the cbm/hades/panda-dirich project and experiences with...

17
The CBM/HADES/PANDA-DiRICH Project and Experiences with the Series Production The CBM/HADES/PANDA-DiRICH Project and Experiences with the Series Production Michael Traxler, GSI 2018-11-06

Upload: others

Post on 31-Oct-2019

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The CBM/HADES/PANDA-DiRICH Project and Experiences with ...indico.gsi.de/event/7836/contribution/1/material/slides/0.pdfThe CBM/HADES/PANDA-DiRICH Project and Experiences with the

The CBM/HADES/PANDA-DiRICH Project and Experiences with the Series Production

The CBM/HADES/PANDA-DiRICH Project andExperiences with the Series Production

Michael Traxler, GSI

2018-11-06

Page 2: The CBM/HADES/PANDA-DiRICH Project and Experiences with ...indico.gsi.de/event/7836/contribution/1/material/slides/0.pdfThe CBM/HADES/PANDA-DiRICH Project and Experiences with the

The CBM/HADES/PANDA-DiRICH Project and Experiences with the Series Production

Outline

1 The DiRICH-Project

2 Experiences and Problems

Page 3: The CBM/HADES/PANDA-DiRICH Project and Experiences with ...indico.gsi.de/event/7836/contribution/1/material/slides/0.pdfThe CBM/HADES/PANDA-DiRICH Project and Experiences with the

The CBM/HADES/PANDA-DiRICH Project and Experiences with the Series ProductionThe DiRICH-Project

Motivation

Joint Venture Frontend-Electronics for MAPMT/MCP-PMTreadout for

Experiment Number of ChannelsPANDA Barrel DIRC ~11kCBM RICH ~65kHADES RICH 27392

a lot of work to develop, qualify the electronics and write thenecessary control and analysis softwaretask is shared among all groups, experience is shared!many more applications will most likely jump on the movingtrain. . .

Page 4: The CBM/HADES/PANDA-DiRICH Project and Experiences with ...indico.gsi.de/event/7836/contribution/1/material/slides/0.pdfThe CBM/HADES/PANDA-DiRICH Project and Experiences with the

The CBM/HADES/PANDA-DiRICH Project and Experiences with the Series ProductionThe DiRICH-Project

DiRICH FEE

32 channelsgalvanic isolation of PMT to FEE(transformer)~factor 30 gain amplifier, 12mWindividual threshold for eachdiscriminatorTDC with ~10ps intrinsic timeprecision (ToT measurement)data acquisition system included(TRBNet)data is sent out on the same connectoronly one connector for everything =>cable-free system

Page 5: The CBM/HADES/PANDA-DiRICH Project and Experiences with ...indico.gsi.de/event/7836/contribution/1/material/slides/0.pdfThe CBM/HADES/PANDA-DiRICH Project and Experiences with the

The CBM/HADES/PANDA-DiRICH Project and Experiences with the Series ProductionThe DiRICH-Project

DiRICH FEE / Full module

backplane for 6 MAPMTsbackplane routes allPMT-signals, clock, trigger,power, HV and 2Gb/s DAQper DiRICHPower (linear orDC/DC-converter) andDAQ-data-concentrator(12:1) modules are neededdifferent variations havebeen built:

4 MAPMTs4 MCP-PMTsthe rest of theinfrastructure stays as it is

Page 6: The CBM/HADES/PANDA-DiRICH Project and Experiences with ...indico.gsi.de/event/7836/contribution/1/material/slides/0.pdfThe CBM/HADES/PANDA-DiRICH Project and Experiences with the

The CBM/HADES/PANDA-DiRICH Project and Experiences with the Series ProductionThe DiRICH-Project

HADES RICH / Full system I / PMTs

Page 7: The CBM/HADES/PANDA-DiRICH Project and Experiences with ...indico.gsi.de/event/7836/contribution/1/material/slides/0.pdfThe CBM/HADES/PANDA-DiRICH Project and Experiences with the

The CBM/HADES/PANDA-DiRICH Project and Experiences with the Series ProductionThe DiRICH-Project

HADES RICH / Full system II / Electronics

Page 8: The CBM/HADES/PANDA-DiRICH Project and Experiences with ...indico.gsi.de/event/7836/contribution/1/material/slides/0.pdfThe CBM/HADES/PANDA-DiRICH Project and Experiences with the

The CBM/HADES/PANDA-DiRICH Project and Experiences with the Series ProductionThe DiRICH-Project

HADES RICH / PMT Dark Rates

Page 9: The CBM/HADES/PANDA-DiRICH Project and Experiences with ...indico.gsi.de/event/7836/contribution/1/material/slides/0.pdfThe CBM/HADES/PANDA-DiRICH Project and Experiences with the

The CBM/HADES/PANDA-DiRICH Project and Experiences with the Series ProductionExperiences and Problems

Everything Straight Forward?

We encountered problems until we reached the goal!

Page 10: The CBM/HADES/PANDA-DiRICH Project and Experiences with ...indico.gsi.de/event/7836/contribution/1/material/slides/0.pdfThe CBM/HADES/PANDA-DiRICH Project and Experiences with the

The CBM/HADES/PANDA-DiRICH Project and Experiences with the Series ProductionExperiences and Problems

Electronic Issues During Development

late in the project (too late to change the FPGA):ECP5UM needs lowering of the SERDES-PLL analog voltageby ~60mV to work on all FPGAs stable at 2Gb/s.FPGA-SERDES works for other transmission speedsstill not understood but workaround works for 1000 DiRICHmodules

High risk: Not understood problems normally strike backonly way to stay inside the time schedule

Page 11: The CBM/HADES/PANDA-DiRICH Project and Experiences with ...indico.gsi.de/event/7836/contribution/1/material/slides/0.pdfThe CBM/HADES/PANDA-DiRICH Project and Experiences with the

The CBM/HADES/PANDA-DiRICH Project and Experiences with the Series ProductionExperiences and Problems

Other Technical Lessons Learned I

LV-supplyDecided to go for external power-supplies to get best front-endperformance

DC/DC convertors on Power-Supply-module only 20mm awayfrom the DiRICH produces visible noise in the systemStandard Industry AC/DC convertors are usedbad noise performance directly at the output~1m distance (and cable) the noise is as low as operated witha lab-power-supply

Delivering 1.1V @ 1000A to the FEE is not a big dealand not dangerous (power supplies have a current limit andshut down)

Page 12: The CBM/HADES/PANDA-DiRICH Project and Experiences with ...indico.gsi.de/event/7836/contribution/1/material/slides/0.pdfThe CBM/HADES/PANDA-DiRICH Project and Experiences with the

The CBM/HADES/PANDA-DiRICH Project and Experiences with the Series ProductionExperiences and Problems

Other Technical Lessons Learned II

CoolingMAPMTs should be operated below 30°C to reduce the darkrate and maximize by this the life-timeAfter simulations and many measurementsHADES-RICH: the temperature of the PMTs is quite indirectlycoupled to the FEE-electronics temperature

Keeping the FEE temperature low in every corner is demandingit is much more efficient to cool the PMTs

3 normal 200mm fans are enough to cool the whole HADESRICH FEE: ~1500W FEE (incl. LDO) + ~500W cablesConclusion

Put temperature sensors everywhere to reduce the guessingSeems to be hard to simulate and needs quite some testing tofind the least effort strategy for cooling

Page 13: The CBM/HADES/PANDA-DiRICH Project and Experiences with ...indico.gsi.de/event/7836/contribution/1/material/slides/0.pdfThe CBM/HADES/PANDA-DiRICH Project and Experiences with the

The CBM/HADES/PANDA-DiRICH Project and Experiences with the Series ProductionExperiences and Problems

PCB Production

demanding PCBs needed to reach the channel densitystacked micro-vias, buried vias

up to five PCB-pressing steps needed

all fine for prototypes until we asked for the "mass" production

The PCB-manufacturer claimed that the yield was too bad andthey don’t want to produce it. . .

Demanded change in layoutwould need a new testdelay of project beyond the deadline (~70 working days to getthe PCBs)

only after long negotiations they continued

worth the effort: only this kind of PCB-technology allowed a"noise-free" operation of small signals and DAQ on the sameconnector

Page 14: The CBM/HADES/PANDA-DiRICH Project and Experiences with ...indico.gsi.de/event/7836/contribution/1/material/slides/0.pdfThe CBM/HADES/PANDA-DiRICH Project and Experiences with the

The CBM/HADES/PANDA-DiRICH Project and Experiences with the Series ProductionExperiences and Problems

Material and PCB Assembly I

1100 DiRICH result in ~1 Million components

electronics component market is in allocation

delivery of a 100nF capacitor: 52 weeks (we order that!)

results in a lot of effort to find alternatives from different vendors oreven change technology from wire wound coils to printed coils

Acceptance of Order

Page 15: The CBM/HADES/PANDA-DiRICH Project and Experiences with ...indico.gsi.de/event/7836/contribution/1/material/slides/0.pdfThe CBM/HADES/PANDA-DiRICH Project and Experiences with the

The CBM/HADES/PANDA-DiRICH Project and Experiences with the Series ProductionExperiences and Problems

Material and PCB Assembly II

Tender process for PCB AssemblyThe administration of the University was not able to conductthe whole process of the European wide tender in a compatibletime frame (<3 month)more complicated: external company also needs to acquirecomponents in a market in allocation: each replacement partneeds approval by developerour deadline in 5 month (beam time) required to shift allproduction to GSI

At GSI we were able to directly put the needed resources inmaterials procurement (even a day before Christmas!) andPCB-assemblycausing friction and delays for other projects

Page 16: The CBM/HADES/PANDA-DiRICH Project and Experiences with ...indico.gsi.de/event/7836/contribution/1/material/slides/0.pdfThe CBM/HADES/PANDA-DiRICH Project and Experiences with the

The CBM/HADES/PANDA-DiRICH Project and Experiences with the Series ProductionExperiences and Problems

Material and PCB Assembly III

Production ConclusionPlan ~1 year for a stress-free formal tender process, materialprocurement and production of larger quantities of electronics withelectronics-test, solder error correction and some contingency (foradditional delays, like e.g. PCB-production failures).

Page 17: The CBM/HADES/PANDA-DiRICH Project and Experiences with ...indico.gsi.de/event/7836/contribution/1/material/slides/0.pdfThe CBM/HADES/PANDA-DiRICH Project and Experiences with the

The CBM/HADES/PANDA-DiRICH Project and Experiences with the Series ProductionExperiences and Problems

Thanks!