The ABB - SIEMENSIEC 61850interoperabilityprojects(January 2002)
Christoph Brunner, ABBHolger Schubert, SIEMENS
© A
BB P
THV
200
2-01
- Pa
ge 2
IEC 61850 - proven technology and innovation
IEC 61850UCA 2.0 IEC 60870
Communication conceptsData Models
EthernetTechnology
Process BusComm
Architecture
ConfigurationLanguage
© A
BB P
THV
200
2-01
- Pa
ge 3 Process Level
HV Equipment
IEC 61850 - system architecture
Bay Level
Protection Control
Station Level
Function A Function B
Process Level
HV Equipment
Bay Level
Protection Control
Technical Services
© A
BB P
THV
200
2-01
- Pa
ge 4
Prototyping activities - Overview
OCIS, 1998 - 2000: Communication between Stationand Bay LevelGOOSE demo, 2001: Transmission of trip - signals overserial communicationIEC 61850-9-1 interoperability, 2001 - 2002:Communication between CT/VT’s and protection relays
© A
BB P
THV
200
2-01
- Pa
ge 5
The OCIS - Project
Project goalsAssist the standardization process to reachone world-wide standard IEC 61850Assist the harmonization process betweenIEC 61850 and UCA.2Test and compare original IEC 61850 andUCA.2 drafts with respect to feasibility,applicability and efficiencyTest the independence of IEC 61850 fromthe communication stack (Verify the basiccommunication architecture)
Project durationThe project started in 1998 and terminatedwith a conference in 2000
© A
BB P
THV
200
2-01
- Pa
ge 6
StationsbusMMS/EthernetIEC 61850-8-1
StationsbusFMS/Profibus
Test setupThe OCIS
project
© A
BB P
THV
200
2-01
- Pa
ge 7
Summary of results
The communication concepts as defined in IEC 61850drafts fulfill the requirements of substationcommunicationThe object model of UCA needs extensions to beapplicable by the European marketEthernet is suitable as station busIEC 61850 based applications are independent from thecommunication stack and therefore future proofIEC 61850 provides interoperability between devicesfrom multiple vendors
The OCISproject
© A
BB P
THV
200
2-01
- Pa
ge 8
The GOOSE Demo
GOOSE:Generic Object Oriented System Event
Project goalsVerify the concepts of the IEC enhancedGOOSEVerify the basic concepts of the substationconfiguration languageDemonstrate interoperability andconfigurability between multiple vendors
Project durationProject start January 2001Demonstration at Utility Initiative Meetingin Vancouver, May 24, 2001
© A
BB P
THV
200
2-01
- Pa
ge 9
Analog inputs
Ethernet Network
Relay
Switchgear Sim
Relay
Test Equipment
Network Analyzer
Basic Demo setupThe GOOSE
demo
© A
BB P
THV
200
2-01
- Pa
ge 1
0
GOOSE - concepts: the UCA approach
fix
Bit1/2 DBC1Bit3/$ DBC2
Bit1/2 DBC1Bit3/$ DBC2
Standardized and pre-configured
no configuration data exchange for
interoperability necessary
User defined
Interoperable only by exchangingprivate data with a private
non standardized data format
DNA
GOOSE: Generic Object Oriented Substation EventThe message content in UCA - GOOSE is fixed and predefined
The GOOSEdemo
© A
BB P
THV
200
2-01
- Pa
ge 1
1
GOOSE - concepts: IEC approach
IEC - GOOSE added flexibilityThe message content is defined with a configurable datasetThe configuration may be done either online (using MMS services)or offline (using XML)
<LN0 LNType="LLN0"> <DataSet Ref="GOOSE_2" ConfRev="1">
<DOName LNRef="1" LNClass="RREC" DORef="Oper" Attr="general" /> <DOName LNRef="1" LNClass="RREC" DORef="Mode" Attr="stVal" />
</DataSet> <GOOSEControl Ref="GOOSE_ABB_US_2" DataSetRef="GOOSE_2"
MACAddress="0xBF FF FF E7 00 01" />
The GOOSEdemo
© A
BB P
THV
200
2-01
- Pa
ge 1
2
Demo case 1 and 2: protection scenario
The Omicron equipment simulates the power lineOne of the two relays simulates a protection relay, theother simulates the reclosing deviceThe switchgear simulation simulates the circuit breaker
RREC.Oper.generalRREC.Mode.stVal
Autorecloser
PSCH.Oper.generalPSCH.Mode.stVal
Protection
XCBR0.Pos.stValXCBR0.Mode.stValXSWI1.Pos.stValXSWI1.Mode.stValXSWI8.Pos.stValXSWI8.Mode.stVal
Switchgear
Content of GOOSE messages:
The GOOSEdemo
© A
BB P
THV
200
2-01
- Pa
ge 1
3
Goose Message:Positions
SIEMENS Relay ABB Relay
ABB PASSSimulation
OMICRON TestEquipment
EthernetNetwork
Analog inputs
1. Simulated fault2. Trip generated
4. Reclose command
Goose Message:Reclose
3. New position
Goose Message:Positions
Goose Message:Trip
5. New position
Case 1: Trip and auto-reclosingThe GOOSE
demo
© A
BB P
THV
200
2-01
- Pa
ge 1
4
IEC 61850-9-1 interoperability
Project goalsdemonstrate the interoperability betweennon conventional sensors, protectionrelays and revenue meters achieved withIEC 61850-9-1develop first prototypes of devicessupporting IEC 61850-9-1
Project durationCooperation of ABB and SIEMENS tosupport IEC 61850-9-1 announced atCIGRE 2000 meetingInteroperability between ABB andSIEMENS verified end of October 2001Interoperability tests at KEMA November19 - 23, 2001 ongoing
© A
BB P
THV
200
2-01
- Pa
ge 1
5
Protection relays
Merging units
Point-to-point linkaccording to
IEC 61850-9-1SI
EMEN
S
SIEM
ENS
to instrumental transformers
Revenuemeter
IEC 61850-9-1interoperability Basic test setup
Revenuemeter
SIEM
ENS
SIEM
ENS
© A
BB P
THV
200
2-01
- Pa
ge 1
6
The concept of the 61850-9-1 link
MergingUnit
Protection BayController
ProprietaryLink
Standardised Link
IEC 61850-9-1interoperability
List of ValuesDatSetRef Counter
The message content isdefined with aconfigurable datasetThe configuration maybe done either online(using MMS services) oroffline (using XML)
© A
BB P
THV
200
2-01
- Pa
ge 1
7
From point-to-point link to process bus
REB500ABB ABB Network Partner
PISA
PI
SA
PISA
PISA
A
PISA A
PISA B
MergingUnit
MergingUnit
Other Bays
Protection Unit
I
REB500ABB ABB Network Partner
PIS A
P
SA
PISA
PISA
A
PISA A
PISA B
MergingUnit
MergingUnit
MergingUnit
Other Bays Other Bays
Protection Unit
EthernetSwitch
IEC 61850-9-1interoperability
© A
BB P
THV
200
2-01
- Pa
ge 1
8
500BU03Prot.relay
ABB Merging Unit
U-/I-PISA
61850-9-1Ethernet;
sample rate:1000/s - 4000/spackage rate:
1000/s
Omicron Test Set
5 U4 I
R S T
7SA525Prot.relay
Commercial Ethernet Switch
Siemens Merging Unit
U-/I-Transducer Unit
R S T
GPS (1 PPS)
5 U4 I
ABB / Siemensproprietary
signalinterfaces
IEC 61850-9-1interoperability Detailed test setup
© A
BB P
THV
200
2-01
- Pa
ge 1
9
Summary and outlook
The concepts of IEC 61850 have been verifiedThe point - to - point link connecting non conventionalinstrumental transformers according to IEC 61850-9-1 isready to be used and will be supported in future byABB and SIEMENSCommunication links supporting IEC 61850-9-1 may beconnected with an Ethernet switch implementing a firststep of a process bus solution.
The verification of the real time behavior of a processbus approach will be the focus of future prototypingactivities