12nd Sept 2017Ir. How Yoke Teng
The Brunsfield BIM Journey
7D BBIM for Facility Management
Outlines
Part 1: Introduction
The application of BBIM across the project
lifecycle to achieve the BBIM objectives
Part 2: BBIM Innovation Process
How BBIM has transformed the way the Brunsfield Team
designs, builds, measures and manages the services
Part 3: Brunsfield e-FM Projects
BBIM e-FM framework & e-FM execution plan
Part 4: Conclusion
Mastering innovation for the new digital and creative
economy
3
Introduction 01
PDI EPC REM
MEI
TSI
SOS
ISI
Introduction
The Value Chain of Brunsfield’s business model
Build ManageDesign
PROPERTY
DEVELOPMENT &
INVESTMENT
ENGINEERING
PROCUREMENT &
CONSTRUCTION
MECHANICAL,
ELECTRICAL &
ICT
TRADING &
STRATEGIC
INDUSTRIES
REAL
ESTATE
MANAGEMENT
SHARED &
OUTSOURCING
SERVICES
INTERNATIONAL
STRATEGIC
INVESTMENT
Embracing technology, the way to stay competitive
Our goals of using technology (ICT) (Since 1990):
1. To provide sustainable competitive advantage
2. To achieve highest operation efficiency
3. To be knowledge-driven company
Our Belief
embracing BIMBrunsfield Building Information Modelling (BBIM)
BBIM is a new approach to development,
design, construction, and facility management
in which a digital representation of the
building process is used to facilitate the
exchange and interoperability of information
in digital format.
BBIM Definition
2
Year :2005
Year : 2012
Year : 2014
Year:2015
Year:2016
Brunsfield BIM Roadmap
Year :2020
7Year 2000: Purchased the 1st copy of license
BBIMCity
BBIM Implementation: Design Standards
BBIM
Execution
Plan
BBIM
Modelling
Guide
Brunsfield
Standard Method
of Measurement
(BSMM)
BBIM Component
Library
BBIM Implementation: BBIM Standards
Brunsfield Standards Institution (BSI)
BBIM Guide Version 3
Development & Design Team
NewProject
InitiativesDevelopment Construction
FacilitiesManagement
Design Concept
Authority / Client
Schematic Drawings
3D Models
2D & 3D ConstructionDrawings / Docs.
Site TeamSite
TeamSite Team
Final As-Built Drawings
Progress As-Built
Drawings Feasibility Study
Maintenance Team
Design Brief
LOD 100LOD 200 LOD 300
2D Drawings / Docs.
LOD 400
LOD 500 with FM
LOD 350
Brunsfield Integrated Project Delivery (BIPD) Workflow
Design Build Manage
Construction Team
LOD 600
(BIPD - enabled by Brunsfield BIM)BIPD – enabled by Brunsfield BIM (BBIM)
LOD 550
LOD =
Level of Details
LOD 300 – LOD 350 LOD 400 LOD 500 LOD 600
Design Model + Shop Drawing Model
- M&E equipment and asset information update(according to parameters created in LOD 300)
- M&E equipment and asset and documentation (warranty, manuals)
- Cloud Storage - BRUNSCloudS
- M&E equipment and asset modelling(Genset, chiller plant, playground etc.)
- Creating parameters for M&E equipment and asset for LOD 500 info updating
Construction Model
Consultant + Contractor
Consultant
- Coordination of LOD 300 + LOD 350 model
e-FM
- Maintain building portfolio- Maintain contacts- Asset maintenance- Create checklists- Maintenance scheduling- Update changes to the
building
Maintenance Team
As-Built ModelContractor
LOD 550
- Room/ Location tagging- Merge Revit files- Export assets from Revit files- Ensure proper documentation- Extract documents from
LOD500 models - Upload into Building Ops
(warranty, manuals, O&M)
Brunsfield Integrated Project Delivery (BIPD) Workflow
12
BBIM Innovation Process 02
3
BBIM INNOVATION PROCESS
ArchitectStructural
Engineer
Sustainable
Engineer
Quantity
SurveyorCoordination Contractor
Property
Management
3d Visualization:-
• Lumion
• Sketchup
Analysis:-
• Green
Building
Studio
Integration:-
• Tekla
Structural
Designer
Costing:-
• e-BQ
Construction:-
• Brunsfield Virtual
Construction
(BVC)
Coordination:-
• Navisworks
Management:-
• e-FM
(Building Ops)
Sketchup
3D VISUALIZATION
BIM model Lumion rendering
ArchitectStructural
Engineer
Sustainable
Engineer
Quantity
SurveyorCoordination Contractor
Property
Management
ANALYSIS
ArchitectStructural
Engineer
Sustainable
Engineer
Quantity
SurveyorCoordination Contractor
Property
Management
Sun studyBasic model
INTEGRATION
ArchitectStructural
Engineer
Sustainable
Engineer
Quantity
SurveyorCoordination Contractor
Property
Management
BIM model Tekla analysis
COSTING
ArchitectStructural
Engineer
Sustainable
Engineer
Quantity
SurveyorCoordination Contractor
Property
Management
QuantificationFamilies/parameter
COORDINATION
ArchitectStructural
Engineer
Sustainable
Engineer
Quantity
SurveyorCoordination Contractor
Property
Management
Clash Detection Navigation
4
CONSTRUCTION
ArchitectStructural
Engineer
Sustainable
Engineer
Quantity
SurveyorCoordination Contractor
Property
Management
Scheduling Live modelConstruction Simulation Site progress
e-FM System
ArchitectStructural
Engineer
Sustainable
Engineer
Quantity
SurveyorCoordination Contractor
Property
Management
Conveniences
21
Brunsfield e-FM Projects03
Brunsfield e-FM Projects
Autocity in Oasis Damansara 18-Storey Residential Tower
Brunsfield e-FM Projects
Autocity in Oasis Damansara
Brunsfield e-FM Framework
Operation & MaintenanceReal time FM reporting
6. Cloud Storage
5. Revit Plugins (Documit)
4. BBIM model
3. Accounting
2. Technical
1. Professional FM
2. Building Health Reports- Sustainable reports- Preventive maintenance- TQCHESS reports (in the pipeline)
1. BIM asset data – mobile first maintenance management solution
7. Autodesk BIM 360 Ops
BRUNSFIELD
e-FM
BRUNSCloudS
5
EPM Property Management Services – Unique benefit
Building Health Reports
e-FM system benefits both owners and facility manager
• Improves the handover experience by delivering building operations data from BBIM Models in a way that makes it immediately actionable and contextually relevant.
• Enables owners to begin operations on day one with a turnkey maintenance and asset management solution.
• Helps contractors better service warranty requests and reduce expenses from unmaintained equipment.
• Offers a simple and elegant mobile and responsive web interface that meets the needs of the mobile maintenance workforce.
EPM Property Management Services – Unique benefit
e-FM System
List of facility- Autocity- Residential tower- Other projects
List of equipment- Pumps- Water tanks- Lift cars- Mechanical fans- etc.
Equipment records- Manufacturer- Model- Catalogue- etc.
Tools and plant equipment files- Warranty- User manuals- etc.
Work order (WO)- Cleaning- Waste disposal- Renovation- Maintenance- etc.
Digitalizing request/complaint
reports
ScopeBrunsfield e-FM Execution Plan
Objectives
1. To carry out building maintenance services by using BIM-enabled FM
system with the complete as-built BBIM models that equipped with facility
management information.
2. To improve and enhance the operation processes for facility maintenance
during Defect Liability Period (DLP).
3. To integrate BBIM processes throughout the project lifecycle which
covers development, design, construction, and facility management.
4. To achieve Brunsfield Integrated Project Delivery (BIPD).
5. To achieve 7D BBIM initiative which is part of the BBIM roadmap.
Brunsfield e-FM Execution Plan
e-FM workflow
Tenant
Contractor
3. rectification
6. Notification on status update
1. Raise tickets
Co-owner
Building occupants
Manager
Owner
Builder
Brunsfield e-FM Execution Plan
e-FM Collaborative Process Mapping & Coordination Plan
Roles in Building 360 Ops Access
Owner Full access to the domain - System administrator- Add building - Authority to change all user role and remove any users from the system- Add assets, tickets and schedule maintenance - All other functions
Co-owner Full access to the domain - Similar access to owner except to remove owner from the system
Manager Similar access to the Co-owner except the followings: -- Not able to add building - Not able to change co-owner user role
Technician Minimum access to the domain - Only able to raise and respond to work order
Vendor Minimum access to the domain - Only able to raise and respond to work order
Tenant Minimum access to the domain - Given access by Manager ranked individual and above - Not recorded in the domain contact list - Only able to raise complains/tickets
Table below summarizes the coordination plan in Building Ops platform
Brunsfield e-FM Execution Plan
6
Technological Infrastructure Needs - software
Autodesk Revit version 2016 and above Autodesk Building 360 Ops(e-FM Application System)
Brunsfield e-FM Execution Plan
All types of smart devices – IOS 9 (or later) or Android platform
Desktop PC – support any browser
Technological Infrastructure Needs - hardware
Brunsfield e-FM Execution Plan
Name of Asset Parameters
• Cold water pump
• Pneumatic pump
• Hydrant pump
• Swimming pool pump
• Fountain water pump
• Harvesting tank pump
• Genset & switch box
• Transformer
• Lift cars
• Smoke spill fan
• Air conditioning units
• Ventilation fans
• Boom gate system
• Access card reader and
system
• Fire alarm panel
• Playground
• Fireman intercom panel
• PCs (hardware)
1. Location
2. ID number
3. Make
4. Model number
5. Serial number
6. Manufacture/ Supplier information
7. Warranty detail
8. Lifecycle detail
9. Delivery date
10. Installation date
11. Parts catalogue
12. Operation & maintenance manual
(O&M)
13. Replacement information
14. Certification details
15. Equipment cost
List of AssetNO TABLE OF CONTENTS DESCRIPTION
1 System description• Overall view of the system design• Functionality of the system
2 Operational procedures
• System operation• Operational guideline• Declaration of system installation and operational liability• Emergency procedure• Shutdown procedure• System troubleshooting
3 Contact information• Company profile, name & address• PIC during DLP• Telephone / Fax / Email
4 Service and maintenance• Method statement of maintenance• Schedule for routine maintenance• Routine maintenance forms
5 Technical specifications • List of catalogues, catalogues & performance parameters
6 Certificates• Competent personnel certificate, company license,
equipment calibration certificate, warranty certificate, manufacturer product certificate
7 Authority approval • List of approval, certificates / supporting
8 Testing and commissioning • Method of Statement for test type, test results
9 As-built drawings • Part of the documents
10 As-built drawings in softcopy – CD • Part of the documents
Operation & Maintenance Manual (O&M)
Assign Technician to Maintenance of the Asset Assign Technician to Maintenance of the Asset
7
Schedule Maintenance Task for the Asset View Asset Details, 3D Model and Documents
Building Occupants Request Maintenance Building Occupants File Tickets
Owner / Manager Gets Insights from Ticket Reports
42
Conclusion04
8
CONCLUSION
IT DOESN’T JUST STOP THERE
INNOVATING WITH OTHER FORMS RANGING
FROM IPADS TO NEW SOFTWARES
BBIM INNOVATION CENTRE - Objectives
The objectives of BBIM CENTRE include but not limited to
the followings:
1. Continue to develop & govern the BIM standards
endorsed by all strategic partners
2. To innovate the usage of BIM
3. To promote & educate the BIM usages and,
4. To serve all BIM related matters
BBIM INNOVATION CENTRE – Scope of Services
1. Develop & Govern the BBIM Standards and Methodologies
2. Innovation
2.1 Research on BIM related topics
2.2 Internet of Things (IoT) in facility management.
2.3 Sustainability development
3. BBIM Training
3.1 Professionals
3.2 Students
BBIM INNOVATION CENTRE – BBIM Innovation Topics
3D BIM
1. Making excellent 3D models with a Drone2. Scanning Reality into Virtual Reality3. Rebar modelling for manufacturing4. Borehole & subsurface modelling5. 3D printing
4D BIM1. Logistic planning which focus on just-in-time
delivery2. Smart cranes which automate the operation
of tower cranes to reduce the risks of operator
5D BIM1. BIM object coding with manufacturing
information2. BIM object coding for procurement3. Conceptual modelling and cost planning4. BIM for feasibility study5. BIM model for cash flow projection
6D BIM
1. Sustainable index 2. Sustainable reporting 3. Building orientation/ Sun path/ Energy
analysis
7D BIM
1. IoT in Facility Management2. Real time building maintenance3. Preventive management 4. Building health monitoring
8D BIM
1. Disaster Risks Management2. Flood Management3. Hazard map 4. Disaster recovery plan5. Safecity elements
10