the delaware offshore wind park: project overview
TRANSCRIPT
![Page 1: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/1.jpg)
1
The Delaware Offshore Wind Park:
Project Overview
![Page 2: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/2.jpg)
2
The Bluewater Wind Team
• Bluewater Wind is an offshore wind park developer with offices in DE, MD, NJ, NY, and RI.• Bluewater is supported by Babcock & Brown, the 4th largest wind energy developer in the world, 4th largest in US, which recently purchased a controlling interest in the company. • B&B currently operates 20 wind parks across 9 states totaling over 1,500 MW.
![Page 3: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/3.jpg)
3
Current project statusJuly 8th MMS Issued Draft Rules and EA
July 16th MD Governor O’Malley announced his state’s interest in procuring energy from the Delaware project
July 31st The PSC, DNREC, Controller General and OMB voted in favor of the power purchase agreement negotiated between Bluewater Wind and Delmarva Power
Bluewater Wind will now begin working with state and federal agencies on the permitting process, and identify offtakers to purchase energy and RECs
![Page 4: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/4.jpg)
4
Delaware Project• Project Size: 230 - 450 MW (up to 150 turbines)
• Closest turbine: about 13 highway miles east of Rehoboth
• Transmission cable: connected to the Indian River substation via the Bethany substation
• Offshore Construction Start Date: Expected 2012
• Completion Date: Expected 2012 – 2013 (depends on project size)
![Page 5: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/5.jpg)
5
Location of Delaware Project
![Page 6: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/6.jpg)
6
Wind Park Development• Pre-construction
– Avian Radar Studies– Geophysical Investigations– Geotechnical Investigations– Wind & Wave Sensor
Deployment– Met Tower Installation– Development of Staging Port
• Construction– Sub-sea Electrical Cable
Installation– Foundation Installation– Offshore Substation
Installation – Onshore Cable Installation– Turbine Installation
• Post-Construction– O&M Activities– Decommissioning
![Page 7: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/7.jpg)
7
Optimal Wind Park Approval Schedule
• Pre-Application Agency Coordination 1/08 – 6/09• Avian Surveys 1/08 – 11/09• Other Environmental Surveys 3/08 - 11/09• MMS application Prep and Filing 5/08 - 11/09• MMS NEPA Review Process 12/09 – 3/11• MMS OCS ROD and Lease 4/11 – 6/11• DNREC CZM Consistency Determination 10/09 – 4/11• Other Federal Approvals 12/09-11/10• Other State, County, and Local Approvals 1/10 – 5/11• Notice to Proceed to Construction 5/11• Begin Construction 6/11
![Page 8: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/8.jpg)
8
Economic impact during construction•Min. $800 million investment
•Up to 500 local union jobs during construction, $90 - $180 million in direct wages
•Up to 780 indirect jobs
•$238 million in GDP for Delaware (2 yr. const.)
•$38.5 million in transmission line upgrades
•$7.2 million direct economic impact for the Port of Wilmington
![Page 9: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/9.jpg)
9
Economic impact during operation & maintenance
• Up to 80 direct union O&M jobs, and 200 indirect jobs for 25 years, $12.3 million in wages and salaries each year (direct and indirect jobs)
• $1.5 million in state and local taxes paid each year by employees (direct and indirect)
![Page 10: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/10.jpg)
10
Other economic development benefits
• Bluewater has committed to a $150K grant to DelTech for training wind turbine technicians
• Enhanced tourism with new sightseeing, recreational fishing and sport diving opportunities
• Offshore wind parks in Europe have resulted in a net increase in tourism and those with visitor centers have become tourist attractions
• Enhanced ability to recruit renewable energy companies
![Page 11: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/11.jpg)
11
Pre-Construction Phase
![Page 12: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/12.jpg)
12
Permitting studies • Avian studies • Marine biological studies (mammals,
finfish, turtles, shellfish)• Benthic and fisheries habitat assessment• Water quality studies• Cultural surveys• Navigation and FAA studies• Wetlands and other terrestrial systems
![Page 13: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/13.jpg)
13
Geotechnical Investigations
• Drilling Boreholes from stationary platform
Anticipated:
– Preliminary: 6 drill locations - Summer 2009– Detailed: drill @ turbine locations – 2010
• Vibracoring along cable routeStationary or floating platform
![Page 14: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/14.jpg)
14
Geophysical Investigations Towed Sonar Array
• Bathymetric and sub-bottom profile at turbine locationsAnticipated: Summer 2009
• Sub-bottom profile along export cable routeAnticipated: Summer 2009
Image source: www.alpineocean.com Image source: http://oceanexplorer.noaa.govImage source: www.alpineocean.com
![Page 15: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/15.jpg)
15
Met Tower Installation
![Page 16: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/16.jpg)
16
Met Tower Installed on Fixed Foundation(Various Examples)
![Page 17: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/17.jpg)
17
Met Tower Installed on Jack-up Barge(conceptual sketch)
![Page 18: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/18.jpg)
18
Port Staging AreaA 25 – 30 acre site located in the Coastal Zone to be used
as a laydown area for towers, nacelles, foundations, and blades
![Page 19: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/19.jpg)
19
Construction Phase
![Page 20: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/20.jpg)
20
Typical Monopile Installation
![Page 21: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/21.jpg)
21
Example of Installation Vessel
![Page 22: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/22.jpg)
22
Example Cable Laying Vessel Working at Windfarm
Image source: www.hornsrev.dk
![Page 23: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/23.jpg)
23
Offshore Transformer Installation
![Page 24: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/24.jpg)
24
Post-Construction Phase
![Page 25: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/25.jpg)
25
Operation & Maintenance Port• Two scenarios under consideration
– an operations building with 4 – 5 boat slips
– boat slips at one location and an operations facility at another
• Operations facility would be comprised of offices and an adjacent small parts/tools storage building
• 24 x 7 operation
• Training facility for workers and visitors center
![Page 26: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/26.jpg)
26
Example of an O&M Vessel Accessing a Wind Turbine
![Page 27: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/27.jpg)
27
Decommissioning the wind park
• At the end of project life, turbines will be removed• Decommissioning process is roughly the reverse of the
construction process and has similar heavy equipment needs
• Guidance will be provided in the final MMS Rule, a draft of which was released last month. 60-day comment period ends in September.
• Bluewater Wind will comply with all aspects of the MMS Rule concerning decommissioning, including financial requirements and bonding to ensure proper decommissioning
![Page 28: The Delaware Offshore Wind Park: Project Overview](https://reader034.vdocuments.us/reader034/viewer/2022052607/589eedc91a28abcc4a8c183e/html5/thumbnails/28.jpg)
28
Thank You