864

04-­‐

detail/story.html  

Page 16: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

1.23

 

Clean  Po

wer  

Prop

ertie

s  Ltd  

Moo

r  Street  

Brierle

y  Hill,  Dud

ley  

Warwickshire  

Englan

d  

100,00

0  

6.0  

Unspe

cifie

d  pyrolysis

 

Unkno

wn  

Plan

ning  permiss

ion  

refused.  

Environm

ental  

perm

it  ap

plied  

for,  bu

t  with

draw

n.  ..  

http://w

ww.brie

rleyhil

lene

rgy.info/    

http://cmis.du

dley.gov

.uk/CM

IS5/Do

cumen

t.ashx?czJKcaeAi5tUFL1

DTL2UE4zN

RBcoShgo=

4Wh5

Cl8zofTfgxYV

VUr

cOBzlpV9

tKK1

%2FSM

7%2B

ReIOfm

eLLW

iG1w

mRsw%3D

%3D

&rUzw

RPf%2B

Z3zd4E7Ikn8Lyw

%3D

%3D

=pwRE

6AGJFL

DNlh22

5F5Q

MaQ

WCtP

Hwdh

UfCZ%

2FLU

QzgA

2uL5jNRG

4jdQ

%3D

%3

D&mCT

IbCu

bSFfXsDG

W9IXn

lg%3D

%3D

=hFfl

UdN

3100

%3D

&kCx1An

S9%2FpW

ZQ40

DXFvdE

w%3D

%3D

=hFflUdN

3100

%3D

&uJovDx

wdjMP

oYv%

2BAJvYtyA%

3D%

3D=ctNJFf55vVA

%3D

&FgPlIEJYlotS%2B

YGoB

i5o

lA%3D

%3D

=NHd

UR

Qbu

rHA%

3D&d9

Qjj0ag

1Pd9

93jsyO

JqFvmyB7X

0CSQ

K=ctNJFf55vVA

%3D

&WGew

moA

feNR9

xqB

ux0r1Q

8Za60lavYm

z=ctNJFf55vVA

%3D

&W

Gew

moA

feNQ16

B2MH

uCpM

RKZM

waG

1PaO

=ctNJFf55vVA

%3D

1.24

 

Clean  Po

wer  

Prop

ertie

s  Ltd  

Willow

broo

k  East  

Indu

stria

l  Estate  

Shelton  Ro

ad,  

Corby  

Northam

pton

shire

 

Englan

d  

128,00

0  

10  to

 15  

Unspe

cifie

d  pyrolysis

 

Unkno

wn  

Plan

ning  

perm

ission  

gran

ted  

Februa

ry  

2014

 

Mer

chan

tproject.    

http://w

ww.cor

byen

ergy.info/

downloads/Cor by-­‐

Boards_FINAL.p df    

http://w

ww.no

rthampton

shire

.gov.uk/en

/cou

ncilservices/En

viron/planning/

planapps/Docu

men

ts/PDF

%20

Documen

ts/De

cisio

n%20

Notic

es/13.00

079.W

ASFU

L%20

-­‐%20

ES%20

-­‐%20

Vol%20

3%20

NTS.pdf

1.25

 

Clean  Po

wer  

Prop

ertie

s  Ltd  

Chickenh

all  

Lane

,  Eastleigh  

Hampshire  

Englan

d  

195,00

0  

8  to  12    

Unspe

cifie

d  pyrolysis

 

Unkno

wn  

Plan

ning  

perm

ission  

gran

ted  

March  201

4  

Mer

chan

t  project.    

http://w

ww.ea

stleighe

nergy.in

fo/lo

catio

n.htm l  

1.26

 

Clean  Po

wer  

Prop

ertie

s  Ltd  

Whistlebe

rry  

Road

 

 Ham

ilton

 

South  Lana

rkshire

 

Scotland

 

128,00

0  

10  to

 15  

Unspe

cifie

d  pyrolysis

 

Unkno

wn  

Plan

ning  

perm

ission  

refused.  App

eal  

subm

itted

.  Still  

awaited.  

Mer

chan

t  project.      

http://ham

ilton

ener

gy.info/  

1.27

 

Clean  Po

wer  Prope

rties  

Ltd  

Cross  G

reen

 

 Hun

slet,  Leed

s  

North  Yorkshire  

Englan

d  

128,00

0  

10  to

 15  

Unspe

cifie

d  pyrolysis

 

Unkno

wn  

Plan

ning  permiss

ion  

rejected

 March  201

4  

Mer

chan

t  project.  

http://w

ww.casutd.co.uk/

pdf/Whe

ldon

eergy-­‐

Cleanp

ower-­‐boards.pd

f    http://w

ww.end

swastean

dbioen

ergy.com

/article/12

8917

7/uk-­‐le

eds-­‐waste-­‐act-­‐

ad-­‐plant-­‐rejected    

http://dem

ocracy.leed

s.go

v.uk/docum

ents/s11

0482

/2%

2013

-­‐02

190%

20Bridgewater%2

0Road.pd

f

1.28

 

Clean  Po

wer  

Prop

ertie

s  Ltd  

Miche

ldever  Statio

n  

Miche

ldever  

Hampshire  

Englan

d  

24,000

 

8.0  

Unspe

cifie

d  pyrolysis

 

Unkno

wn  

Plan

ning  permiss

ion  

refused  June

 201

4.  

Mer

chan

t  project.  

http://m

iche

ldeveren

erg

y.info/  

http://w

ww3.hants.gov.

uk/app

lication-­‐

details.htm

?id=

1524

1  

Page 17: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

1.29

 

Clean  

Power  

Prop

ertie

s  Ltd

Lond

on  

Gatew

ay  

Logistics  

Park  

Tham

es  

Haven,  

Thurrock  

Essex  

Englan

d  

180,00

0  

20.0  

Unspe

cifie

d  pyrolysis

 

Unkno

wn  

Plan

ning  

perm

ission  

gran

ted  

May  201

4  

Merchan

t  project.    

 

http://w

ww.

rland

energy.

co.uk/rla

nd/

abou

trland

.h tm  

1.30

 

Clean  Po

wer  

Prop

ertie

s  Ltd  

Washw

ood  

Heath  En

ergy  

Recovery  

Centre  

Washw

ood  

Heath  

Birm

ingham

 

Englan

d  

128,00

0  

15.0  

Unspe

cifie

d  pyrolysis

 

Unkno

wn  

Plan

ning  

gran

ted  

Novem

ber  

2012

 

Merchan

tproject.    

http://w

ashw

ood

energy.info/l

ocal-­‐ben

efits/  

1.31

 

Clean  Po

wer  

Prop

ertie

s  Ltd  

Allerton

 Bywater  

Whe

ldon

 Ro

ad,  

Whe

ldon

,  Ca

stleford  

West  

Yorkshire

 

Englan

d  

128,00

0  

15.0  

Unspe

cifie

d  pyrolysis

 

Unkno

wn  

Plan

ning  

application  

refused  June

 20

14.  Permit  

application  

with

draw

nNovem

ber

2014

Merchan

t  projec

t

.  

http://w

heldon

energy.info/do

wnloads/W

hel

done

nergy-­‐

Clean-­‐po

wer-­‐

leaflet.p

df    

http://w

ww.ca

sutd.co.uk/pdf/

Whe

ldon

eergy-­‐

Cleanp

ower-­‐

boards.pdf

1.32

 

Clean  Po

wer  

Prop

ertie

s  Ltd  

Willesde

n  Junctio

n  Freight  

term

inal  

Willesde

n  Junctio

n,  Ealing    

Lond

on  

Englan

d  

128,00

0  

15.0  

Unspe

cifie

d  pyrolysis

 

Unkno

wn  

 Plann

ing  

application  

deferred

 in  

August  201

3  du

e  to  HS2  

safeguarding.

No  progress

durin

g20

14.

Merchan

t pr

ojec

t.

 

http://w

illesde

nene

rgy.info/    

http://w

ww.kilbu

rntim

es.co.uk/ne

ws/en

vironm

ent/

prop

osal_to_

inst

all_an_incinerato

r_in_h

arlesden

_is

_with

draw

n_at_t

he_11th_

hour_1_

2972

880

1.33

 

Clean  Po

wer  

Prop

ertie

s  Ltd  

Darlington  

Coun

ty  

Durham

 

Englan

d  

100,00

0  

Unkno

wn  

Unspe

cifie

d  pyrolysis

 

Unkno

wn  

No  

inform

ation  

Merchan

t.  

.  pro

ject    

 

1.34

 

Clean  Po

wer  

Prop

ertie

s  Ltd  

Railw

ay  

Marshalling  

Yard  

Forres  

Morayshire

 

Scotland

 

100,00

0  

Unkno

wn  

Unspe

cifie

d  pyrolysis

 

Unkno

wn  

Plan

ning  

scop

ing  

requ

est  

subm

itted

 May  201

2  

Merchan

t  project.  No  

inform

ation  

following  

scop

ing  

requ

est.    

 

http://new

s.stv

.tv/north/112

451

-­‐plan-­‐to-­‐

build-­‐a-­‐clean-­‐

power-­‐statio

n-­‐in-­‐fo

rres-­‐take-­‐

anothe

r-­‐step

/    http://forresen

ergy.info/    

http://ope

nlylo

cal.com

/plann

ing_app

lication

s/10

3694

3-­‐Planning-­‐

Application-­‐12

-­‐00

821-­‐SCO-­‐

Railw

ay-­‐

Marshalling-­‐

Yard-­‐Forres-­‐

1.35

 

Clean  Po

wer  

Prop

ertie

s  Ltd  

Gospo

rt  

Hampshire  

Englan

d  

100,00

0  

Unkno

wn  

Unspe

cifie

d  pyrolysis

 

Unkno

wn  

No  inform

ation  

Merchan

tproject.  No  

inform

ation.  

Page 18: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

1.36

 

Clean  Po

wer  

Prop

ertie

s  Ltd  

New

 Lod

ge  Farm  

Pontardu

lais  

Road

,  Cwmgw

ili,  

Llan

elli    

Carm

arthen

shire

 

Wales  

128,00

0  

Unspe

cifie

d  pyrolysis

 

Unkno

wn  

Plan

ning  

application  

subm

itted

 Februa

ry  201

4.    

Not  determined

 

Merchan

t  project.  

http://cwmgw

ilien

ergy.co.uk/    

http://w

ww.cwmgw

ilien

ergy.co.uk/w

p-­‐conten

t/up

loads/20

13/09/clean-­‐po

wer-­‐

leaflet-­‐en

glish

.pdf  

1.37

 

Clean  

Power  

Prop

ertie

s  Ltd

Derby  

Derbyshire  

Englan

d  

Unspe

cifie

d  pyrolysis

 

Unkno

wn  

No  

progress  

Merchan

t  project.  

   

 

http://w

ww.

rland

energy.

co.uk/rla

nd/

abou

trland

.h tm    

1.38

 

Clean  Po

wer  

Prop

ertie

s  Ltd  

Swan

sea  

Swan

sea  City  

Wales  

100,00

0  

12.0  

Unspe

cifie

d  pyrolysis

 

Unkno

wn  

No  progress  

Merchan

t

project.    

   

http://w

ww.rlande

nergy.co.uk/rla

nd/a

boutrla

nd.htm

   

1.39

 

Clean  Po

wer  

Prop

ertie

s  Ltd  

Leith

 

Edinbu

rgh  City  

Scotland

 

Unkno

wn  

unknow

n  

Unspe

cifie

d  pyrolysis

 

Unkno

wn  

Represen

tatio

ns  

mad

e  with

 Network  

Rail  un

der  the

 Ed

inbu

rgh  LD

P  in  

Janu

ary  20

12

Mer

chan

t  project  

still  at  e

arly  stage.    

   

http://w

ww.rlande

nerg

y.co.uk/rla

nd/abo

utrla

nd.htm

http://w

ww.edinb

urghc

ouncil.info/LDP

/MIR_re

spon

ses/Clean%

20Po

wer%20

Prop

ertie

s%20

&%20

Network%

20Ra

il%2

0%28

Icen

i%20

projects

%20

ltd%29

.pdf    

http://w

ww.edinb

urghc

ouncil.info/LDP

/rep

s/N

etwork%

20Ra

il%20

022

02%20

Form

%20

4%20

Table%

2011

.pdf

1.40

 

Clean  Po

wer  Prope

rties  

Ltd  with

 Ham

merson  an

d  Stan

dard  Life

 Investmen

ts    

Bren

t  Cross  

Cricklew

ood,  Barne

t  

Lond

on  

Englan

d  

128,00

0  

15.0  

Unspe

cifie

d  pyrolysis

 

Unkno

wn  

Plan

ning  permiss

ion  

gran

ted  July  201

4  

Mer

chan

t  project  

.Deb

ate  over  whe

ther  or  

not  B

rent  Cross  sh

ould  

includ

e  EFW.    No  furthe

r  inform

ation  

http://brentcrosscoalition.blo

gspo

t.co.uk/201

2/10

/clean

-­‐po

wer-­‐prope

rties-­‐ltd

-­‐devil-­‐at-­‐

door.htm

l  

1.41

 

Corus  (Tata)  

Tata  Steelworks  

Shotton  Works  

Flintshire  

Wales  

110,00

0  

12.0  

Refgas  

Unkno

wn  

Plan

ning  

perm

ission  

gran

ted  Octob

er  

2009

 

No  know

n  progress.  Suspe

ct  

this  is  aw

aitin

g  econ

omic  

justificatio

n.    

http://w

ww.m

ineral

andw

asteplanning.c

o.uk/new

s/10

9064

8/CHP

-­‐plant-­‐fu

elled-­‐

refuse-­‐derived

-­‐fuel/  

Page 19: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

1.42

 

Cyclam

ax  Holdings  

Raynesway  

Resource  Park  

Raynesway,  

Spon

don,  Derby  

Derbyshire  

Wales  

70,000

 

BOS  Gasificatio

n  

Non

e  

Discon

tinue

d  

Sita  ann

ounced

 6  

plan

ts  to

 be  

develope

d  with

 Cyclam

ax.  C

yclamax  

wen

t  into  

liquida

tion  alon

g  with

 Ascot  

Environm

ental  

http://w

ww.sita

.co.uk/

news-­‐and-­‐view

s/press-­‐

releases/sita

-­‐uk-­‐and-­‐

cyclam

ax-­‐to-­‐partne

r-­‐on

-­‐six-­‐new

 

1.43

 

Cyclam

ax  Holdings  L

td  

Sheepsbridge  Resou

rce  

Park  

Dunston  Ro

ad,  

Chesterfield  

Derbyshire  

Englan

d  

60,000

 

BOS  Gasificatio

n  

Non

e  

Plan

ning  permiss

ion  

refused.  Permit  

with

draw

n  De

cembe

r  20

12.  

First  o

f  the

 Sita

/Cyclamax  

collabo

ratio

ns.  N

o  longer  

in  develop

men

t  

http://w

ww.sita

.co.uk/new

s-­‐and-­‐view

s/press-­‐

releases/sita

-­‐uk-­‐and-­‐

cyclam

ax-­‐to-­‐partne

r-­‐on

-­‐six-­‐

new    

http://w

ww.letsrecycle.com/

news/latest-­‐new

s/cyclam

ax-­‐

unveils-­‐first-­‐of-­‐seven

-­‐resource-­‐parks/    

http://w

ww.letsrecycle.com/

news/latest-­‐

news/dagenh

am-­‐gasificatio

n-­‐plant-­‐given-­‐planning-­‐

consen

t/

1.44

 

DPS/Etho

s  Ene

rgy  

Avon

mou

th  

Indu

stria

l  Park  

Avon

mou

th  

Bristol  

Englan

d  

1,00

0  

Compa

ct  Pow

er  

Pyrolysis

,  now

 ow

ned  by  DPS  

Non

e  

Plan

t  ope

rated  

betw

een  20

02  

and2

009.  Now

 closed

 

The  facility  was  n

ot

finan

cially  viable.  

Etho

s  Ene

rgy  

acqu

ired  it  from

 Co

mpa

ct  Pow

er,  but  

it  too  was  una

ble  to  

sustain  the  bu

siness.  

1.45

 

DREN

L  

Stores  Roa

d  

Corby  

Northam

pton

shire

 

Englan

d  

80,000

 

12.0  

Biom

ass  P

ower  Ltd  grate  

gasification  

Commen

ce  con

struction  

Summer  201

5  

Seeking  fin

ancial  close  

Project  d

elayed

 due

 to  

requ

iremen

t  to  vary  

plan

ning  permiss

ion.  This  is  

now  com

plete  an

d  project  

expe

cted

 to  achieve  fina

ncial  

close.  

http://w

ww.drenl.co.uk/?q=

nort

hampton

shire

-­‐cou

nty-­‐coun

cil-­‐

approves-­‐catchmen

t-­‐area-­‐

increase-­‐drenl%E2%80

%99

s-­‐en

ergy-­‐w

aste-­‐fa

cility-­‐corby    

http://w

ww.drenl.co.uk/?q=

corb

y-­‐recycling-­‐rene

wable-­‐ene

rgy-­‐

facility-­‐project-­‐up

date    

http://resou

rce.co/resou

rce-­‐

use/article/corby-­‐ene

rgy-­‐waste-­‐

facility-­‐ne

ars-­‐fin

ancial-­‐close-­‐

3228

Page 20: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

1.46

 

DREN

L  

Ex-­‐ARB

RE  Ren

ewab

le  

Energy  Facility  

Eggborou

gh,  Selby  

North  Yorkshire  

Englan

d  

200,00

0  

12.0  

Biom

ass  P

ower  Ltd  grate  

gasification  

Awaitin

g  20

15  CfD  

Allocatio

n  roun

d  

Plan

ning  app

lication  

determ

ination  for  cha

nge  

in  use  delayed

 until  Ap

ril  

2015

 

Plan

ning

app

licat

ion

succ

essf

ul. F

utur

e de

velo

pmen

t unk

now

n.    

http://w

ww.drenl.co.uk/site

s/de

fault/files/Eggbo

rough%

20C

onsulta

tion%

20Leaflet.p

df  

1.47

 

DREN

L  

Lostock  Works  

Griffiths  Roa

d,  

Northwich,  Che

shire

 

Cheshire  

Englan

d  

Unkno

wn  

Unkno

wn  

Prob

ably  Biomass  

Power  Ltd  grate  

gasification  

Unkno

wn  

Ex  Bed

minster  M

BT  

site  be

ing  considered

 for  g

asificatio

n.  

Plan

ning  permiss

ion  

gran

ted  of  a  

Bedm

inster  M

BT  

system

in20

08.n.

Being  considered

 for  

chan

ge  in  use  to

 gasification  

1.48

 

DREN

L  

TBA  

TBA  

West  S

ussex  

Englan

d  

80,000

 

12.0  

Prob

ably  Biomass  

Power  Ltd  

Unkno

wn  

Plan

ning  

application  

awaited  

Und

er  

consideration.  

Details  not  

know

n.  

1.49

 

Eco  2/  W

illiam  

Tracey  Group

 

Linw

ood,  Glasgow

 

Glasgow

 

Scotland

 

120,00

0  

12.0  

No  inform

ation  

No  progress  

Ex-­‐Biogen  site.  

Talked

 abo

ut  

recently  in  Cha

mbe

r  of  Com

merce  

meetin

g.  

http://w

ww.re

nfrewsh

irecham

ber.c

om/new

sLinw

oodE

nergyRecove

ryPlantW

illiamTraceyG

roup

.asp  

1.50

 

Energos  L

td  

Know

sley  Bu

siness  

Park  

Know

sley  

Man

chester  

Englan

d  

96,000

 

7.0  

Energos  

No  progress  

Plan

ning  permiss

ion  

gran

ted.  M

ay  200

9.  

Environm

ental  

perm

it  gran

ted  

Held  due

 to  inability  

by  Ene

rgos  to

 raise

 fund

s.    W

ill  proba

bly  

proceed  even

tually  

now  th

at  it  has  won

 tw

o  contracts.  

http://w

ww.m

rw.co.uk

/new

s/en

ergos-­‐

gasification-­‐plant-­‐

given-­‐go-­‐

ahead/86

3880

7.article    

http://w

ww.ene

rg-­‐

grou

p.com/ene

rgos/in

formation-­‐

centre/new

s/20

12/11/

energos-­‐aw

arde

d-­‐en

vironm

ental-­‐p

ermit-­‐

for-­‐know

sley-­‐en

ergy-­‐

recovery-­‐fa

cility/

Page 21: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

1.51

 

Enviropa

rks  ltd  

Enviropa

rks  M

aterials  

Recovery  Facility  

Hirw

aun  Indu

stria

l  Estate,  H

irwau

n,  

Aberda

re    

Mid  Glamorgan  

Wales  

240,00

0  

Unkno

wn  

Unkno

wn  

Likely  start  2

015  

Plan

ning  permiss

ion  

gran

ted  De

cembe

r  20

10  

Project  w

on  a  CfD  in  

2014

 Allocatio

n  roun

d.  Can

 now

 proceed  to  fina

ncial  

close.  .  

http://w

ww.bbc.co.uk/n

ews/uk-­‐w

ales-­‐sou

th-­‐

east-­‐w

ales-­‐118

9598

4  

1.52

 

EPI  Techn

ology  

Willow

 Lan

e,  

Mitcha

m  

Lond

on  

Englan

d  

8,00

0  

EPI  Pyrolysis  

Unkno

wn  

Partially  

operationa

l  

Small  prototype

.  No  electrical  

expo

rt  

conn

ectio

n.    

Unlikely  to  be  

develope

d on

this

site..  

1.53

 

Europe

an  

Metals  R

ecycling  

Oldbu

ry,  W

est  

Midland

s  

Englan

d  

350,00

0  

40.0  

Chinoo

k  Sciences  

Ope

ratio

nal  

In  ope

ratio

n  

Plan

t  treats  c

ar  

frag  and

 extracts  

metals.  

http://w

ww.waste

-­‐managem

ent-­‐

world.com

/articles

/201

2/07

/40-­‐mw-­‐

gasification-­‐plant-­‐

to-­‐recycle-­‐elv-­‐

shredd

er-­‐fluff-­‐in-­‐

midland

s.html    

http://w

ww.chino

oksciences.com

/inno

vativ

e-­‐en

vironm

ental-­‐

solutio

ns-­‐begins-­‐

constructio

n-­‐on

-­‐the-­‐worlds-­‐

largest/#.VS

GniRP

F87

M

1.54

 

Europe

an  

Metals  

Recycling  

Alexan

dra  Do

ck  

Bootle  

Merseyside  

Englan

d  

130,00

0  

30.0  

Chinoo

k  

Plan

ning  

perm

ission  

gran

ted  

Februa

ry  201

0  

Unkno

wn  

For  p

rocessing  

car  frag  an

d  recoverin

g  metals.  Likely  

to  proceed

.  

http://w

ww.chino

oksciences.com

/201

0-­‐05

-­‐27-­‐em

r-­‐granted-­‐

perm

ission-­‐for-­‐

bootle-­‐

gasification-­‐

plant/#.VS

GqIxPF

87M  

1.55

 

Foresig

ht  

79-­‐85  Be

ddington

 Lane

 

Sutton

 

Lond

on  

Englan

d  

150,00

0  

4.5  

TBA  

On  ho

ld  

Plan

ning  permiss

ion  

gran

ted  on

 app

eal  and

 revised  Septem

ber  

2014

 

Project  foreclosed  by  

lend

ers  a

nd  ta

ken  into  

Foresig

ht  dire

ct  

man

agem

ent  in  

Novem

ber  2

014.    

Med

ium  proba

bility  of  

proceeding.  

http://sutton.mod

erngov

.co.uk/m

gCon

vert2P

DF.as

px?ID=

1796

6  

Page 22: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

1.56

 

Grund

on  

Shore  Ro

ad  

Bridgend

 

Perthshire  

Scotland

 

90,000

 

Advanced

 Plasm

a  Po

wer  

Not  proceed

ing  

Plan

ning  permiss

ion  

refused.  Grund

on  lost  

appe

al  August  2

013  

Gru

ndon

stat

ed th

ey h

ave

with

dra

 

http://w

ww.dailyrecord.co.uk

/new

s/local-­‐n

ews/grun

don-­‐

express-­‐disapp

ointmen

t-­‐shore-­‐road-­‐274

9884

 

1.57

 

Grund

on  

Circular  

Techno

logy  Park”,  

Airfield  Indu

stria

l  

Estate,

Ford,  A

rund

el  

West  S

ussex  

Englan

d  

120,00

0  

14.0  

Outotec  

gasification  

(anticipated

)  

Awaitin

g  commen

cemen

t  of  con

struction.  

Anticipated

 op

eration  20

18.

Plan

ning  

perm

ission  

approved

 by  

WSCC,  but  called  

in.  A

pproval  by  

DCLG

 given

 inJanu

ary20

15De

velopm

ent  w

ill  

proceed,  but  will  

likely  ne

ed  to

 bid  

for  a

 CfD  in  201

5.  

http://w

ww.circular

techno

logypark.co.u k/    

http://w

ww.letsrecy

cle.com/new

s/latest

-­‐new

s/west-­‐sussex-­‐

approves-­‐fo

rd-­‐efw

-­‐plans/    

http://beta.dcservic

es.co.uk/new

s/13

0628

9/en

ergy-­‐from

-­‐waste-­‐fa

cility-­‐

approved

-­‐allocated-­‐

site-­‐de

spite

-­‐local-­‐

oppo

sition/

1.58

 

Hudo

l  The

rmal  Ltd  

Unit  1

5c,  C

apita

l  Va

lley  

Rhym

ney,  Blaen

au  

Gweru,  Trede

gar  

Blaena

u  Gwen

t  

Wales  

5,00

0  

Heat  

Hudo

l  Gasificatio

n  

Ope

ratio

nal  

In  ope

ratio

n  

Small  ope

ratin

g  plan

t.  Techno

logy  

was  used  for  w

ood  

gasification  (Pure  

Power,  St  N

eots),  

but  failed.  The

re  

has  b

een  no

 furthe

r  de

velopm

ent  since.  

http://w

ww.hud

ol.co.u

k/process.htm  

1.59

 

Island

 Waste  

Ltd  

Forest  Park  

Forest  Roa

d,  

New

port  

Isle  of  W

ight  

Englan

d  

38,000

 

Energos  

Ope

ratio

nal  

In  ope

ratio

n  

https://www.isl

andw

aste.co.uk

/pdfs/abou

t_isl

and_

waste.pdf  

1.60

 

Kedco  (now

 Re

act  E

nergy)  

Enfie

ld  

Lond

on  

Englan

d  

60,000

 

12.0  

Unkno

wn  

Commiss

ioning  

early

 201

6  

Und

er  

constructio

n  

Woo

d  waste  

project,  so  re

ally  

biom

ass.  

http://w

ww.letsrec

ycle.com

/new

s/late

st-­‐new

s/en

field-­‐

approves-­‐plans-­‐fo

r-­‐waste-­‐w

ood-­‐

biom

ass-­‐plant/    

http://w

ww.re

acte

nergyplc.com

/abo

ut-­‐us  

1.61

 

Levenseat  Lrtd  

Levenseat  R

ail  

Freight  

Term

inal  

West  Lothian

 

South  

Lana

rkshire

 

Scotland

 

60,000

 

10.0  

Outotec  

gasification  

Anticipated

 op

erationa

l  20

18  

In  con

struction  

Project  n

ow  

proceeding  to

 constructio

n  following  

finan

cial  close  

http://w

ww.leven

seat.co.uk/in

dex_

files/Page714

.ht m    

http://w

ww.gree

ninvestm

entbank.

com/new

s-­‐and-­‐

insig

ht/201

5/scotl

and-­‐set-­‐for-­‐ne

w-­‐

first-­‐of-­‐k

ind-­‐

111m

-­‐recycling-­‐

and-­‐waste-­‐plant/

Page 23: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

1.62

 

Lisburn  En

ergy  

Recovery  

Form

er  Burn  

House  

rend

ering,  

Lisburn,  N.  

Ireland

 

Lisburn  

Northern  

Ireland

 

80,000

 

Energos  

Plan

ning  

perm

ission  

gran

ted  June

 20

13.  Finan

cial  

close  

completed

March

2015

Likely  to

 proceed  

http://w

ww.wast

e-­‐managem

ent-­‐

world.com

/article

s/20

13/07/green-­‐

light-­‐fo

r-­‐80

-­‐000

-­‐tpa-­‐waste-­‐to-­‐

energy-­‐

gasification-­‐plant-­‐

in-­‐northern-­‐

ireland

.htm

l  

1.63

 

New

 Earth  

Energy  

Kings  W

eston  

Lane

,  Av

onmou

th  

Bristol  

Englan

d  

90,000

 

13.0  

NEA

T  

Ope

ned  in  

Septem

ber  

2011

 

Ope

ratio

nal  

Plan

t  in  

operation.  

Some  

teething  

prob

lems.  

http://w

ww.ne

wearthsolution

s.co.uk/facilitie s-­‐

projects/m

icros

ites/avon

mou

t h/    

http://w

ww.sy

ngas-­‐

prod

ucts.com

/    http://w

ww.wa

ste-­‐

managem

ent-­‐

world.com

/arti

cles/201

3/06

/13-­‐mw-­‐rdf-­‐

pyrolysis

-­‐gasification-­‐

plant-­‐starts-­‐up-­‐ in-­‐

avon

mou

th.ht

ml

1.64

 

New

 Earth  

Solutio

ns  

Aren

a  Way  

Magna

 Roa

d,  

Canford  

Dorset  

Englan

d  

90,000

 

0.0  

NEA

T  

Will  not  be  for  

several  years  

Ope

ratio

nal  

Curren

tly  a  

prototype  

expe

rimen

tal  

unit.  Plans  to

 expa

nd  it  

even

tually.  

http://w

ww.new

ear

thsolutio

ns.co.uk/w p-­‐

conten

t/up

loads/20

12/08/Bo

ards-­‐

Canford-­‐rene

wable-­‐

energy-­‐boo

klet-­‐

web

.pdf  

1.65

 

Northacre  

Rene

wab

le  

Energy  (H

ills  

Group

)Northacre  

Indu

stria

l  Park  

Westbury  

Wiltshire

 

Englan

d  

160,00

0  

22.0  

Chinoo

k  Sciences  

Plan

ning  

application  

subm

itted

   De

cembe

r  201

4  

Facility  likely  to  

proceed  if  

plan

ning  

perm

ission  

gran

ted  

http://w

ww.hills-­‐

grou

p.co.uk/no

rthac

re-­‐ene

rgy/    

http://w

ww.chino

oksciences.com

/201

4-­‐20

-­‐10-­‐ne

w-­‐

techno

logy-­‐brin

gs-­‐

revolutio

n/#.VS

I8qB

PF87

M  

1.66

 

Orig

in  

Rene

wab

le  

Energy  

Magne

tic  

Park  

Harborou

gh  

Road

,  De

sborou

gh,  

Kettering  

Northam

pton

shire

 

Englan

d  

96,000

 

12.0  

Unkno

wn  

No  progress  

Plan

ning  

perm

ission  

gran

ted  

Novem

ber  

2012

.  

No  progress  

since  

plan

ning  

perm

ission  

gran

ted.  

http://w

ww.ori

ginren

ewablee

nergy.com/plan

ning_app

licatio

n.html

http://w

ww.ori

ginren

ewablee

nergy.com/abo

ut.htm

l  

1.67

 

Peel  In

vestmen

ts  

Bilstho

rpe  Bu

siness  

Park  

Eakrin  Roa

d,  

Bilstho

rpe  

Nottin

gham

shire

 

Englan

d  

97,000

 

8.0  

Alter  N

RG  Plasm

a  

Unkno

wn  -­‐  a

waitin

g  result  of  call-­‐in  

Plan

ning  permiss

ion  

gran

ted  Novem

ber  

2014

.    Ca

lled  in  by  

DCLG

 

Awaitin

g  results  

of  call-in.  P

ublic

he

arin

g in

Nov

embe

r 201

5  

http://w

ww.bbc.co.uk/

news/uk-­‐england

-­‐no

ttingham

shire

-­‐30

1135

48  

Page 24: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

1.68

 

Peterborou

gh  

Rene

wab

le  Ene

rgy  

Ltd  (PRE

L)  

Storeys  B

ar  Roa

d  

Fengate,  

Peterborou

gh  

Cambridgeshire

 

Englan

d  

650,00

0  

80.0  

Biom

ass  P

ower  Ltd  

grate  gasification  

Unkno

wn  

Plan

ning  permiss

ion  

gran

ted  Novem

ber  

2009

 

Compa

ny  acquired  

by  GEP

 Group

 &  

KNM  M

alaysia

.  No  

progress  to

 date,  

but  G

EP  app

lied  for  

supp

ly  of  R

DF  from

 Essex  CC

.  

http://w

ww.green

ener

gyparks.co.uk/en

ergy-­‐

park-­‐peterbo

rough  

1.69

 

Peterborou

gh  

Rene

wab

le  

Energy  Ltd  

(PRE

L)En

ergy  Park  

Sutton

 Brid

ge  

Centen

ary  Way,  

Sutton

 Brid

ge  

Lincolnshire  

Englan

d  

420,00

0  

60.0  

Biom

ass  P

ower  

Ltd  grate  

gasification  

Unlikely  to  

proceed  

Plan

ning  

perm

ission  

rejected

 March  

2015

 

Project  is  too

 large  with

out  

bene

fit  of  

econ

omy  of  

scal

e

http://w

ww.gree

nene

rgyparks.co.

uk/http://www.sh

olland

.gov.uk/do

iton

line/plande

v/d

etails.aspx?oref=

H18-­‐07

23-­‐12    

http://w

ww.brid

gew

atch.org.uk/en

ergy-­‐park-­‐

prop

osal.htm

l

1.70

 

PYRe

co  

South  Tees  EcoPark  

Middlesbrou

gh  

Tyne

 &  W

ear  

Englan

d  

60,000

 

Metso  pyrolysis  

Unkno

wn  

Need  to  ra

ise  fina

nce  

Heralded

 as  a

 breakthrou

gh  in  201

1,  

but  h

as  not  proved  to  

be  fina

ncially  viable  

with

out  g

overnm

ent  

supp

ort..  

http://pyreco.com/http:/

/www.waste-­‐

managem

ent-­‐      

http://w

ww.letsrecycle.c

om/new

s/latest-­‐

news/eu

rope

s-­‐first-­‐tyre-­‐

pyrolysis

-­‐plant-­‐plann

ed-­‐

in-­‐north-­‐

east/w

orld.com

/articles/

2013

/08/80

m-­‐tyre-­‐

recycling-­‐pyrolysis

-­‐project-­‐struggling-­‐to-­‐

finance-­‐teesside-­‐

plant.h

tml

1.71

 

Resource  

Recovery  

Solutio

ns  

(Sha

nks/Interse

rve)    

Wincham

 Lan

e,  

Northwich  

Cheshire  

Englan

d  

187,00

0  

Not  sp

ecified

 

Unkno

wn  

Non

e  

Not  likely  to

 proceed  

Prop

osed

 as  

part  of  the

 Ch

eshire  PFI  

tend

er.  Sha

nks  

was  elim

inated

.  

http://w

ww.nort

hwichguardian.co

.uk/ne

ws/47

5872

1.Planning_app

lication_

in_for_W

incham

_waste_p

la nt/  

1.72

 

Resource  

Recovery  

Solutio

ns  

(Sha

nks/Interserv e)

Sinfin  Integrated

Waste  Treatmen

t  Ce

ntre  

Sinfin  Lan

e,  

Osm

aston  

Derby  City  

Englan

d  

140,00

0  

11.1  

Energos  

Plan

ning  

perm

ission  

gran

ted  on

 app

eal  

Septem

ber  2

012.  

Reache

d  fin

ancial  

close.

Project  

proceeding  

http://w

ww.rrsderb

yshire.com

/new

s-­‐and-­‐med

ia/shanks-­‐

receives-­‐plann

ing-­‐

approval-­‐fo

r-­‐de

rby-­‐

waste-­‐m

anagem

ent-­‐

plant/    

http://w

ww.th

econ

structio

nind

ex.co.uk/

news/view

/interserv

e-­‐shanks-­‐signs-­‐

950m

-­‐derby-­‐w

aste-­‐

deal

1.73

 

SBS  Waste  Partnership  

Enviropa

rc,  Electra  

Road

,  Maydo

wn  

Electra  Ro

ad  

Derry  

Northern  Ire

land

 

140,00

0  

30.0  

Unspe

cifie

d  

Unkno

wn  

SBS  consortiu

m  

appo

inted  by  NW  

Region

 Waste  

Man

agem

ent  G

roup

 

Project  h

as  stum

bled

 du

e  to  delays  in  

consultatio

n  on

 NI  

waste  strategy.  It  is  n

ot  

clear  w

hat  w

ill  hap

pen.  

http://w

ww.northwestw

aste.org.uk/new

s/procure

men

t-­‐process-­‐for-­‐ne

w-­‐

waste-­‐fa

cilities-­‐reache

s-­‐ne

xt-­‐stage/    

http://w

ww.letsrecycle.co

m/new

s/latest-­‐

news/shanks-­‐con

sortium-­‐

preferred-­‐for-­‐56

0m-­‐ni-­‐

contract/  

Page 25: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

1.74

 

Scotgen    

Dovesdale  Farm

,  Carlisle  

Road

 

Ston

ehou

se,  Larkhall    

South  Lana

rkshire

 

Scotland

 

80,000

 

Unkno

wn  

BOS  Gasificatio

n  

Non

e  

Plan

ning  permiss

ion  

refused  May  201

4  

With

 Dar

gave

l plan

ning  re

fusal  and

 pe

rmit  with

draw

n,  

Planet  Engineerin

g  going  into  

receivership,  it  is  

unlikely  that  th

is  project  w

ill  proceed

.  

http://w

ww.heraldscotla

nd.

com/new

s/ho

me-­‐

news/waste-­‐firm

-­‐on-­‐brink-­‐

of-­‐closure.219

5534

3    

http://w

ww.bbc.co.uk/new

s/uk-­‐scotla

nd-­‐glasgow

-­‐west-­‐19

6440

55  

1.75

 

Scotgen  Du

mfries  L

td    (no

w  

Rank  Prospect)  

Dargavel  Stores,  Lockerbie  

Road

 

Dargavel,  D

umfries  

Dumfriesshire  

Scotland

 

40,000

 

2.0  

BOS  Gasificatio

n  

Expe

cted

 start-­‐up

 Autum

n  20

15  

Tempo

rarily  closed

 

Closed

 due

 to  a  fire,  

followed

 by  pe

rmit  

with

draw

al  by  SEPA

.  Ope

ratin

g  compa

ny  wen

t  ba

nkrupt  and

 project  

acqu

ired  by  Ran

k  Prospe

ct.  

Plan

t  being  re

vampe

d,  

expe

cted

 to  start  u

p  again  

late  201

5.  

http://w

ww.bbc.co.uk/new

s/uk-­‐

scotland

-­‐sou

th-­‐scotla

nd-­‐

2385

0895

   http://w

ww.letsrecycle.com/ne

ws/latest-­‐new

s/firm-­‐plans-­‐to-­‐

reop

en-­‐20m

-­‐scotgen

-­‐incine

rator/  

1.76

 

Shore  En

ergy  

251  Glasgow

 &  

Edinbu

rgh  Ro

ad  

Coatbridge  

North  Lan

arkshire  

Scotland

 

160,00

0  

20.0  

Chinoo

k  Sciences  

Expe

cted

 op

erationa

l  in  

2017

 

Plan

ning  

perm

ission  

gran

ted  May  

2011

 after  an  

appe

al.  U

nder  

constructio

n.Plan

t  expected  to  

be  ope

ratio

nal  

prior  to  RO

C  grace  pe

riod  

expires  3

1  March  

2018

.  

http://w

ww.sho

re-­‐

energy.co.uk/  

1.77

 

Sita  

Shep

perton

 Eco  

Park  

Charlto

n  Lane

,  Shep

perton

 

Surrey  

Englan

d  

60,000

 

5.0  

Outotec  

Plan

ning  

perm

ission  

gran

ted  Au

gust  

2014

.  Now

 und

er  

constructio

n.  

Part  of  Surrey  CC

 PFI.  Project  w

ill  

proceed.  

http://w

ww.sita

.co.u

k/ne

ws-­‐and-­‐

view

s/ou

r-­‐plans/charlto

n-­‐lane

     http://new

.surreycc.g

ov.uk/en

vironm

ent-­‐

housing-­‐and-­‐

planning/w

aste-­‐and

-­‐recycling/charlto

n-­‐lane

-­‐eco-­‐park-­‐and-­‐

othe

r-­‐site-­‐

developm

ents

1.78

 

Sita  (n

ow  Sue

z  En

vironm

ent)  

Ston

eyhill  Re

source  

Recovery  Park  

Ston

eyhill,  Peterhe

ad  

Aberde

enshire

 

Scotland

 

60,000

 

4.5  

BOS  Gasificatio

n  

Non

e  

Project  d

iscon

tinue

d  

Suez  se

em  to

 be

conc

entr

atin

g on

Ab

erde

en and

 are  

merely  transferrin

g  waste  to

 New

castle  upo

n  Tyne

 

http://w

ww.sita

.co.uk/do

wnloads/Stone

yhillLeaflet-­‐

1105

-­‐web

.pdf  

Page 26: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

1.79

 

Smith

s  (Gloucester)  

Ltd  

The  Old  Airfield,    

Moreton

 Valen

ce,    

Gloucestershire  

Englan

d  

30,000

 

3.8  

Unkno

wn  

 Unkno

wn  

Plan

ning  permiss

ion  

gran

ted  Septem

ber  

2011

.  No  progress  

There  do

es  not  se

em  

to  have  be

en  any  

progress  on  this  

project.  Size  now

 un

likely  to  be  viab

le

follo

win

g Cf

D sit

uatio

n.    

http://w

ww.m

ineraland

wasteplanning.co.uk/ne

ws/11

0010

4/revised-­‐

energy-­‐w

aste-­‐propo

sal-­‐

approved

-­‐gloucester-­‐

resource-­‐recovery-­‐

centre/    

http://glostext.g

louceste

rshire.gov.uk/mgA

i.aspx?

ID=405

4  

1.80

 

Spen

cer  G

roup

 

Clevelan

d  Street  (former  

ADM  Cocoa

 Plant)  

Dalto

n  Street    

Hull  

City  of  H

ull    

Englan

d  

200,00

0  

Unkno

wn  

MWH  

Unkno

wn  

Plan

ning  permiss

ion  

gran

ted  Octob

er  201

1.  

Awaitin

g  fin

ancial  close  

Project  a

warde

d  Re

gion

al  Develop

men

t  Fund

 Grant  of  £

19.9m,  

and  ha

s  won

 a  CfD  in  

2014

 allocatio

n  roun

d.  

Likely  to

 proceed

 once  

finan

cial  close  is  

reache

d.  

http://the

spen

cergroup

.co.

uk/          http://w

ww.waste-­‐

managem

ent-­‐

world.com

/articles/20

13/03

/31m

w-­‐w

aste-­‐gasificatio

n-­‐biogas-­‐ren

ewable-­‐ene

rgy-­‐

project-­‐hu

ll.html    

resource.co/bu

siness/articl

e/mwh-­‐treatm

entspe

ncer-­‐

grou

p-­‐preferred-­‐hu

ll-­‐efw-­‐

plant

1.81

 

Sunrise

 Ren

ewab

les  

King  Geo

rge  Do

ck    

Port  of  H

ull,  Hu

ll  

City  of  K

ingston  

upon

 Hull  

``England

 

52,000

 

8.0  

CHO  Pow

er  Plasm

a  

Unkno

wn  

Plan

ning  

perm

ission  gran

ted.  

Plan

s  with

draw

n  

Waste  woo

d,  so

 really  a  biomass  

project.      

http://w

ww.scuntho

rpetelegraph

.co.uk/pou

nd-­‐40m

-­‐ren

ewable-­‐

energy-­‐plant-­‐set-­‐

create-­‐50/story-­‐

1413

2200

-­‐de

tail/story.html    

http://w

ww.scuntho

rpetelegraph

.co.uk/pou

nd-­‐40m

-­‐ren

ewable-­‐

energy-­‐plant-­‐set-­‐

create-­‐50/story-­‐

1413

2200

-­‐de

tail/story.html

1.82

 

Sunrise

 Ren

ewab

les  

North  of  A

ncho

r  Basin  

Barrow

 Port,  Ba

rrow

 in  Furne

ss  

Cumbria  

Englan

d  

72,000

 

9.0  

CHO  Pow

er  Plasm

a  

Prob

able  com

pletion  20

17  

Plan

ning  permiss

ion  gran

ted  

Janu

ary  20

10,  but  cha

nge  

perm

itted

 Novem

ber  2

014    

Waste  woo

d,  so

 really  a  biomass  

project.  Plasma  gasification  is  

struggling  to  be  econ

omically  

viab

le.  C

hange  in  plann

ing  

perm

ission  prob

ably  ena

bles  

chan

ge  in  te

chno

logy.  W

ill  need  

to  com

plete  by  ROC  de

adline.  

http://w

ww.end

swasteandb

ioen

ergy.

com/article/132

1434

/biomass-­‐plant-­‐

power-­‐sub

marine-­‐parts-­‐wareh

ouse    

http://w

ww.m

ineralandw

asteplannin

g.co.uk/ne

ws/13

2779

3/ne

w-­‐con

sent-­‐

waste-­‐w

ood-­‐biom

ass-­‐plant-­‐takes-­‐

accoun

t-­‐ne

wer-­‐techn

ology/  

Page 27: The Growth of Advanced Conversion Technologies for the ...task36.ieabioenergy.com/wp-content/uploads/2016/06/... · The survey was carried out over March 2014 to March 2015. Initial

1.83

 

Sunrise

 Ren

ewab

les  

King  Geo

rge  Do

ck  

Port  of  Sun

derla

nd,  

Sund

erland

 

Tyne

 &  wear  

Englan

d  

72,000

 

9.0  

CHO  Pow

er  Plasm

a  

Plan

ning  permiss

ion  

gran

ted  De

cembe

r  201

1  

Waste  woo

d,  so

 really  a  

biom

ass  p

roject  

situa

tion  no

t  kno

wn  

http://ren

ewables.seen

ews

.com

/new

s/eu

roplasma-­‐to-­‐

complete-­‐de

velopm

ent-­‐of-­‐

four-­‐biomass-­‐plants-­‐in

-­‐uk-­‐

1642

38  

1.84

 

Sunrise

 Re

newab

les  

Barry  Do

cks  

Woo

dham

 Roa

d,  

Barry  

Glamorganshire  

Wales  

72,000

 

9.0  

CHO  Pow

er  

Plasma  

Unkno

wn  

Plan

s  with

draw

n  

Waste  woo

d,  so

 really  a  biomass  

project.    

.  

http://w

ww.barryan

ddistrictnew

s.co.uk/

news/latestne

ws/81

2774

1.Ba

rrybiomass

plantCom

panywith

drawsnew

planstho

ughapp

ealstilltogoahe

ad/  

1.85

 

Teal  Ene

rgy  

Man

or  W

ay  

Busin

ess  P

ark  

Man

or  W

ay,  

Swan

scom

be,  

Dartford  

Kent  

Englan

d  

250,00

0  

25.0  

Unkno

wn  

Plan

ning  

perm

ission  

gran

ted  

Septem

ber  

2014

,  but  called  

in  by  Secretary

ofState.

Outcomestill

awaited.

Controversial  

project.  

Depe

nds  o

n  de

cisio

n  of  

DCLG

.  

http://w

ww.baint

oncapital.com

/wa

ste-­‐gasification/    

http://w

ww.m

rw.

co.uk/ne

ws/teal-­‐

energy-­‐fu

ry-­‐at-­‐

swanscom

be-­‐call-­‐

in/867

2000

.articl e    

ww.plann

ingreso

urce.co.uk/article

/132

0448

/pickles-­‐

calls-­‐propo

sed-­‐

ebbsfle

et-­‐garde

n-­‐city-­‐ren

ewable-­‐

energy-­‐plant

1.86

 

Virid

or  

Polm

adie  

Recycling  Ce

ntre  

425  Po

lmad

ie  

Road

,  Polmad

ie  

Glasgow

 

Scotland

 

200,00

0  

20  +  heat  

Energos  

Commiss

ioning  

2016

 

Plan

ning  

perm

ission  

gran

ted  Janu

ary  

2013

.  Und

er  

constructio

n  

Und

er  con

tract  to  

Glasgow

 City

 Co

uncil.  Project  

will  proceed

.  

http://w

ww.virido

r.co.uk/ou

r-­‐de

velopm

ents/glasg

ow-­‐rrec/    

http://w

ww.waste-­‐

managem

ent-­‐

world.com

/articles/

2013

/12/virid

or-­‐s-­‐

154m

-­‐gasificatio

n-­‐biogas-­‐and

-­‐recycling-­‐facility-­‐

unde

rway-­‐in

-­‐glasgow.htm

lhttp://uk.prweb

.co

m/releases/20

12/8/

prweb

9762

229.htm

1.87

 

W  H  M

alcolm

 Ltd  

865  South  Street  

Glasgow

 

City  of  G

lasgow

 

Scotland

 

120,00

0  

Unspe

cifie

d  

Unkno

wn  

Unkno

wn  

Plan

ning  

application  

subm

itted

 March  

2015

 

Await  o

utcome  of  

plan

ning  

application.  

http://w

ww.m

alcolm

group

.co.uk/in

dex.asp