the falls lake monitoring program - nc state university woolfolk and r. travis marion presented at...
TRANSCRIPT
3/28/2016
1
Durham – Where Great Things Happen
Upper Falls Lake Water Quality, 2010-2015
Michelle Woolfolk and R. Travis Marion
Presented at the WRRI Annual Meeting
March 18, 2016
The Falls Lake Monitoring Program
• Who monitors?
City of Durham’s Stormwater Quality Group
• Why do they monitor?
a requirement to satisfy the NDWRF permit
• Where do they monitor?
two locations for grab samples and two locations for photic samples
3/28/2016
2
Ellerbe
Creek
Ellerbe
Cove
I-85
SR-1801
North Durham Water
Reclamation Facility
0
1
2
3
4
5
6
7
2012 2013 2014 2015
De
pth
(m
)
Sampling Years
Avg. Depth
I-85
SR1801
3/28/2016
3
0
5
10
15
20
25
30
35
40
2012 2013 2014 2015
NTU
Sampling Year
I-85
SR1801
Avg. Turbidity (NTU)Avg. Turbidity (NTU)
State Standard
22
22.5
23
23.5
24
24.5
25
2010 2011 2012 2013 2014 2015
Ce
lsiu
s
Sampling Year
Avg. Surface Temperature
I-85
SR1801
3/28/2016
4
I-85 Bridge (2013)
Apr.10th May 30th
July 19th
Sept. 7th Oct.27th
De
pth
(m
)
I-85 Bridge (2015)
Apr.10th May 30th
July 19th
Sept. 7th Oct.27th
3/28/2016
6
April through October
Ellerbe Cove
I-85 Bridge
SR-1801
Ellerbe Cove
I-85 Bridge
SR-1801
April through October
3/28/2016
7
Are in-lake nutrient and
chlorophyll a levels better?.
Blue line: Best fit line
April through October monitoring
p=0.0019*
p=0.0055*
p=0.4658 Ellerbe Cove
I-85 Bridge
SR-1801
3/28/2016
8
p=0.0045*
p=0.2574
p=0.2269
Blue line: Best fit line
April through October monitoring
Ellerbe Cove
I-85 Bridge
SR-1801
p=0.1238
p=0.0004*
p=0.0001*
Blue line: Best fit line
April through October monitoring
Ellerbe Cove
I-85 Bridge
SR-1801
3/28/2016
10
25%36%
53%42%
53%
20%
2010 2011 2012 2013 2014 2015
Elle
rbe
Co
ve
I-85
Brid
ge
SR
-18
01
Brid
ge
44%
77%71%
35%
23%
45%
2010 2011 2012 2013 2014 2015
35%
23%13%
5%
2010 2011 2012 2013 2014 2015
Percent of samples exceeding 40 µg/L State Chlorophyll a Standard
Goal: 10% or less
Eno River
3/28/2016
12
NDWRF Effluent
Total Nitrogen, significant decrease
Total Phosphorus, significant decrease
p=<0.0001*
p= 0.0052*
Is the strategy working?.
3/28/2016
13
2010 20152009 2017
Falls Lake Watershed:Nutrient Management Activities
New D: New Development
Blue line: Best fit line
April through October monitoring
p=0.0019*
p=0.0055*
p=0.4658
I-85 Bridge
SR-1801
Ellerbe Cove
3/28/2016
14
Why are we monitoring?
(get higher resolution pic from
SAS)
Photo courtesy of SAS Institute
The most reliable way to anticipate the
future is to understand the present.
John Naisbitt, Author of Megatrends (1982)
Thank you foryour attention.
Michelle WoolfolkAssistant Water Quality Manager919.560.4326 [email protected]
R. Travis MarionWater Quality [email protected]