Page 1: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

The The Design-Build ExperienceDesign-Build Experience

Page 2: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

I-95 HondaInterchange$ 8 million

Wateree River $ 8 million

Reedy & Enoree Bridge $ 3 million

SC 170 Widening$100 million

Cooper River Bridges$ 531 million

Conway Bypass$ 386 million

Southern Connector$ 206 million

Carolina Bays Parkway

$232 million

Page 3: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

Reedy River BridgeReedy River Bridge

Enoree River BridgeEnoree River Bridge

•First Design-Build Bridge Replacement in SC

•First Design-Build Project to Start Construction in SC

1996 RFP Process

Two Bridge Replacements

$ 3 million

Designer

Wilbur Smith Associates

Page 4: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

Cost SummaryCost Summary Estimate for Design-Bid-BuildEstimate for Design-Bid-Build $ 3,222,000$ 3,222,000

Design-Build PriceDesign-Build Price $ 3,125,000$ 3,125,000

Time SummaryȹEstimated Design-Bid-Build 628 Days �Design-Build 581 Days

Page 5: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

Wateree River Bridge

Bridge Replacement

$ 8 million

RFP Process - 1997

Designer

Ralph Whitehead & Assoc.

Page 6: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

Wateree Cost SummaryWateree Cost Summary Estimated Design-Bid-Build Estimated Design-Bid-Build $ 9,162,000 $ 9,162,000

Design-Build PriceDesign-Build Price $ 7,956,000 $ 7,956,000**

* Includes $50,000 for SCDOT Preliminary Engineering &* Includes $50,000 for SCDOT Preliminary Engineering &

$50,000 for Construction Monitoring$50,000 for Construction Monitoring

Wateree Time SummaryWateree Time Summary Estimated Design-Bid-BuildEstimated Design-Bid-Build 967 Days 967 Days Design-BuildDesign-Build 457 Days 457 Days

Page 7: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

HONDA INTERCHANGE

New Interchange

Bridge Replacement

$ 8 million

RFP Process - 1998

Designer

Consoer Townsend Envirodyne

Total Timeframe – 11 Months

Page 8: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

HONDA INTERCHANGE

Total Tracts – 1Condemnation Rate – 0%

Page 9: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

CONWAYBYPASS

New Location Freeway28 Miles in Length

Fluor Daniel$386 Million39 Months

RFP Process - 1994

Contract Signed - 1998

Page 10: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

Conway Bypass

Total Parcels – 233Condemnation Rate – 49%

Page 11: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

SOUTHERNCONNECTOR

Greenville County, SC

New Location Toll Road16 Miles in LengthInterwest Carolina Group$206 Million45 MonthsMaintenance by SCDOTToll Collection/Operation by Interwest

RFP Process - 1995

Contract Signed - 1998

Page 12: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

SOUTHERNCONNECTOR

Total Parcels – 160Condemnation Rate – 46%

Page 13: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

SC 170 Widening

Beaufort County, SC

12.5 mile widening2 miles of bridges

Includes Right of Way Acquisition$80 million

RFQ – RFP Process - 1999

Designer

Lawrie & Associates

Page 14: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

SC 170 WideningSC 170 Widening

Total Parcels – 129Total Parcels – 129Condemnation Rate – 23%Condemnation Rate – 23%

Total Timeframe – 36 MonthsTotal Timeframe – 36 Months

Page 15: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

Carolina Bays Parkway

Horry County, SC

New Location Freeway

22 miles in Length

Includes Right of Way Acquisition

$232 million

RFQ – RFP Process - 1999

Page 16: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

Carolina Bays Parkway

Total Parcels – 74

Condemnation Rate – 46%

Page 17: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

Cooper River BridgeCooper River Bridge

Two Bridge Replacements - $ 531 million

Charleston, SC

Page 18: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

Total Parcels – 93Condemnation Rate – 19%

Timeframe – 60 Months

Page 19: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

• Accelerated project completion.

PROS OF DESIGN BUILD

• Generally, final cost less than initial cost estimate.

• Benefit of having facility available to public.

• Positive public perception.

Page 20: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

• Reduced timeline for Right of Way acquisition.

CONS OF DESIGN BUILD

• Increased condemnation perception.

Page 21: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

• R/W acquired and cleared in accordance with Uniform Relocation Assistance and Real Property Policies Act of 1970, as amended, and state R/W procedures.

FHWA Requirements

• R/W certification must be submitted to and approved by FHWA prior to work commencing on individual tracts or entire project.

Page 22: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

FHWA Requirements

• Request for R/W services must be included in request for proposals.• Design/Builder must submit written acquisition and relocation procedures to STD for approval; should contain appraisal, acquisition, and relocation strategy.

Page 23: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

Role of SCDOT

• Develop a concise RFP.

• Provide an on-sight R/W Project Manager as single point of contact with authority to approve all settlements and provide tract certification.• Provide constant oversight to insure all federal guidelines are adhered to.

Page 24: The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million

Lessons Learned

• Assign Project Manager and authorize to approve just compensation, appraisals, relocation, administrative adjustments, etc.

• Establish “critical path” for construction and stage R/W and relocation accordingly.

• Identify new methods to handle R/W issues; i.e., purchase of improved property without appraisal including establishment of total benefits to landowner, use of auction company for disposal of 14 homes (less than 3 years old).