Page 1: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The Goal

A Process of Ongoing Improvement

Eliyahu M. Goldratt and Jeff Cox

Page 2: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The Goal

Characters:Alex Rogo – Plant Manager

Jonah – Physicist/Production Consultant

Bill Peach – Division VP of Manufacturing

Bob Donovan – Plant Production Manager

Lou ____ - Plant Controller

Stacey Potazenik – Production Control Manager

Ralph Nakamura – data processing manager

Page 3: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The Goal

Setting:City of Bearington – location?

Pennsylvania, Ohio, Indiana manufacturing town

UniCo Corporation Manufacturing Plant – – probably 15 years old– other impressions?

Page 4: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The Goal

Introduction: What’s your first impression of the manufacturing plant?

• Plant out of control• VP of manufacturing expediting an order• New robots• Controlled chaos• Good at “fighting fires”• Excellent at getting order filled when pressed• Lots of inventory

Page 5: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The Goal

Alex travels to corporate meeting with a bunch of “corporate speak”.

Alex begins daydreaming.

Page 6: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The Goal

Alex/Jonah Chance Meeting in Airport

Alex – “Robots increased productivity by 36% in one department”

Jonah – “Are plant inventories down?” : No

“Is employee expense less?” : No

“Shipping more product?”: No

Alex – “Must keep robots running to maintain efficiencies”.

Jonah – Then “Inventories must be sky high and orders must be late.”

Page 7: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The Goal

Alex/Jonah Chance Meeting in Airport – cont.

Jonah – “In your own words, what is productivity.”

Alex – “ Accomplishing your goals”.

Jonah – “Correct, then what is the goal of your company?”

Alex – “To be more productive?” : No

“To produce products?” : No

“To increase market share?”: No

Jonah – “How can you be productive? You don’t know the goal.”

Page 8: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The Goal

What does Alex determine “The Goal” is?

To make money!!

How do you know you are making money (Alex and Lou)?

• Net profit (Income-Expenses) • Return on Investment• Cash Flow

Why are each of these important?

Page 9: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The Goal

How do the “making money” measures translate to the production environment? (Jonah’s translation)

• Throughput – Is the rate at which the system generates money through “Sales”

• Inventory – all the money that the system has invested in purchasing things which it intends to sell.

• Operational Expenses – all the money the system spends in order to turn inventory into throughput.

Page 10: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The Goal

What was the common word in all three measurement definitions?

• Money going into the system

• Money stuck inside the system

• Money flowing out of the system

Page 11: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The Goal• Throughput – Is the rate at which the system generates

money through “Sales” • Inventory – all the money that the system has invested

in purchasing things which it intends to sell.• Operational Expenses – all the money the system

spends in order to turn inventory into throughput.

Where do the following fit?• Raw materials• Direct labor• Indirect labor• Tooling, machines, building• Knowledge gained by employees

Page 12: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The Goal

Alex meets Jonah in New York seeking help to determine steps to take in achieving the goal:

Jonah – “Do you run a balanced plant? Do you have any idle workers and is it good or not?”

Alex – “We try to keep all our employees productive”

Page 13: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The Goal

Jonah – “Impossible to perfectly balance capacity to demand, there even exists a mathematical proof showing if you did, inventories go through the roof?”

Alex – “How’s this possible”

Jonah – “Due to two phenomenon:

1. Dependent events – a series of events must take place before another begins.

2. Statistical Fluctuations – the length of events and outcomes are not completely deterministic.

The combination of these phenomenon are the issue.”

Page 14: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The Goal

Dependent events – Statistical Fluctuations

Q. - Where does Alex first come to grips with this (i.e. sees this first hand)?

A. – During the boy scout hike.

Page 15: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalAnalyzing the boy scout hike

Observations: • the walking speed of individuals fluctuate• All may have the same average walking speed,

but gaps continue to lengthen, why?• There is no limit to how much an individual can

slow down, but your top speed is dependent on the person in front.

• Fluctuations are accumulating over time, and the slow fluctuations tend to accumulate faster because they are not limited like the fast ones.

Page 16: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalBoy scout hike –> Manufacturing Plant

Observations: • Each boy is an operation• The product is “walk the trail”• Each boy/operation is dependent on the one in front.• A “sale” is when the last operation/boy walks the trail.• Throughput is the rate at which the last person walks the

trail.• Operating expense is the energy output of each boy.• Inventory (material inside the plant) is the distance between

the first and last boy.• Fluctuations in operating speed is causing inventory to

increase and causing throughput to decrease. Attempting to reduce gaps is increasing operating expense.

Page 17: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The Goal

Play the matches game?

• Setup: 5 players, 5 bowls, matches, 1 die• Dump all matches in bowl #1• Roll one die (starting with player #1) and pass that many matches

from your bowl to the next person down the line• Pass die to next player who rolls die and moves that number of

matches from their bowl to next player, cannot pass more matches than what is in your bowl.

• Continue for each player, with last player handing die back to player #1.

• What is the average number rolled on a die?• After 20 rounds, how many matches should the last player “produce”?

Page 18: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalBack to the Boy scout hike

After lunch the boy scouts “self-arrange” so that the fastest is up front and so on until Herbie is at the rear.

Q. What was the result?

A. Line got even longer.

Q. Did throughput improve (completing more miles)?

A. No, completed miles still dependent on last scout walking the trail, plus “inventory” has increased.

Observation: however, everyone is always walking (no one is idle). But goal is not being achieved.

Page 19: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalContinuing with the Boy scout hike

Q. How does Alex fix the boy scout hike?

A. Puts kids in order from slowest first to fastest last. The line then stays compressed (i.e. inventory has gone down and progress has improved because Herbie is setting the pace and doesn’t have to exert energy to catch up).

Q. How do they further improve throughput?

A. Off-loaded Herbie’s backpack. In oherwords, they improved Herbie’s throughput so the entire boy troop’s throughput improved.

Page 20: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalAlex’s First Chance to Test the Boy Scout Theory

Hilton Smyth’s order • needs 100 parts by end of day• Parts require 2 operations, fabrication then weld by robot• Each department averages 25 units per hour, with robot

working at almost exactly 25 unit pace.• Start fabrication at noon, transferring parts on the hour,

every hour.

Fabrication(25/hour)

Weld(25/hour)

Transfer(once/hour)

Page 21: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalAlex’s First Chance to Test the Boy Scout Theory

Expectation:

Hourly Part Count

Fabrication(25/hour)

Weld(25/hour)

Transfer(once/hour)

  noon 1:00 2:00 3:00 4:00

Fabrication 25 25 25 25  

Welding   25 25 25 25

Page 22: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalAlex’s First Chance to Test the Boy Scout Theory

Realization:

100

90

Hourly Part Count

Fabrication(25/hour)

Weld(25/hour)

Transfer(once/hour)

  noon 1:00 2:00 3:00 4:00

Fabrication 19 21 28 32  

Welding   19 21 25 25

Page 23: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalQ. So what have they learned to this point?

A. Have more capacity at downstream operations.

Page 24: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalQ. What does Jonah suggest they do next?

A. Distinguish between bottleneck and non-bottleneck resources.

Definition:

Bottleneck – any resource whose capacity is equal to or less than the demand placed upon it.

Non-bottleneck – any resource whose capacity is greater than the demand placed upon it.

Page 25: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalJonah then suggests balancing the flow of product through

the plant with demand from the market. Not to balance the capacities of operations with demand.

Q. What determines the flow of product through the plant.

• The bottleneck resources.

Page 26: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalThe next step for Alex and company is to identify the

bottlenecks (i.e. find Herbie).

Q. So how do you find a bottleneck in a manufacturing plant?

A. Go out on the floor and find the operation with the most inventory sitting in front of it.

Q. Is having a bottleneck a bad thing?

A. Not necessarily, all plants have to have a bottleneck.

Page 27: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalThe next step for Alex and company is to identify the bottlenecks

(i.e. find Herbie).

Q. Once the bottleneck is identified, can you simply move the machines/operations around like Herbie was moved to the front of the line?

A. No, production steps often cannot be reorganized.

Q. So how do you solve the problem of “moving Herbie to the front”?

A. Find more capacity for the bottleneck, don’t try to move them. Have enough capacity to meet demand.

Page 28: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalThe next step for Alex and company is to identify the bottlenecks

(i.e. find Herbie).

Q. How do you find more capacity?• Make sure it is never idle (focus your attention on it).

• Increase cycle time on the machine

• Add another duplicate machine

• Outsource to another vendor

• Reduce the demand (process change)

• Inspect part quality before bottleneck (make sure bottleneck only works on good parts)

• Ensure process controls on bottleneck are good so bad parts aren’t produced

• Don’t let it work on parts that aren’t needed.

Page 29: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalBack to the story:

Q. Where does Alex and company find the bottleneck?

A. They find two bottlenecks, NCX-10 and Heat Treat

Q. What is their first approach to improving the flow through the bottlenecks and ultimately improving productivity.

1. Move QC in front of bottlenecks.

2. Make a list of all late jobs and what components from those jobs flow through the bottleneck machines. They then create a schedule/list in due date order and instruct the bottleneck operators to only work on those jobs in that order.

Page 30: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalBack to the story:

Q. Does this scheduling system work (e.g. get late jobs completed while always keeping bottleneck running)?

A. No, because the late job components are not always waiting in front of the bottleneck machines.

Q. What do they do to rectify this?

A. Create a red tag (parts that travel through the bottleneck) / green tag system for all jobs throughout the plant such that any job with a red tag which arrives at a machine is given priority. If they are in the middle of a run, then if the run takes longer than 30 minutes to complete, stop that job and start the red tag job. If no red tags, then ok to process green tag jobs. If more than one red (or green tag), then process job with lower number on tag.

Page 31: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalBack to the story:

Q. What do they do next to further off-load the Herbies / bust the bottleneck?

1. Gold tags placed on parts that have traveled through the bottleneck everyone extra careful not to damage.

2. Dedicate personnel at NCX-10 and Heat Treat even though they are idle much of the time, just don’t let machine idle.

3. Send out some portion of heat treat parts to vendor in town.

4. Found old equipment (that is less efficient) to run in parallel to NCX-10.

5. Fully load furnace when possible (e.g. mix batches).

6. Reduce setup time with new fixtures.

7. Were able to process some parts differently so heat treat wasn’t required.

Page 32: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalBack to the story:

Q. What were the results of these bottleneck busting tactics?

1. New monthly shipping record from old record of 2 million to new record of 3 million.

2. 57 customer orders shipped versus old record of 31.

3. WIP Inventories reduced 12%.

Page 33: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalWhat happens next?

The bottlenecks are apparently expanding… material is backing up at the milling machines, and non-bottleneck parts (green tags) are not reaching assembly even though all bottleneck parts (red tags) are available at assembly.

Page 34: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalWhat happens next?

Jonah revisits plant and discusses relationship between bottleneck(X) and non-bottleneck(Y) machines.

1) Y X 3) Y A 4) Y Product A

2) X Y X S X Product B

S

E

M

B

L

Y

Page 35: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The Goal

Jonah believes the “new bottlenecks” are not real bottlenecks, but self-created bottlenecks. Why?

A. Material is being “released” to the plant just to keep the non-bottleneck machines busy. This improves these machines efficiency measures, but does not help the goal.

Jonah: “A system of local optimums is not an optimum system at all; it is a very inefficient system”.

Lesson: Do not try to make non-bottlenecks work all the time. They should be idle some of the time!

Page 36: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The Goal

So how do you go about fixing the problem of keeping the non-bottleneck machines working at the same rate as the bottleneck?

Recall the boy scout hike: Herbie is in the middle of the line and cannot be moved, so how do you keep the kid in the front walking at the same pace as Herbie?

Alex’s kids: use a rope and a drum.

Rope: Attach a rope from Herbie (bottleneck machine) to the kid at the front (assembly). The length of rope represents inventory.

Drum: Herbie tells the kid at the front to slow down or speed up (beats the drum). Need some kind of signaling or communication between assembly and the bottleneck.

Page 37: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The Goal

How is the rope and drum concept implemented in the plant?

• Identified it takes about 2 weeks from when parts are released to the floor until they get to bottleneck.

• Setup system that monitors when inventory is processed at the bottleneck. Material required 2 weeks later is then released to the floor.

• Non-bottleneck parts are released according using the same principle but tied to assembly.

BottleneckMaterial Release2 weeks lead time

Communicate release

Page 38: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The Goal

What is the result of this new release system?

• WIP is down.• Revenues are up.• Efficiencies dropped initially, but have come back up.• The backlog of orders is completely gone (satisfied customers).

How does management respond?

• Happy• Somewhat skeptical success will last• Wants 15% more revenue next month!!

Page 39: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalIn order to improve by another 15% what does Jonah suggest as the

“next logical step”?

• Cut batch sizes for non-bottleneck parts in half.

What is the impact of reducing these batch sizes?

• WIP for non-bottleneck parts reduced by half.• Significantly reduce time parts spend in plant. Leads to

increased responsiveness (from 6-8 weeks to 3-4 weeks).

What about the time to handle increased number of setup? Doesn’t matter if occurs on non-bottleneck operations.

Process Time Setup Time Queue Time Wait for Assembly Time

Time parts spend in the plant

Page 40: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalAlso to help get the 15%, Alex calls the marketing/sales

manager and bets him he can reduce lead time to fill orders. What does Alex expect to gain by reducing lead times to ship from what used to be 4 months to 4 weeks?

• Increased sales!!• The bottleneck had moved to customer demand.

Quick response on promised due dates should translate to a competitive advantage.

Page 41: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalEverything is going good now except it looks like part costs are going up.

However, in reality all costs have gone down. How can this be?

The accounting rules:• Cost per part = raw material + direct labor + burden cost• Burden cost is all the indirect labor costs.• Burden = direct labor x burden factor

Cost per part has risen because more setups are occurring because of smaller batch sizes.

However, workers were idle, so the increased number of setups didn’t really increase costs.

Page 42: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalWhat other performance measure made them not look as

good as they actually were.

Answer: Inventory

Inventory is counted as an asset on the balance sheet. When the plant worked hard to reduce inventories to improve their throughput and responsiveness, it looked as if their assets had fallen.

Page 43: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalSacred Cows Slaughtered:

• Worker efficiency• Optimal batch size• Releasing work to the floor to keep people busy• Accounting rules

Page 44: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalWhy Alex’s plant was successful:

Change in Focus

from the “cost world” to the “throughput world”

Cost

Throughput

Inventory

Throughput

Inventory

Cost

Page 45: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalWhat process did they use to shift their focus to the “throughput

world”?

The Theory of Constraints

Step 1: Identify the system’s constraints (NCX10 and oven)

Step 2: Decide how to exploit the system’s constraint (don’t take lunch break on bottleneck machines)

Step 3: Subordinate everything else to the above decision (red tags and green tags)

Step 4: Elevate the systems constraint (bring back old Zmegma machine, outsource heat treat)

Step 5: Warning!! If in a previous step, a bottleneck has been broken, go back to step 1 (material release system, marketing), but do not allow inertia to cause a system’s constraint (red and green tags eventually caused problems).

Page 46: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalFinal words from Alex on “how to be an effective

manager”:

Help people to identify:• “what to change?”• “what to change to?”• “how to cause the change?”

Page 47: The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox

The GoalFinally some Philosophy:

What approach did Jonah use to help Alex and the plant succeed? Find the answers/solutions by asking questions, the Socratic approach. Let others convince themselves of the answers, don’t just give it to them.

Also used a “common sense” approach which went against “common practice”. In other words, think!!