the cern-jinr collaboration j. engelen march 27, 2006
DESCRIPTION
The CERN-JINR Collaboration J. Engelen March 27, 2006. CERN - JINR Collaboration. From (before) NA4 to the LHC Programme Also: NA48, NA48/1, NA48/2 , NA48/3 HARP COMPASS DIRAC. х 10 -4. 35. 30. KTeV. 25. NA31. 20. 15. 10. NA48. E731. 5. 0. 1993. 1993. - PowerPoint PPT PresentationTRANSCRIPT
From (before) NA4 to the LHC Programme
Also: NA48, NA48/1, NA48/2NA48/2, NA48/3 HARP COMPASS DIRACDIRAC
CERN - JINR Collaboration
Re(’) = (14.7 2.2) 10-4
Experiments NA48, NA48/1, NA48/2 (SPS @ CERN)
LKr cryostat – first ISTC - CERN CP-violating parameter in K0 2 decays
+ 23 t of Krypton-Russian Industry for CERN experiment
05
101520253035
1993 1993 1999 2001 2002 2003
E731
NA31KTeV
NA48
х 10-4
Cusp Effect
M(π0π0), GeV/c2
K ± -> π±π0π0
(a0-a2)m(π+) = 0.264 ± 0.015 AAgg
00 = (1.8 ± = (1.8 ± 2.6)2.6)1010-4-4
““Charged” mode Charged” mode KK±±33±±
““Neutral” mode KNeutral” mode K±±0000±±
New NA48/2 results on direct CP-violating charge
asymmetry in K±3 slopes
First Observation KS 0e +e –
KS 0KS 0γγ
AAggcc =(1.7 ± 2.9) =(1.7 ± 2.9)1010--
44
JINR
The LHC Transverse Damping SystemThe LHC Transverse Damping SystemCERN – Russia - JINR
CMSCMS
LHCbLHCb
LHC DamperLHC Damper
ATLASATLASALICEALICE
Transverse Damping System Transverse Damping System is a feedback with a real-time digital signal processing for:• damping of transverse injection
oscillations,• feedback curing transverse coupled bunch
instabilities,• excitation of transverse oscillations for beam
measurements and other applications. The Damper is in the list of the systems that
must operate already for first beam injection. Therefore the schedule of construction and installation of the Damper in the machine must be completed in 2006 and testing in the accelerator will start in November 2006.
JINR’s obligations:• 20 deflectors (kickers) & 20 twin-amplifiers.
18 kicker tanks (9 modules) assembledwaiting for bake-out by AT-VAC in hall 113
(March 22, 2006)
The LHC Damper: kickersThe LHC Damper: kickersJINR
CERN team between finished moduleswishing to congratulate their JINR colleagues for their achievement
After three weeks of hard work by the JINR team on visit at CERN 18 kicker tanks (9 modules) are finally finished
LHC Damper: future plansLHC Damper: future plans During 2006 the following items During 2006 the following items
must be completed:must be completed:
series production of 15 wideband twin power amplifiers and their series production of 15 wideband twin power amplifiers and their testing at the specialized test stands of LPP (JINR) and AB/RF testing at the specialized test stands of LPP (JINR) and AB/RF (CERN)(CERN)
assembly of two spare kicker tanksassembly of two spare kicker tanks vacuum bake-out of 20 kickers/deflectors at CERN vacuum bake-out of 20 kickers/deflectors at CERN
by AT/VAC (April 2006)by AT/VAC (April 2006) transportation and installation of 4 units (=8 modules) in the LHC transportation and installation of 4 units (=8 modules) in the LHC
tunnel in July 2006 as well as hardware commissioning in tunnel in July 2006 as well as hardware commissioning in November 2006.November 2006.
Participation in beam commissioning in 2007 and in Participation in beam commissioning in 2007 and in future electronics design is being discussed.future electronics design is being discussed.
JINR
The CMS DetectorThe CMS Detector
MUON BARREL
Silicon MicrostripsPixels
ECAL Scintillating PbWO4 crystals
Cathode Strip Chambers Resistive Plate ChambersDrift Tube
Chambers Resistive Plate Chambers
SUPERCONDUCTINGCOIL
IRON YOKE
TRACKER
MUONENDCAPSTotal weight : 12,500 t
Overall diameter : 15 mOverall length : 21.6 mMagnetic field : 4 Tesla
HCAL Plastic scintillator/brasssandwich
CALORIMETERSSpokesperson: M. Della Negra
CMS2JE Feb06
CMS SolenoidMagnet reached nominal operating temperature for the first time on 25 Feb.Cooldown took 24 days. Energize in May.
Cool-down achieved by pumping helium gas at liquid nitrogen temperature (-196oC) and then as liquid helium.
Coil: 14.5t sc cable, 74t pure Al, 126t high strength Al
300
210
120
0
max
15/23/2 25/2
min
K
CMS2JE Feb06
CMS Endcaps
Lower in September
CSCs and RPCs on YE+1RPCs on YE+2
Diameter 25 mBarrel toroid length 26 mEnd-cap end-wall chamber span46 mOverall weight 7000 Tons
ATLAS (spokesperson Peter Jenni)
Barrel Toroid installation statusThe mechanical installation is complete, electrical and cryogenic connections are being made now, for a first in-situ cool-down and excitation test in spring 2006
Barrel Muon MDTs
Installation of barrel muon station
A major effort is spent in the preparation andtesting of the barrel muon stations (MDTs andRPCs for the middle and outer stations) beforetheir installation in-situ
The electronics and alignment system fabrications for all MDTs are on schedule
MDT Chamber Production (w/o EE)
0
200
400
600
800
1000
1200
Jan-00 Jan-01 Jan-02 Jan-03 Jan-04 Jan-05 Jan-06 Jan-07Time
No.
Cha
mbe
rs
Bare MDTPlan Bare MDTIntegrated MDTTested MDTInstalled MDTPlan Installation
20/04/2005 18th RRB J. Schukraft
ALICE ALICE DetectorDetector
TPCTPC
PHOSPHOS
Muon armMuon arm
TOFTOF
TRDTRDHMPIDHMPID
PMDPMD
ITSITS
ACCORDEACCORDE
Spokesperson J. Schukraft
ALICE Magnet field mappingALICE Magnet field mapping
This very fruitful and successful collaboration
has an excellent future, in particular with
the LHC and the LHC experiments now very
near to completion with start of operation
in 2007