The Central Mississippi River BasinLTAR Site Infrastructure
John Sadler, Ken Sudduth, Bob Lerch, Claire Baffaut, Newell Kitchen, Scott Drummond
USDA-ARS Cropping Systems and Water Quality Research,
Columbia MO
![Page 2: The Central Mississippi River Basin LTAR Site Infrastructure - Sadler](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d2f1a7bb61eb0f2f8b4594/html5/thumbnails/2.jpg)
CSWQRU
AmeriFlux (Forested)
Tucker Prairie
Prairie Forks CA
NRCS PI Center
MU Greenley RC
MU HARC
MU RC’s
Goodwater Creek EW
Mark Twain Lake
![Page 3: The Central Mississippi River Basin LTAR Site Infrastructure - Sadler](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d2f1a7bb61eb0f2f8b4594/html5/thumbnails/3.jpg)
Goodwater Creek EW
Young’sCreek
Lower Long Branch (USGS)
Upper Long Branch
CSWQRU
South Fork Salt R
(USGS)
![Page 4: The Central Mississippi River Basin LTAR Site Infrastructure - Sadler](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d2f1a7bb61eb0f2f8b4594/html5/thumbnails/4.jpg)
Centralia(pop ~4200)
Weir 11
Weir 9
Weir 1
Field 1 (ASP)Field 3 (BAU)
Field 2
GW Well Nest
![Page 5: The Central Mississippi River Basin LTAR Site Infrastructure - Sadler](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d2f1a7bb61eb0f2f8b4594/html5/thumbnails/5.jpg)
Shop, Storage
30 Plots0.34 ha
18 Flumes
Field 1ASP
Field 1Weir
GW Well nests
Weatherstation
FluxTower
X
![Page 6: The Central Mississippi River Basin LTAR Site Infrastructure - Sadler](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d2f1a7bb61eb0f2f8b4594/html5/thumbnails/6.jpg)
Long-Term Agro-ecosystem Research in the Central Mississippi River Basin
• Special Section of the Journal of Environmental Quality, 2015, Vol 44:3-96– Introduction and overview– Weather data– Flow data– Herbicide data– Nutrient data– With extensive supplemental online
materials– Plus 4 papers on research, in
groundwater, stream, and lake nutrients, and in modeling in the GCEW
– Supplemented by earlier papers in other journals on sediment data, methods, and production systems
![Page 7: The Central Mississippi River Basin LTAR Site Infrastructure - Sadler](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d2f1a7bb61eb0f2f8b4594/html5/thumbnails/7.jpg)
Upgrades
• Stream flow, sampling, and telecommunications– Lower Long Branch, Upper Long Branch, Young’s
• From seasonal to full-year• Telecommunications by cellular modem
– Weir 11 and Field 3• Weirs in place from prior era - install samplers• RF450 telecommunications
– Weir 1 and Field 1• Currently full-year – just upgrade samplers• RF450 telecommunications
![Page 8: The Central Mississippi River Basin LTAR Site Infrastructure - Sadler](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d2f1a7bb61eb0f2f8b4594/html5/thumbnails/8.jpg)
Goodwater Creek EW
Young’sCreek
Lower Long Branch (USGS)
Upper Long Branch
CSWQRU
South Fork Salt R
(USGS)
Weir in place, re-commissioned
Sampler and comm upgrade
Seasonal > full-year and comm
![Page 9: The Central Mississippi River Basin LTAR Site Infrastructure - Sadler](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d2f1a7bb61eb0f2f8b4594/html5/thumbnails/9.jpg)
Telecommunication Upgrades
• Broadband link to the site– 6 Mbps up, 2 Mbps down
• Wifi at 5 GHz standard within field site– Security cameras, plot flowcams, phenocams– Smartphone access to data from servers, and to internet
• CSI RF450 network at 2.4 GHz– Raingauge network, Weather station, GCEW Weirs, Flux towers,
other outlying sites• CSI RF416 network at 2.4 GHz
– Plot flow, samples, other plot equipment• Cellular modems
– Three largest stream sites – too distant for RF450 network
![Page 10: The Central Mississippi River Basin LTAR Site Infrastructure - Sadler](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d2f1a7bb61eb0f2f8b4594/html5/thumbnails/10.jpg)
Broadband,WiFi, and RF4xxCommunications
![Page 11: The Central Mississippi River Basin LTAR Site Infrastructure - Sadler](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d2f1a7bb61eb0f2f8b4594/html5/thumbnails/11.jpg)
Common Experiment
• ASP – Aspirational – Field 1– CSW rotation currently, no-till with cover crop– Done by ARS staff– VR Nutrients by crop sensing and soil sampling– Surface flow and sampling in place (upgrading)– Established Flux Tower there in 2015
• BAU – Business As Usual – Field 3– Mulch-till corn-soybean rotation– Done by local producer– Weir exists, establish flow measurement and sampling– Will target Flux Tower in 2016
![Page 12: The Central Mississippi River Basin LTAR Site Infrastructure - Sadler](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d2f1a7bb61eb0f2f8b4594/html5/thumbnails/12.jpg)
Weather Station - Specific local tests
• Historical vs ongoing LTAR instruments• Rain gauges– Weighing vs tipping bucket– Shielded vs unshielded
• Soil moisture– Stevens Hydroprobes in SCAN station– CSI probes for comparison at each depth
• Non-contact water stage sensors for bridges
![Page 13: The Central Mississippi River Basin LTAR Site Infrastructure - Sadler](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d2f1a7bb61eb0f2f8b4594/html5/thumbnails/13.jpg)
![Page 14: The Central Mississippi River Basin LTAR Site Infrastructure - Sadler](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d2f1a7bb61eb0f2f8b4594/html5/thumbnails/14.jpg)
![Page 15: The Central Mississippi River Basin LTAR Site Infrastructure - Sadler](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d2f1a7bb61eb0f2f8b4594/html5/thumbnails/15.jpg)
Thank you!