EU Workshop on QC/QA of greenhouse gas inventories and the establishment of national inventory systems. The German QA/QC programme. overview. QA/QC plan. QA/QC plan Quality control Quality assurance Verification Quality manual Quality management system Documentation, archiving - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: The German  QA/QC programme

Qualitäts-System Emissionen

1UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

EU Workshop on QC/QA of greenhouse gas inventories and the establishment of

national inventory systems

The German QA/QC programme

Page 2: The German  QA/QC programme

Qualitäts-System Emissionen

2UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

1. QA/QC plan

2. Quality control

3. Quality assurance

4. Verification

5. Quality manual

6. Quality management system

7. Documentation, archiving

8. Resources needed for QA/QC and QMS

9. National inventory system and annual inventory process

overview

1. QA/QC plan

Page 3: The German  QA/QC programme

Qualitäts-System Emissionen

3UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

QA/QC planQA/QC planobjectives of the national QA/QC programmeobjectives of the national QA/QC programme• To provide a transparent, consistent, comparable,

complete, accurate and timely inventory and inventory report to the UNFCCC and the EU Commision.

• To establish appropriate QA/QC-Procedures in order to comply with the requirements under the UNFCCC and the Kyoto Protocol.

• To provide assistance for the implementation of the German QA/QC Programme and for the improvement of the emission inventory preparation.

Page 4: The German  QA/QC programme

Qualitäts-System Emissionen

4UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

QA/QC planQA/QC planStage of development of the national QA/QC programme Stage of development of the national QA/QC programme

• Quality system on emission inventories (QSE) established 2003

• QA/QC hand book (final draft)

• QA-Plan, QC-Plan, improvement plan, inventory plan and QA/QC check lists are completed as draft and will be separate parts in one planning tool (planning and steering instrument - PlaSte)

• 2 training lessons for UBA (in January for inventory experts and in July 2004 for heads of sections)

Page 5: The German  QA/QC programme

Qualitäts-System Emissionen

5UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

Quality controlQuality controlImplementation of the requirements of the IPCC Tier 1 Implementation of the requirements of the IPCC Tier 1 general inventory level QC proceduresgeneral inventory level QC procedures

• routinely conduction of manual and automated QC only takes place in the single national entity so far.

• It is planned to enforce the QSE-hand book for UBA in September 2004 via an directive for the agency.

• The QC shall take place yearly and in parallel with the inventory preparation.

• Results shall be documented via checklists and in future also within the data base ZSE.

Page 6: The German  QA/QC programme

Qualitäts-System Emissionen

6UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

Quality controlQuality controlImplementation of the IPCC Tier 2 QC proceduresImplementation of the IPCC Tier 2 QC procedures

• Tier 1 and Tier 2 QC procedures will be implemented jointly for emission factors, activity data and emissions.

• Tier 1 and Tier 2 QC procedures are described as draft version in the German planning and steering instrument (PlaSte).

Page 7: The German  QA/QC programme

Qualitäts-System Emissionen

7UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

Quality controlQuality controldata collected by external organisationsdata collected by external organisations

• QC checks for emission estimates prepared by external institutions or data collected by external agencies, companies or consultants task is addressed in QA/QC hand book procedures are not yet established in practice obligation is indirectly addressed within the QC procedures for data collection of inventory experts•

difficulty: data collected by external organisations is beyond responsibility of inventory agency.A regulation to address this task will be needed!

Page 8: The German  QA/QC programme

Qualitäts-System Emissionen

8UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

Quality controlQuality controlPlanned procedure for choice of EFPlanned procedure for choice of EF• Assessment of the applicability of default EF

quality of country specific EF must be comparable or higher than default EF difference must be significant and due to country specific circumstances in the source category

• QC checks for country-specific emission factors reliable availability of data source time series since 1990 available uncertainty estimationsconvenient level of data documentation implementation of appropriate QC procedures

Page 9: The German  QA/QC programme

Qualitäts-System Emissionen

9UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

Quality controlQuality controlresults of QC checks which are already implementedresults of QC checks which are already implemented• Routine QC-checks were undertaken by the single

national entity for selected source categories of inventory 2004 according to a preliminary check list.

• The results showed difficulties in the transparency of the inventory as a consequence of the high degree of

- country specific EF and methods in the inventory- individual documentation practices- the high degree of inventory staff fluctuation.

• The experience was taken into account in the QA/QC concept and in the design of the advanced check list.

Page 10: The German  QA/QC programme

Qualitäts-System Emissionen

10UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

Quality Quality assuranceassurancereview procedures in place by personnel not directly review procedures in place by personnel not directly involved in the inventory compilation processinvolved in the inventory compilation process

• project on the development of the QSE (11/02 – 06/04): interviews with UBA experts on the state of inventory development of Improvement Plan (draft)

• planned cross country review with Finland in cooperation with the UNFCCC Sekretariat (08/04 in Fin, 10/04 in Ger)

• planned Workshop on the German national system on emissions inventories (NaSE) with NGO on selected issues (11/04)

Page 11: The German  QA/QC programme

Qualitäts-System Emissionen

11UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

Quality Quality assuranceassuranceresults of already implemented QA proceduresresults of already implemented QA procedures

• So far most of the QA procedures are undertaken by the single national entity (SNE).

• There is a good awareness about the inventory quality and actions to be undertaken to meet the requirements in the SNE. Outside the SNE awareness is growing but still not sufficiently developed.

• Information flow, clear responsibilities and quality control - including consequences - are crucial drivers for inventory improvement.

Page 12: The German  QA/QC programme

Qualitäts-System Emissionen

12UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

Quality Quality assuranceassuranceresults of already implemented QA proceduresresults of already implemented QA procedures

• Despite the big effort that had been made over the last two years, capacity building does not take place in the necessary quantity and quality.

• Experience of review procedures by personnel not directly involved in the inventory compilation process: the acceptance of findings as deficiencies increases but decreases with regard to solutions potential of direct use of results in the inventory process is restricted for inventory improvement, additional work and guidance by the SNE is necessary in any case

Page 13: The German  QA/QC programme

Qualitäts-System Emissionen

13UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

VerificationVerificationexternal verification processes implemented or plannedexternal verification processes implemented or planned

• Bilateral Meetings with industry associations (e.g. cement production, lime production)

• Research Projects involving industry associations (e.g. on F-Gases, derived fuels)

• project on the development of a national system:- comparison of German inventory with other national inventories- discussion of inventory and missing data with experts from industry associations, scientific institutions and independent experts (planned NaSE workshop).

Page 14: The German  QA/QC programme

Qualitäts-System Emissionen

14UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

Quality ManualQuality Manualelements of the Quality manual (QSE handbook)elements of the Quality manual (QSE handbook)

• objectives of the national QA/QC programme

• Procedural and institutional organisation of the QSE

• Guidance for the Uncertanty estimation (Tier 1 & 2)

• Guidance on documentation & on archiving

• Guidelines for data formats

• QA/QC-plan and QA/QC-check lists

• Improvement plan, inventory plan

Page 15: The German  QA/QC programme

Qualitäts-System Emissionen

15UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

Quality management systemQuality management systemObjectives, definitions and standardsObjectives, definitions and standards

• Integrated solution (joint concept)QA/QC as part of the inventory preparation process

• Practice relationQA/QC Procedures taking into account different organisational circumstances and experiences

• Issue oriented information and management system specific QA/QC Guidance for different roles multifunctional planning and steering tool (PlaSte)

defined objectives & minimum requirements but individual solutions

Page 16: The German  QA/QC programme

Qualitäts-System Emissionen

16UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

• Central System on Emissions (ZSE)

Provide data base

• Quality System on emission inventories (QSE) establish appropriate QA/QC procedures

Emission Inventory(CRF/NIR)

• Transparency,• Consistency,• Comparability,• Completeness,

• Accuracy,• Timeliness.

Quality management system (QMS)Quality management system (QMS)

National National ImprovementImprovement

Program Program

specific objectives, criterias, responsibilities and activities

National System (NaSE)National System (NaSE)

improvement activitiesimprovement activities

experiencesexperiences experiences & resultsexperiences & results

integrated concept for QA/QC & national system & inventoryintegrated concept for QA/QC & national system & inventory

Page 17: The German  QA/QC programme

Qualitäts-System Emissionen

17UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

Documentation, archivingDocumentation, archivingImplementedImplemented requirements for documentation and requirements for documentation and archivingarchiving

Verbesserungsmaßnahmen im

Inventarplan

Qualitätsziele

Methoden und Prüfkriterien in

Inventarbeschreibung

Einzelziele im

Qualitätskontroll-Plan

Einzelziele im

Qualitätssicherungs-Plan

Teilüberführung

direkte Korrektur

nein ja: Abgleich

nein

ja

Verbesserungsmaßnahmen im

Verbesserungsplan

Inventar, NIR

entsprichtBerichterstattung den

Qualitätszielen?

Aktualisierung

Korrektur einfachmöglich?

Einzelziele in

Checklisten zur QK/QS

Aktualisierung

Page 18: The German  QA/QC programme

Qualitäts-System Emissionen

18UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

• In the integrated concept, most of the staff is involved in QC as well as in inventory preparation and training. A clear distinguish of resources between QC and inventory preparation is not possible.

• The QSE has defined roles for the different functions which are attributed to Persons by source category.One person can be attributed to several roles.

• Since QC is only being started, overall resources cannot be calculated.

Resources requiredResources required

national QA/QC plan, development & implementation of national QA/QC plan, development & implementation of QMS & trainingQMS & training

Page 19: The German  QA/QC programme

Qualitäts-System Emissionen

19UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

• Roles in the single national entity: 1 NaSE coordinator (incl. NaSE workshops, training) 1 QA/QC coordinator (incl. QMS & QA/QC training) 1 data base coordinator (ZSE) (incl. software training) 1 NIR coordinator 8 source category specific contact persons

• Further roles in the inventory preparing agency: 6 contact persons (1 for each department)12 Persons in charge for quality control (heads)33 experts responsible for inventory preparation & QC

Resources involved at stateResources involved at state

national QA/QC plan, development & implementation of national QA/QC plan, development & implementation of QMSQMS

Page 20: The German  QA/QC programme

Qualitäts-System Emissionen

20UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

• Roles in other governmental institutions (for Agriculture and LULUCF): 2 contact personsNN Persons in charge for quality control3 experts responsible for inventory preparation & QC

• several non governmental staff involved in specific activities

Resources involved at stateResources involved at state

national QA/QC plan, development & implementation of national QA/QC plan, development & implementation of QMSQMS

difficulty: at state involved resources are less than resources required (especially outside the SNE)!

Page 21: The German  QA/QC programme

Qualitäts-System Emissionen

21UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

Quality control / Quality assurance

federal ministries and

institutions

Institutions of the German Länder

scientific institutions

Industry

independent experts

Single NationalEntity

(UBA)

general functions

reporting / information

information delivery

The German

NaSE shall involve all

German institutions with good expertise

on issues necessary for

inventory preparation.

NationalNationalinventoryinventorysystem:system:

Page 22: The German  QA/QC programme

Qualitäts-System Emissionen

22UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

National inventory systemNational inventory systeminstitutional arrangements and proceduresinstitutional arrangements and procedures

• All procedures are planned to be implemented in the whole institutional framework.

• existing institutional framework:- UBA- Working group on emissions inventories- topic area emissions inventories in the “CO2 reduction” interministerial working group- Working Group on Energy Balances of the Länder

• Missing institutional arrangements:subordinated governmental organisations (e.g. DESTATIS) & NGO (e.g. industry associations)

Page 23: The German  QA/QC programme

Qualitäts-System Emissionen

23UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

• The database system is the Central System on emission inventories (ZSE) on the basis of MESAP software.

• An improvement plan is to be set up by the QA/QC coordinator on indication of the experts responsible for inventory preparation & QC. A binding inventory plan is extracted of the improvement plan by the QA/QC coordinator in cooperation with source category specific contact persons of the SNE and inventory experts.

National inventory systemNational inventory system

Other aspectsOther aspects

Page 24: The German  QA/QC programme

Qualitäts-System Emissionen

24UBA II 5.3 - Germany EU Workshop on QC/QA of GHG inventories, 02.-03. Sept. 2004

• Expert judgements have been made according to the Guidance for the Uncertanty estimation but not for all source categories. The Documentation is not completed yet.

• The Acquiring additional resources to the establishment of the national inventory system is related to the Ministeries in charge according to their responsibilities.

• Additional legislation is considered necessary with regard to institutional responsibilities and financing.

National inventory systemNational inventory system

Other aspects (2)Other aspects (2)