the evolution of local environmental planning for kangwon province government june.6.2007 dokyung...
DESCRIPTION
3 Where is the Kangwon Province in Korea?TRANSCRIPT
The Evolution of Local Environmental Planning
for Kangwon Province Government
June.6.2007
Dokyung Lee*, Muchoon Lee, Minho HongDepartment of Environmental Engineering
Yonsei University, South KOREAE-mail : [email protected]
22
Contents
1
2
3
4
Objectives
The Adoption of New Framework
The Study of Present local Environmental Planning
Korean Environmental Planning
5 The process of Kangwon’s Environmental Planning
33
Where is the Kangwon Province in Korea?
44
1. Objectives
To figure out the Problems of Environmental Planning.
To establish the System of the Korean Local Environmental Planning(LEP).
To organize the Environmental Planning effectively.
55
2. Korean Environmental Planning
The History of Korean National Environmental Planning.
The Background of Korean National Environmental Planning.
What’s Korean LEP?
The Background of Korea’s LEP.
Introduction of the Guideline of Korea’s LEP.
66
3. The Problems of LEP for Kangwon province
1. Responses are not aimed at achieving of Environmental Planning.
2. It’s difficult to estimate the effectiveness of Responses.
3. The Indicators are not related toThe projects occasionally.
LocalLocal Environmental Environmental
PlanningPlanning
77
4. The adoption of New framework - continue
DPSIGR??
DPSIR + G = “DPSIGR”DPSIR + G = “DPSIGR” “ “DPSIR” : The casual framework for describing the interactions DPSIR” : The casual framework for describing the interactions between society and the environment adopted by the EEA. between society and the environment adopted by the EEA. ““DPSIGR” : The framework for Local Environmental Planning.DPSIGR” : The framework for Local Environmental Planning. The aim of such an approach is :
To be able to provide information on all of the different elements in the “DPSIGR” chain. to demonstrate their interconnection. to estimate the effective of Responses.
88
ResponseDriving
force
Pressure
State
Impact
Goal
4. The adoption of New framework - continue
Interaction of “DPSIGR” ChainInteraction of “DPSIGR” Chain
99
Driving force
Pressure State Impact Goal
-Population-Economic growth-Industry Proportion-Transportation-Industry-Leisure sports-Road building
-Air pollutants -Energy consumption -Noise exposure -Waste production -Land use -Developing pressure
Environmental Condition-Air/atmosphere-Water-Land/soil-Wildlife/biodiversity-Natural resources-green space
Environmental-Contaminations-Forestry destroyEconomic-Slowdown of The Tourist Industry
-Goal-Indicator
Responses
Examples •Expand the Conservative projects of forestry.•Conservation and management of wildlife sanctuary. •Development the Natural vacationland.
4. The adoption of New framework
1010
The Example of Projects Decision
issues Goals Indicators ProjectsWater Quality
Management of water for water resources conservation
Grade 1 : BOD Management of The Organic Matter
Forestry Destroy
Restoration of destroyed forestry
The Percentage of Restoration of Destroyed Forestry(%)
Expand of The Natural conservative site
1111
5. The process of Kangwon Local Environmental Planning
The Final Goal
D, P, S, I
S The Issues
The Goals for the Issues
Indicators
Projects
54
3
Economy Environment
Life Environment
Civilization Environment2
1G
G
R
Natural EnvironmentInvestigation and Analysis
1212
Conclusions
Explain the system of Korean Environmental Planning. Find out the Problems of Local Environmental Planning. And, We are trying to establish the System of Korean Environmental
Planning, As the alternative. On account of The “DPSIGR” chain reacts mutually , We can see the
Interaction of “DPSIGR” chain easily and find out the proper projects for Indicators.
Consequently, The “DPSIGR” chain works on reporting of LEP and It helps decision maker, public see environmental, economic, and other issues as interconnected.
THANK YOU FOR YOUR ATTENTION~!THANK YOU FOR YOUR ATTENTION~!