the 7 deadly sins of almost being agile · recap of the 7 deadly sins 1. missing feedback loops 2....
TRANSCRIPT
![Page 1: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/1.jpg)
The 7 Deadly Sins of Almost Being Agile
Bob HartmanRichard Lawrence
Presentation Copyright © 2009, Agile For All, LLC. and Humanizing Work. All rights reserved.
www.agilecooperative.com
![Page 2: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/2.jpg)
Logistics
• Please turn cell phones, pagers, PDA’s, etc to the “stun yourself” setting (rather than the “annoy everyone else” setting)
• We will take a 30 minute break after 1.5 hours
• Please ask questions when they come up rather than waiting
• Be prepared to participate! This presentation requires a lot of work on your part.
![Page 3: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/3.jpg)
About us…
www.agilecooperative.com
![Page 4: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/4.jpg)
About us…
About you…
![Page 5: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/5.jpg)
About thissession…
![Page 6: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/6.jpg)
Our Fictional Team
![Page 7: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/7.jpg)
Sally the Project Manager
![Page 8: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/8.jpg)
Bill the Business Analyst
![Page 9: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/9.jpg)
Tom the Product Manager
![Page 10: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/10.jpg)
4 Developers
![Page 11: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/11.jpg)
2 Testers
![Page 12: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/12.jpg)
The First Agile Project
6 months
Expected 25 features
Delivered 10 features
3 “most important” cut
Prior release 72 defects
Agile release 70 defects
Customers unhappy
![Page 13: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/13.jpg)
The Second Agile Project
6 months
Expected 25 features
Delivered 8 features
5 “most important” cut
Prior release 70 defects
This release 79 defects
Customers VERY unhappy
![Page 14: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/14.jpg)
Fixing the W-Agilists
Enter Cindi, director of the company PMO
![Page 15: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/15.jpg)
The Thinking Process
![Page 16: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/16.jpg)
Example cloud from Clarke Ching
![Page 17: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/17.jpg)
DEADLY SIN #1 - Lack of Meaningful Feedback Loops
• We are too busy to stop working!
• Daily stand-ups are useless, let’s just use a single weekly status meeting.
• When we ask people for feedback they don’t show up or don’t participate anyway.
• We aren’t really sure why we would want feedback or how we would use it anyway.
![Page 18: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/18.jpg)
PRACTICE Undesirable Effects
1. Building wrong products
2. Building the product wrong
3. No improvement
4. Lack of visibility
5. Lack of trust
6. Key people out of the loop
What are some of the undesirable effects the W-Agilists would see from the lack of feedback loops in their process?
![Page 19: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/19.jpg)
Phrase to remember
![Page 20: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/20.jpg)
DEADLY SIN #2 - No incremental deliveries of software
0%10%20%30%40%50%60%70%80%90%
100%
Not Started
Started
Needs Integration
Integrated
![Page 21: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/21.jpg)
PRACTICE Causes
1. Not using iterations at all
2. Building by architecture instead of value
3. Can’t make stories small
4. We’ve always done it that way
5. Takes time we don’t have
6. Sometimes need to integrate with other teams that aren’t agile
What might be some of the main causes of not building software iteratively (remember, this is supposed to be an agile team!)
![Page 22: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/22.jpg)
Phrase to remember
![Page 23: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/23.jpg)
Our story continues…
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Iteration 1 Iteration 2 Iteration 3
Not Started
In Progress
Completed
![Page 24: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/24.jpg)
Looking deeper…
0
20
40
60
80
100
120
Day 1-3 Day 4-6 Day 7-10
Developer
Tester
DBA
![Page 25: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/25.jpg)
DEADLY SIN #3 - Silo’d Teams
1. Deep domain knowledge is best
2. Experts better than generalists
3. Work will be evenly distributed
4. Organizational structure cannot be changed
5. Optimizing specialties optimizes the whole
What assumptions cause many organizations to deliberately use silo’dteams?
![Page 26: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/26.jpg)
Phrase to remember
![Page 27: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/27.jpg)
The Evaporating Cloud
A tool for articulating and breaking conflicts.
![Page 28: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/28.jpg)
Photo by ngould on sxc.hu
![Page 29: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/29.jpg)
Photo by ngould on sxc.hu
resistanceto change?
![Page 30: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/30.jpg)
Photo by ngould on sxc.hu
malice?incompetence?
![Page 31: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/31.jpg)
Photo by ngould on sxc.hu
CONFLICT
![Page 32: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/32.jpg)
Do X. Don’t do X.
Spend our
money on Y.
Spend our
money on Z.
![Page 33: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/33.jpg)
Do X.
Don’t do X.
![Page 34: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/34.jpg)
Do pair programming.
Don’t do pair programming.
![Page 35: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/35.jpg)
Do pair programming.
Don’t do pair programming.
Avoid introducing
defects.
Maximize productivity.
![Page 36: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/36.jpg)
Do pair programming.
Don’t do pair programming.
Avoid introducing
defects.
Maximize productivity.
Deliver fast.
![Page 37: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/37.jpg)
Do pair programming.
Don’t do pair programming.
Avoid introducing
defects.
Maximize productivity.
Deliver fast.
PREREQUISITE #1
PREREQUISITE #2
REQUIREMENT #1
REQUIREMENT #2
OBJECTIVE
![Page 38: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/38.jpg)
Do pair programming.
Don’t do pair programming.
Avoid introducing
defects.
Maximize productivity.
Deliver fast.
PREREQUISITE #1
PREREQUISITE #2
REQUIREMENT #1
REQUIREMENT #2
OBJECTIVE
P1R1: In order to avoid introducing defects, we must do pair programming because…
•
•
•
•
•
![Page 39: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/39.jpg)
Do pair programming.
Don’t do pair programming.
Avoid introducing
defects.
Maximize productivity.
Deliver fast.
PREREQUISITE #1
PREREQUISITE #2
REQUIREMENT #1
REQUIREMENT #2
OBJECTIVE
P1R1: In order to avoid introducing defects, we must do pair programming because…
• Pair programming helps avoid introducing defects.•
•
•
•
![Page 40: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/40.jpg)
Do pair programming.
Don’t do pair programming.
Avoid introducing
defects.
Maximize productivity.
Deliver fast.
PREREQUISITE #1
PREREQUISITE #2
REQUIREMENT #1
REQUIREMENT #2
OBJECTIVE
P1R1: In order to avoid introducing defects, we must do pair programming because…
• Pair programming helps is the ONLY way to avoid introducing defects.•
•
•
•
![Page 41: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/41.jpg)
Do pair programming.
Don’t do pair programming.
Avoid introducing
defects.
Maximize productivity.
Deliver fast.
PREREQUISITE #1
PREREQUISITE #2
REQUIREMENT #1
REQUIREMENT #2
OBJECTIVE
P1R1: In order to avoid introducing defects, we must do pair programming because…
• Pair programming helps is the ONLY way to avoid introducing defects.• Pair programming is better at avoiding defects than any other technique we know.• Pair programming does othergood things for us.•
•
![Page 42: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/42.jpg)
Do pair programming.
Don’t do pair programming.
Avoid introducing
defects.
Maximize productivity.
Deliver fast.
PREREQUISITE #1
PREREQUISITE #2
REQUIREMENT #1
REQUIREMENT #2
OBJECTIVE
P2R2: In order to maximize productivity, we must not do pair programming because…
• Pair programming ALWAYS reduces productivity.• etc. •
•
•
![Page 43: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/43.jpg)
Earn moneyEat
Assumptions:•Buying food with money is the ONLY way to eat. •The ONLY way to get money is to earn it.
How else could we eat without earning money?
![Page 44: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/44.jpg)
Do pair programming.
Don’t do pair programming.
Avoid introducing
defects.
Maximize productivity.
Deliver fast.
PREREQUISITE #1
PREREQUISITE #2
REQUIREMENT #1
REQUIREMENT #2
OBJECTIVE
How else could we avoid introducing defects without doing pair programming?
How else could we maximize productivityand do pair programming?
How could we do and not do pair programming?
![Page 45: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/45.jpg)
Back to Our Fictional Team
![Page 46: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/46.jpg)
Digging deeper in an iteration…
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Day 1-3 Day 4-6 Day 7-10
Not Started
In Progress
Completed
![Page 47: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/47.jpg)
DEADLY SIN #4 - Too much work in process
Work on one thing at a time
vs.
Work on many things
in parallel.
Using the evaporating cloud from the Thinking Process, let’s solve this conflict together.
![Page 48: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/48.jpg)
Work on one thing at a
time.
Work on many things in parallel.
Ensure we deliver max
value.
Get everything
done.
Make stakeholder
happy.
PREREQUISITE #1
PREREQUISITE #2
REQUIREMENT #1
REQUIREMENT #2
OBJECTIVE
![Page 49: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/49.jpg)
Phrase to remember
![Page 50: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/50.jpg)
Presenting an Evaporating Cloud
![Page 51: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/51.jpg)
Do pair programming.
Don’t do pair programming.
Avoid introducing
defects.
Maximize productivity.
Deliver fast.
PREREQUISITE #1
PREREQUISITE #2
REQUIREMENT #1
REQUIREMENT #2
OBJECTIVE
First, build the whole cloudAssumptions:• Lorem ipsum dolor sit amet, consectetur adipiscing elit.• Integer id libero vitae dolor ornare condimentum pellentesque ut mauris.• Duis iaculis metus ut arcu tempor lobortis.• Integer interdum pellentesque orci, sit amet sollicitudin lectus vehicula nec.
Assumptions:• Nunc elementum est a nunc luctuseuismod.
Assumptions:• Aenean vehicula lacinia lacus, sed hendrerit erat imperdiet quis.• Fusce at tortor in orci convallis porttitor sit amet non magna.• Aenean sit amet lacus nec justo consequat auctor.
Assumptions:• Duis pulvinar orci at eros pharetra at cursusnulla ultrices.• Pellentesque et eros at quam porttitor tempus id et leo.
Assumptions:• Aliquam vitae sem id metus imperdiet commodo non nec arcu.
INJECTION #1
INJECTION #2
INJECTION #3
![Page 52: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/52.jpg)
Do pair programming.
Don’t do pair programming.
Avoid introducing
defects.
Maximize productivity.
Deliver fast.
PREREQUISITE #1
PREREQUISITE #2
REQUIREMENT #1
REQUIREMENT #2
OBJECTIVE
Then, redo the assumptions and injections together
Assumptions:•
•
•
•
Assumptions:•
•
Assumptions:•
•
•
•
Assumptions:•
•
•
Assumptions:•
•
•
![Page 53: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/53.jpg)
DEADLY SIN #5 - Lack of customer voice
![Page 54: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/54.jpg)
Discuss
What are the
effects of lack
of customer
voice?
![Page 55: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/55.jpg)
PRACTICE Lack of customer voice
Engage the customer
vs.
Don’t engage the customer
Create an evaporating cloud in your group
![Page 56: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/56.jpg)
Phrase to remember
![Page 57: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/57.jpg)
DEADLY SIN #6 - Unrealistic deadlines
![Page 58: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/58.jpg)
Discuss
What are the
effects of lack
of unrealistic
deadlines?
![Page 59: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/59.jpg)
Phrase to remember
![Page 60: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/60.jpg)
DEADLY SIN #7 - Manual testing taking too long
Sprint 1 Sprint 2 Sprint 3 Sprint 4
New feature testing
Sprint 5
Testing that doesn’t happen,
but shouldRegression testing
Testing capacity
![Page 61: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/61.jpg)
Automate and get regression tests for (nearly) free .
Sprint 1 Sprint 2 Sprint 3 Sprint 4
New feature testing
Sprint 5
Automated tests that are now
regression tests
Testing capacity
![Page 62: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/62.jpg)
Phrase to remember
![Page 63: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/63.jpg)
PRACTICE Unrealistic Deadlines OR Adopting Automated Testing
Adopt automated testing vs. Don’t adopt…
or
Say “yes” to all customer demands vs. Say “no” to some…
Create an evaporating cloud in your group.
![Page 64: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/64.jpg)
Recap of the 7 Deadly Sins
1. Missing feedback loops
2. Not building in iterations – large scale integrations
3. Silo’d teams
4. Too much work-in-progress (WIP)
5. Lack of customer voice
6. Unrealistic deadlines
7. Over-reliance on manual testing
![Page 65: The 7 Deadly Sins of Almost Being Agile · Recap of the 7 Deadly Sins 1. Missing feedback loops 2. Not building in iterations –large scale integrations 3. Silo’dteams 4. Too much](https://reader033.vdocuments.us/reader033/viewer/2022042302/5ecd070510e125316b41fea8/html5/thumbnails/65.jpg)
Questions?
www.richardlawrence.info
303-895-7688
www.agilebob.com
303-766-0917