the 1[khyber pakhtunkhwa] 2[khyber pakhtunkhwa...
TRANSCRIPT
THE 1[KHYBER PAKHTUNKHWA]
2[KHYBER PAKHTUNKHWA] DEVELOPMENT AUTHORITY
MINERAL WING (TAKING OVER) ACT, 2009.
(3[KHYBER PAKHTUNKHWA] ACT NO. I OF 2009)
CONTENTS
PREAMBLE
SECTIONS
1. Short title and commencement.
2. Definitions.
3. Taking-over.
4. Transfer of assets and liabilities.
5. Absorption of employees.
6. Indemnity.
7. Removal of difficulties.
8. Provision to over-ride other laws.
9. Power to make rules.
10. Repeal.
1Substituted vide Khyber Pakhtunkhwa Act No. IV of 2011 2Substituted vide Khyber Pakhtunkhwa Act No. IV of 2011 3Substituted vide Khyber Pakhtunkhwa Act No. IV of 2011
THE 4[KHYBER PAKHTUNKHWA]
5[KHYBER PAKHTUNKHWA] DEVELOPMENT AUTHORITY
MINERAL WING (TAKING OVER) ACT, 2009.
(6[KHYBER PAKHTUNKHWA] ACT NO. I OF 2009)
[First published after having received the assent of the Governor of the 7[Khyber
Pakhtunkhwa] in the Gazette of 8[Khyber Pakhtunkhwa](Extraordinary),dated the
31st January, 2009]
AN
ACT
to provide for the taking over of the Mineral Wing of 9[Khyber Pakhtunkhwa]
Development Authority by Government of the 10
[Khyber Pakhtunkhwa]and to
absorb the employees of the said wing in the Exploration Promotion Division of the
Directorate General of Mines and Minerals, 11
[Khyber Pakhtunkhwa].
WHEREAS it is expedient to provide for the taking-over of the Mineral
Wing of 12
[Khyber Pakhtunkhwa] Development Authority by Government of the 13
[Khyber Pakhtunkhwa] and to absorb the employees of the said wing in the
Exploration Promotion Division of the Directorate General of Mines and Minerals, 14
[Khyber Pakhtunkhwa];
It is hereby enacted as follows:
1. Short title and commencement.---(1) This Act may be called the 15
[Khyber
Pakhtunkhwa] 16
[Khyber Pakhtunkhwa] Development Authority Mineral Wing
(Taking-Over) Act, 2009.
(2) It shall come into force at once.
2. Definitions.---In this Act, unless the context otherwise requires,--
(a) “Appendix” means the Appendix to this Act;
4Substituted vide Khyber Pakhtunkhwa Act No. IV of 2011 5Substituted vide Khyber Pakhtunkhwa Act No. IV of 2011 6Substituted vide Khyber Pakhtunkhwa Act No. IV of 2011 7Substituted vide Khyber Pakhtunkhwa Act No. IV of 2011 8Substituted vide Khyber Pakhtunkhwa Act No. IV of 2011 9Substituted vide Khyber Pakhtunkhwa Act No. IV of 2011 10Substituted vide Khyber Pakhtunkhwa Act No. IV of 2011 11Substituted vide Khyber Pakhtunkhwa Act No. IV of 2011 12Substituted vide Khyber Pakhtunkhwa Act No. IV of 2011 13Substituted vide Khyber Pakhtunkhwa Act No. IV of 2011 14Substituted vide Khyber Pakhtunkhwa Act No. IV of 2011 15Substituted vide Khyber Pakhtunkhwa Act No. IV of 2011 16Substituted vide Khyber Pakhtunkhwa Act No. IV of 2011
(b) “assets” includes the vehicles, furniture, and other store
items specified in Appendix;
(c) “Department” means the Industries, Commerce, Mineral
Development, Labour and Technical Education Department of
Government;
(d) “Government” means the Government of the 17
[Khyber
Pakhtunkhwa];
(e) “Employees” mean the employees borne on the Mineral Wing
of SDA immediately before the commencement of this Act;
(f) “Mineral Wing” means the Mineral Wing of SDA;
(g) “Prescribed” means prescribed by rules made under this Act;
and
(h) “SDA” means 18
[Khyber Pakhtunkhwa] Development
Authority established under section 3 of the 19
[Khyber
Pakhtunkhwa] Development Authority Act, 1972 (20
[Khyber
Pakhtunkhwa] Act No. XI of 1973).
3. Taking-over.---As from coming into force of this Act, the employees shall
stand transferred to, and vest in Government, and the Mineral Wing shall cease to
exist.
4. Transfer of assets and liabilities.---All rights, properties, assets, liabilities,
debts and obligations with regards to the employees or the Mineral Wing, and all
matters and things engaged to be done by, with or for and all suits and other
proceedings by or against, such employees or Wing shall be deemed to be rights,
properties, assets, liabilities, debts and obligations, or as the case may be, matters
and things engaged to be done, by, with or for, and suits and other proceedings by or
against Government.
5. Absorption of employees.---(1) On their transfer under section 3, the
employees shall stand absorbed in the Exploration Promotion Division of the
Directorate General of Mines and Minerals of the Department and shall, for all
intents and purposes, be deemed to be civil servants with effect from the
commencement of this Act:
17Substituted vide Khyber Pakhtunkhwa Act No. IV of 2011 18Substituted vide Khyber Pakhtunkhwa Act No. IV of 2011 19Substituted vide Khyber Pakhtunkhwa Act No. IV of 2011 20Substituted vide Khyber Pakhtunkhwa Act No. IV of 2011
Provided that their seniority vis-à-vis the employees of the Exploration
Promotion Division of the Directorate General of Mines and Minerals of the
Department shall be determined with reference to regular and continuous date of
appointment of both the employees to the respective cadre/post.
(2) The inter-se-seniority of the employees on their absorption shall
remain the same as they enjoyed during their employment under SDA.
(3) The terms and conditions of service of the employees shall be the
same as admissible to the civil servants; provided that such terms and conditions
shall not be less favorable than those admissible to them under SDA.
6. Indemnity.---No suit, prosecution or other legal proceeding shall lie against
Government or any other person for anything in good faith done or intended to be
done under this Act or any rule or order made thereunder.
7. Removal of difficulties.---For the purpose of carrying into effect the
provisions of this Act, Government shall provide for-
(a) the removal of difficulties, if any, arising out of, or in
connection with, the transfer to, and absorption of, the
employees as aforesaid; and
(b) other matters supplemental or incidental to, or consequential
upon, such transfer and absorption.
8. Provision to over-ride other laws.---The provisions of this Act and the rules
and orders made thereunder shall have effect notwithstanding anything to the
contrary contained any other law for the time being in force.
9. Power to make rules.---Government may make rules for carrying out the
purposes of this Act.
10. Repeal.---The North-West Frontier Province Sarhad Development Authority
Mineral Wing (Taking-Over) Ordinance, 2008 (N.-W.F.P. Ordinance No. XIX of
2008) is hereby repealed.
APPENDIX
LIST OF ASSETS SHIFTED FROM SDA MINERAL, WING TO
EXPLORATION PROMOTION DIVISION, DIRECTORATE GENERAL,
MINES & MINERALS, IN NOVEMBER, 2001.
A. EXPLORATION PROMOTION DIVISION HEADQUARTERS OFFICE
DGMM
1. VEHICLES
(i) Nissan Car A-1391 Model-1993 (Presently in use of EPD).
(ii) Nissan Car A-1387 Model-1987 (Presently in use of Industries Deptt).
(iii) Toyota Double Cab.Pick-up A-3022 Model-1994 (Stolen).
(iv) Suzuki Jeep A-1030 Model-1989 (Parked in DGMM office).
(v) Suzuki Jeep DR-5992 Model-1989(presently in use of Dy. Secretary
Industries Department.
(vi) Suzuki Potohar Jeep A-3171 Model-1990 (Presently in use of
Gemstone Training Project, Malakand.
(vii) Pajero Jeep A-2478 Model-1987 (Transferred to Industries
Department).
2. FURNITRUE/FIXTRUE (F/A)
3. Computer 01 No
B. MINERAL PROJECTS
MINERAL TESTING LABORATORY INDUSTRIAL ESTATE PESHAWAR.
1. VEHICLE: Toyota Hiace (Model Lab) A-3572 Model-1991 (In use of MTL).
2. FURNITURE/FIXTURE (F/B)
3. LAB EQUIPMENTS (F/B)
4. COMPUTER (F/D)
5. PILOT PLANT MACHINERY. NephelineSyuenite Pilot Plant & Chromite
Pilot Plant Installed in the premises of MTL.
6. BUILDING / LAND
i) MTL, Land 3.7 acre.
ii) MTL Lab Building 10,000 sq.ft.
iii) Pilot plant Building, 7,645 Sq.ft.
REGIONAL MINERAL EXPLORATION PROJECT CHITRAL.
1. VEHICLES
(i) Toyota Double Cab Pick-Up A-3916 Model-1992 (Presently in use
of Project Director Most Project, MTL).
(ii) Suzuki Jeep Cl-1991 Model-1989 (in use of Gemstone Project
Chitral).
(iii) Toyota Double Cab Pick-Up A-3478 Model-1992 in use of
Gemstone Project Chitral).
2. FURNITURE/FIXTURE (F/E)
REGIONAL MINERAL EXPLORATION PROJECT MALAKAND
DIVISION.
1. VEHICLES.
(i) Pajero Jeep A-2792 Model-1985 (Presently in use of MTL).
(ii) Nissan Pick-Up A-2792 Model-1987 (Presently in use of Gemstone
Training Project Malakand).
3. MINE MACHINERY /EXPLORATION EQUIPMENTS (F/G)
REGIONAL MINERAL EXPLORATION PROJECT HAZARA
DIVISION.
1. VEHICLES.
i) Project Jeep A-1211 Model-1984. (Presently Parked in DGMM).
ii) Toyota Pic-Up A-1057 Model-1987 (In use of Gemstone Training
Project Hazara.
iii) Suzuki Jeep Cl-984 Model-1989 (In use of Gemstone Training Project
Hazara).
2. FURNITURE/FIXTURE. (F/H).
3. MINE MACHINERY/EXPLORATION EQUIPMENTS (F/I).
SUMMARY OF ASSETS
1. Vehicles 16 Nos.
2. Furniture/Fixture 05 Offices.
3. Lab.Equipments 01 Offices
4. Mine Machinery/Exploration Equipments. 02 Offices.
5. Pilot Plant Machinery 01 Office (MTL
Peshawar).
6. Land. 3.7 acre at MTL.
7. Building 17.645 sq.ft at MTL
FURNITURE OF EPD HEADQUARTERS
1. Office Table 02 Nos.
2. Office Chairs 07 Nos.
3. Computer Table 01 No.
4. Side racks 02 Nos.
5. Wall clock 02 Nos.
6. Revolving Chair. 01 No.
7. Table Lamps 02 Nos.
8. Woolen Carpet 01 No.
9. Telephone set 01 No.
10. Telephone set internal 01 No.
11. Show Case 01 No.
12. Table Officer 01 No.
13. Office Pen holder 01 No.
14. Quaid-e-Azam Portrait 01 No.
15. Table glass 01 No.
16. Map Board 01 No.
17. Crockery (as available in
Director Mineral Office.)
18. English-Urdu Dictionary. 01 No.
19. Steno Phone (9211602) 01 No.
20. Cabinet Steel. 01 No.
PHYSICAL VERIFICATION OF GENERAL ITEMS ON 30/06/2001
FURNITURE /FIXTURE
S.NO: Description Quantity
A. ACCOUNTS OFFICE : : :
1. : Charis (Steel legs) 04 Nos.
2. : Iron safe 01 No.
3. : Steel Almiras 6x3x1-1/2’ 05Nos
4. : Air Conditioner ½ Tonn (National) 01 No.
5. : Ceiling Fan 56” Climax 02 Nos.
6. : Wooden Office Table 4 x2-1/2x2-1/2 One Draws: 01 No.
7. : Wooden Office Table 4x2-1/2x2-1/2 (GSIMBA) 01 No.
8. : Wooden Office Table 5x3x2-1/2 four draws 01 No.
9. : Side racks steel (GSIMBA) 01 No.
10. : Side racks wooden 01 No.
11. : Plastic tray 01 No.
12. : Waste paper baskets 03 Nos.
13. : Tube rods (Philips) 4’ 06 Nos.
14. : Electric brackets with glass globes 04 Nos.
15. : Steel Cabinet 4 draws 02 Nos.
16. : Pen stand marble 01 No.
17. : Table glass 5x3x5 mm 01 No.
B. : ADMIN SECTION.
1. Table 5x3’ with Drawers A.M (A&P) 01 No.
2. Chairs steel legs 03 Nos.
3. Ceiling Fan 56’’ (Climax) 01 No.
4. Air Conditioner (National 1-1/2 tons) 01 No.
5. Tube Rods Philip size 04’ 02 Nos.
6. Side rack (wooden) 2-1/2/4x1-1/2x1-1/2’ 01 No.
7. Electric Brackets with glass globs 03 Nos.
8. Table glass (3’x2’0 5 mm. 01 No.
9. Plastic tray 02 No.
10. Waste paper basket 02 Nos.
11. Table diary stand 01 No.
12. Steel Almirah 03 No.
13. Tabel with 2 No. Drawers 4x3 01 No.
14. Typewriter Optima 01 No.
15. Telephone Set 01 No.
16. Chair (wooden) 01 No.
C. : COMPUTER SECTION
1. : Air Condition National 01 No.
2. : Amirah Steel 02 No.
3. : Ceiling fan Climax 01 No.
4. : Tube rods Philips 02 Nos.
5. : Table 03 Nos
6. : Side rack 01 No.
7. : Chairs steel 02 No.
8. : Electric brackets with globe 03 Nos.
9. : Waste Paper basket 01 No.
10.: Table Glass 3x5 01 No.
11.: Table Glass 3x2 01 No.
D. PROJECT MANAGER /CHIEF GEOCHEMIST OFFICE.
1. Table (Executive special ) 3x6x2-1/2’ 01 No.
2. Chair (wooden with canning) 06 No.
3. Air Conditioner (National) 1-1/2 tonn 01 No.
4. Ceiling fan 56” (Climax) 02 Nos.
5. Side racks wooden 01 No.
6. Tube rods (Philips) 4’’ 04 Nos.
7. Electric brackets with glass globs 04 Nos.
8. Curtain for windows. 06 Nos.
9. Telephone set (Black) 01 No.
10. Pen stand marble with two pens 01 No.
11. Table Diary with Marble stand 01 No.
12. Synthetic Carpet 01 No.
13. Waste paper basket 01 No.
14. Pin Cushion (Marble) 01 No.
15. Office table with 4 drawers 01 No.
16. Wall Clock 01 No.
17. Notice Board 01 No.
18. Wooden frame (Rock Table) 02 No.
E. P.A TO P.M OFFICE
1. Wooden Chair 01 No.
2. Wooden shelf with two glasses 5-1/2x3 01 No.
3. Table wooden for computer 5-1/2x3 01 No.
4. Ceiling fan 56’ Climax 01 No.
5. Tube Rods (Philips) 4’ 02 Nos.
6. Side racks wooden 01 Nos.
7. Electric brackets with glass globs 02 Nos.
8. Curtain for windows 01 No.
F. : STORE OFFICE :
1. : Office Table wooden with two drawers: 01 No
2. : Chair wooden : 02 Nos
3. : Chair Steel : 01 No.
4. : Shelf wooden 3×6×1 : 01 No.
5. : Steel Almirah 2-10/12×6×1-1/2 : 02 Nos.
6. : Ceiling Fan 56” (Climax) : 01 No.
7. : Tube rods (Climax) : 02 Nos.
8. : Wooden Stool : 01 No.
9. : Pen Stand : 01 No.
10.: Table Dairy : 01 No.
11.: Table Glass : 01 No.
12.: Room Heater : 01 No.
G. : SENIOR CHEMIST OFFICE :
1. : Office Table( wooden) size 5×3×2-1/2 : 01 No
with three drawers on cupboard
2. : Chair wooden : 02 Nos
3. : Chair steel legs : 01 No.
4. : Side racks size 2-J/41-1/12×2/2 : 03 Nos.
5. : Air conditioner (National) 1-1/2tons : 01 No.
6. : Ceiling Fan 56” (Climax) : 02 Nos.
7. : Wooden shelf with glass door (6×3×1’) : 01 No.
8. : Table Glass (5×3’)5 mm : 01 No.
9. : Tube Rods Philips size 4’ : 04 Nos.
10.: Electric Bracket with glass globes : 03 Nos.
11.: Refrigerator (Candy) 1-7/12×2-3/4×1-3/4’: 01 No.
12.: Room Heater : 01 No.
H. : SENIOR GEOLOGIST :
1. : Wooden office Table 5×3×2-1/2 with : 01 No
four drawers and a cupboard
2. : Chair steel legs : 01 No
3. : Air conditioner (National) 1/2 tonn : 01 No.
4. : Ceiling Fan 56” Climax : 01 Nos.
5. : Tube Rods 4’ (Philips) : 02 Nos.
6. : Electric brackets with glass globs : 02 Nos.
7. : Curtain : 02 No.
I. : MINERALOGICAL LABORATORY:
1. : Fixed wooden Table with six : 01 No
drawers for microscope
2. : Ceiling Fan 56” Climax : 01 No
3. : Tube Rods (Philips) 4’ : 02 Nos.
4. : Electric brackets with glass globs : 03 Nos.
5. : Curtain : 02 Nos.
6. : Table wooden fixed with 9 drawers : 01 No.
7. : Blood Bank refrigerator : 02 No.
9. : Wooden Frame : 02 Nos.
10.: Revolving Chair : 01 No.
J. : ASSISTANT CHEMIST ROOM :
1. : Office table wooden with three : 01 No
drawers and one cupboard 5×3×2-1/2’
2. : Steel cabenit with four drawers : 01 No.
4-1/2×1-1/2×2’
3. : Iron safe 1-1/2×1-1/2×2’ : 01 No.
4. : Ceiling fan 56: Climax : 01 No.
5. : Tube rods Philips 4’ : 02 No.
6. : Electric brackets with glass globs : 03 Nos.
7. : Almirah wooden with glass door : 01 No.
6-1/2×3-1/4×1-1/2 01No.
K. : PROCESSING MINERAL ANALYZER ROOM :
1. : Curtain : 04 Nos
2. : Air conditioner (National) 1-1/2 tonn : 01 No.
3. : Tube rods (Philips) 4’ : 02 Nos.
4. : Electric brackets with glass globs : 02 Nos.
5. : Table with three drawers 4×2-1/2×2-1/2’: 01 No.
6. : Chairs Wooden : 03 Nos.
7. : Side racks wooden : 01 No.
8. : Ceiling fan 56” Climax : 01 No.
9. : Wooden bench fixed with wall : 01 No.
3×9-3/4×2-5/6
8-9/12×2/9
10.: Revolving chairs : 01 No.
11.: Revolving stool : 02 Nos.
12.: Waste basket : 01 No
L. : CHEMICAL STORE :
1. : Ceiling fan 56” Climax : 01 No
2. : Electric brackets with glass globs : 03 Nos.
3. : Tube rods Philips 4’ : 02 Nos.
M. : EQUIPMENT STORE :
1. : Ceiling fan 56” Climax : 01 No
2. : Electric brackets with glass globs : 03 Nos.
3. : Tube rods Philips 4’ : 02 Nos.
N. : ATOMIC ABSORPTION :
1. : Revolving stools : 02 Nos.
2. : Stool wooden : 01 Nos.
3. : Air conditioner (National) 1-1/2 tonn : 01 No.
4. : Ceiling fan 56” Climax : 01 No.
5. : Wooden benching attached with wall : 01 No.
size 1. 9-1/3×3×2-10/12’
2. 4×2-1/3×2-10/12’
3. 9-1/2×3×2-10/12’
6. : Wooden shelf with glass doors 6×3×1’ : 02 Nos.
7. : Plastic Bucket : 01 No.
O. : U.V ROOM :
1. : Air conditioner (National) 1-1/2 tonn : 01 Nos.
2. : Ceiling fan 56” Climax : 01 No.
3. : Tube rods (Philips) 4’ : 02 Nos.
4. : Wooden Shelf with glass doors 6×3×1 with glass’: 01 No.
5. : Wooden benching attached with wall : 03 No.
3×9-1/3×3’
P. : BALANCE ROOM :
1. : Wooden shelf with glass doors 3×6×1’ : 03 Nos.
2. : Air conditioner (National) 1-1/2 tonn : 01 No.
3. : Ceiling fan 56” Climax : 01 No.
4. : Tube rods (Philips) 4’ : 02 Nos.
5. : Wooden Stool : 01 No.
6. : Plate Tray : 01 No.
Q. : INSTRUMENT ROOM :
1. : Air conditioner (National) 1-1/2 tonn : 01 No.
2. : Ceiling fan 56” Climax : 01 No.
3. : Tube rods Philips 4’ : 02 Nos.
4. : Table fixed with walls : 03 Nos.
5. : Wooden shelf with glass doors : 01 No.
6. : Chair wooden : 03 Nos.
R. : CHEMICAL LABORATORY HALL NO.1 :
1. : Shelf wooden with glass doors 6×3×1 : 04 Nos.
2. : Lab: table 14×1×2-10/12 : 02 Nos.
3. : Lab: table 6-4/12×2-4/12×2-10/12 wash basin fit: 01 Nos.
4. : Lab: table 4-6/12×2-4/12×2-10/12 : 01 No.
5. : Lab: table 9-2/12×2-4/12×2-10/12 : 01 No.
6. : table 5×3-1/3×2-10/12 : 01 No.
7. : Ceiling fan 56” Climax : 07 Nos.
8. : Tube rods PHILIPS 4’ : 12 Nos.
9. : Plastic basket : 03 Nos.
10.: Plastic canes (20 lit) : 02 Nos.
11.: Exhaust Fan : 01 No.
12.: Filtration Rack : 01 No.
13.: Walk Gas Cylinder : 01 No.
14.: Chair Steel : 01 No.
S. : CHEMICAL LABORATORY HALL NO.2 :
1. : Shelf wooden with glass doors 6×3×1 : 04 Nos.
2. : Ceiling fan 56” Climax : 04 Nos.
3. : Tube rods PHILIPS 4’ : 05Nos.
4. : Chair wooden : 01 No.
5. : Water cooler 14 lit : 01 No.
6. : Jug Steel : 01 No.
7. : Lab: table 8-8/12×4-1/12×2-10/12 : 02 Nos.
8. : Lab: table 8-9/12×2-10/12×2-4/12 Basin fitted: 01 Nos.
9. : Lab: table 4-5/12×2-4/12×2-10/12 do : 01 No.
10.: Lab: table 6-8/12×2-4/12×2-10/12 do : 01 No.
11.: Exhaust Fan : 01 No.
T. : MINERAL PROCESSING/TRACING SECTION NO.1:
1. : Ceiling fan 56” Climax : 01 No.
2. : Chair steel legs : 02 Nos.
3. : Chair Wooden : 01 No.
4. : Table 4×3×2-10/12’ : 01 No.
5. : Almirah wooden with glass doors : 01 Nos.
6-1/2×4-1/2×4-1/2×1’
6. : Tube rods Philips 4’ (Broken) : 02Nos.
7. : Electric bracket with glass globe : 01 No.
8. : Table 4×3×2’/2 : 02 Nos.
9. : Wooden stool : 01 No.
10.: Table glass : 01 No.
U. : ROOM NO.2 :
1. : Ceiling fan 56” Climax : 01 No.
2. : Tube rods Philips 4’ : 02Nos.
3. : Lab: Table 9-8/12×3×2-10/12’ : 01 No.
4. : Lab: Table 9-8/12×3×2-4/12×2-10/12’ : 01 No.
5. : Air conditioner (National) 1-1/2 tonn : 01 No.
6. : Water cooler : 01 No.
V. : ROOM NO.3 (PROCESSING LABORATORY):
1. : Ceiling fan 56” Climax : 06 Nos.
2. : Tube rods Philips 4’ : 10 Nos.
3. : Table 4×2×2-10/2 : 01 No.
4. : Lab: Table 25×2-4/12×2-10/12 : 01 No.
5. : Lab: Table 11-8/12×4-1/12×2-10/12` : 01 No.
6. : Exhaust Fan : 01 No.
W. : FIRI ASSAY ROOM :
1. : Shelf wooden with glass doors 6×3×1 : 02 Nos.
2. : Ceiling fan 56” Climax : 01 Nos.
3. : Table fitted with wall 4-1/2×2×3 : 01 No.
4. : Table fitted with wall 9-1/2×3×3 : 01 No.
5. : Table Steel 4×2×3 : 01 No.
6. : Table Steel 4×1×3 : 01 No.
X. : PETROGHRAPHIC SECTION ROOM NO. 1 :
1. : Ceiling fan 56” Climax : 01 Nos.
2. : Shelf wooden with glass doors 6×3×4 : 02 Nos.
3. : Tube rods PHILIPS 4’ : 02 Nos.
4. : Lab: Table 7×2-4/12×2-10/12 : 01 No.
5. : Office table with 2 drawers : 01 No.
6. : Steel Almirah 6×3 : 01 No.
7. : Chair Steel : 01 No.
Y. : ROOM NO. 2 :
1. : Ceiling fan 56” Climax : 01 Nos.
2. : Tube rods PHILIPS 4’ : 02 Nos.
3. : Lab: Table 10×2-4/12×2-10/12 Basin fitted: 01 No.
4. : Lab: Table cover shelf 10×2-4/12×2-10/12: 01 No.
5. : Exhaust Fan : 01 No.
6. : Waste paper basket : 01 No.
7. : Kitchen Heater : 01 No.
8. : Water cooler : 01 No.
Z. : ROOM NO. 3 :
1. : Ceiling fan 56” Climax : 02 Nos.
2. : Tube rods PHILIPS 4’ : 04 Nos.
3. : Chairs (Steel legs) : 02 Nos
4. : Lab: Table Basin fitted 15-6/12×2-10/12: 01 No.
5. : Table 4×3-3/12×2/12 : 01 No.
6. : Lab: Table 8×2-11/12×2-4/12×2-10/12 : 01 No.
AA. : SAMPLE PREPARATION SECTION ROOM NO.1:
1. : Ceiling fan 56” Climax : 02 Nos.
2.: Tube rods PHILIPS 4’ : 03 Nos.
3. : Steel chairs : 01 No.
4. : Lab: Table Basin fitted 5-10/12×2-4/12×2-10/12: 01 No.
5. : Table with Rixin : 01 No.
6. : File Cabinat Steel (3 drawers) : 01 No.
7. : Chair Wooden : 01No.
8. : Table with Dust covering : 01 No.
9. : Revolving stool : 01 No
AB. : ROOM NO.2:
1. : Ceiling fan 56” Climax : 02 Nos.
2.: Tube rods PHILIPS 4’ : 04 Nos.
3. : Table 4×3×2-10/12 with dust covering : 01 Nos.
4. : Table 2×2-1/2×2-10/12 with dust cover: 02 Nos.
5. : Stool Wooden : 02 Nos.
6. : File cabinat (4 drawers) : 01 No.
7. : Vacuum Pump ( for carpet clearing) : 01 No.
AC. : SENIOR MINERAL PROCESSING ENG: OFFICE:
1. : Ceiling fan 56” Climax : 02 Nos.
2. : Tube rods Philips 4’ : 04 Nos.
3. : Air conditioner (National) 1-1/2 tonn : 01 No.
4. : Electric Bracket with glass globs : 02 Nos.
5. : File Cabinat Steel (4 drawers) : 01 No.
6. : Office Table with four drawers & side cupboard: 01 No.
7. : Table glass 5-1/2×3’ : 01 No.
8. : Chair (Rexien) with arm wooden : 06 Nos.
9. : Wooden Rack : 01 No.
10.: Carpet 12×12’ : 01 No.
11.: wooden cupboard (glass door) 4×6’ : 01 No.
12.: Notice Board : 01 No.
13.: Ash tray : 01 No.
14.: Room Heather : 01 No.
15.: Plastic Tray : 01 No.
16.: Wall Clock : 01 No.
AD. : MEETING ROOM/LIBRARY :
1. : Air conditioner (National) 1-1/2 tonn : 01 Nos.
2.: Ceiling fan 56” Climax : 06 Nos.
3. : Tube rods Philips 4’ : 12 Nos.
4. : Curtain for Windows : 14 Nos.
5. : Carpet synthetic (Room size) : 01 No.
6. : Map Board 6-1/4×4-1/4’ : 01 No.
7. : Map Board 8-1/4×4-1/4 : 01 No.
8. : Magic board with stand : 01 No.
9.: Dining Table 5×3×2-1/2 : 02 Nos.
10.: Tracing table : 01 No.
11.: Side table 2×2×1-1/2 : 01 No.
12.: table 6×2×2-1/1 : 01 No.
13.: Chair steel : 03 Nos.
14.: Wooden Almirah with Glass Doors : 03 Nos.
15.: Steel Almarah 6×3 : 01 No.
16.: Office table with one draws : 01 No.
17.: office table with five draws : 01 No.
18.: Revolving Stool : 01 No.
19.: T.V 21” (Hinari Taiwan) : 01 No.
20.: V.C.R (Hinari Japan) : 01 No.
21.: T.V Trally : 01 No.
22.: Slid Projector : 01 No.
23.: Over Head Projector : 01 No.
24.: Screen of Projector : 01 No.
AE. : KITCHEN ROOM :
1. : Ceiling fan 56” Climax : 01 No.
2. : Electric cooking heater : 01 No
3. : Refrigerator (Not in working condition) : 01 No.
4. : Steel Almirah : 01 No.
5. : Tube rod : 01 No.
AI. : GLARY :
1. : Ceiling fan 56” Climax : 01 No.
2. : Tube rods Philips 4’ : 02 Nos.
3. : Show case : 01 No.
4. : Water cooler : 01 No.
5. : wooden stool : 01 No.
6. : K.P.M Model : 01 No.
DETAIL OF VEHICLES, MINERAL TESTING LABORATORY, SDA
AS ON 30/06/2001
S.NO. VEHICLES NO. MAKE/MODEL
1. A-3171 Suzuki Jeep Potohar
Model- 1990
2. A-3572 Toyota Hiace (Ambulance)
Model-1991
3. A-3916 Toyota Pick-up Double Cabin
Model-1992
PHYSICAL VERIFICATION OF CAPITAL ITEMS
MINERAL TESTING LABORATORY AT CHEMICAL
LABORATORY SECTION AS ON 30/06/2001.
S. NO. DESCRIPTION/
SPECIFICATION
QUANTITY PLACE
WHERE
INSTALLED
REMARKS.
1. Atomic Absorption
Spectrophotometer Philips
U.K. Model No. PU-9100X
01 No. AA Room No. 1
2. Various Cathode lamps and J.
Juniper and Co. England
Out of total 29
Nos.
29 Nos.
02 Nos. (for iron)
AA Room No. 1 cathode lamps
3. Fume Extraction Hood with
Fan Motor
01 No. AA Room No. 1 are expired
4. PH meter large Coming M-
240USA
01No. U.V. room
5. UV Visible Spectrophotometer
PU-8625 PHILIPS England
01 No. UV Room
6. Line Voltage Regulator PE-
1413
03 Nos. One No. in AA
Room One No.
in UV Room and
One No. in
Balance Room
7. Water Bath (Grant type JBI) 02 Nos. Chemical Lab 2
8. Heating Box for hotplate 01 No. Chemical Lab 2
9. Fume Cupboard Nordia
England
03 Nos. 02 Nos. in Lab 1
01 No in Lab 2
10. Fume Cupboard perchloric
acid Nordia England
01 No. Laboratory No. 2
11. Hot plate 03 Nos. 02 Nos. in Lab 1
01 Nos. in Lab 2
12. Hotplate regulator 01 No. Laboratory No. 1
13. Water still (Distillation plant)
Aquatron ABS.
01 No. Laboratory No. 1
14. DE-ioniser Micromeg England 01 No. UV room
15. Swirl Mixer 01 No. Laboratory No. 2
16. Box shaker (shaking machine)
Model Voss Burgess Hill.
01 No. Laboratory No. 2
17. Oven Mido/3/SS/F 02 Nos. Laboratory No. 1
18. Muffle Furnace Carbolite 01 No. Laboratory No. 1
19. Platinum crucible 02 Nos. Laboratory No. 1
20. Balance metler. 01 Nos. Balance room
21. Balance top loader. 01 No. Balance room
22. Refrigerator Small Candy 01 No. Laboratory No. 2
(YAQOOB
KHAN)
Asstt: Stor Keeper
M.T.L
(MOHAMMAD
MUSTAJAB
KHAN)
Assistant Chemist
M.T.L
(GHULAM
AHAD)
Lab: Technician
M.T.L
(MUEEN
KHAN)
Senior Chemist
M.T.L
PHYSICAL VERIFICATION OF CAPITAL ITEMS
SDA, ENVIRONMENTAL STUDIES PROJECT AS ON 30/06/2001.
S. NO. DESCRIPTION/
SPECIFICATION
QUANTITY PLACE WHERE
INSTALLED
REMARKS.
1. Spectrophotometer
Spectronic-20 Digital type
with IR Filter and Tubes
complete (USA).
01 No. UV Room
2. Laboratory Conductivity
meter Jenway Model 4010
with Accessories.
01 No. UV Room
3. Gas Sampler Desaga W.
Germany
01 No. Laboratory No. 1
4. Dust sampler GRASE BY
ANDERSON with Digital
timer Flow control model
No. G-3121 USA
01 No. Laboratory No. 1
5. Carbon mono oxide test
kit LAMOTTEE Code-
7782
01 No. Laboratory No. 1
6. Voltage Stablizer 01 No. Laboratory No. 1
7. Toyota Hiace Air
Conditioned Model 1991
RHP 2400cc (Disel)
Engine No. A-3572 21
[Khyber Pakhtunkhwa]
Peshawar fitted with
sliding glasses Blood bank
refrigerator, Urine
collection kit.
01 No. MTL
(YAQOOB
KHAN)
Asstt: Stor Keeper
M.T.L
(MOHAMMAD
MUSTAJAB
KHAN)
Assistant Chemist
M.T.L
(GHULAM
AHAD)
Lab: Technician
M.T.L
(MUEEN
KHAN)
Senior Chemist
M.T.L
21Substituted vide Khyber Pakhtunkhwa Act No. IV of 2011
PHYSICAL VERIFICATION OF CAPITAL ITEMS
AT MINERAL TESTING LABORATORY AT GEOLOGY
SECTION AS ON 30/06/2001.
S. NO. DESCRIPTION/
SPECIFICATION
QTY
PHYSICALLY
PRESENT
PLACE WHERE
INSTALLED/
LOCATION
REMARKS.
1. Jaw crusher 01 No. Sample Preparat-
ion Lab:
2. Roll crusher balanced
crushing rolls Bentall
simplex Ltd England
with motor.
01 No.
3. Ring Mill, TEMA Type
Lab: Disc Mill Model
No. T-250, U.K. made
02 No.
4. Chrome Steel Pots. 02 Nos.
5. Nickel Steel Pots. 01 No.
6. Riffles Box 03 sets
7. Dust extractor, Machine
with Extraction fitting
01 No.
8. Vacuum cleaner B.V.C
Model IVIOD, U.K.
made
01 No.
9. Drying ovens Model:
A9VC, England
01 No.
10. Pestle and mortar Agate 01 No.
11. Pestle and mortar Iron. 02 Nos.
12. Pestle and mortar
Porcelain
01 No.
13. Laboratory Jaw Crusher
ESSA 1914A-92
01 No.
14. Teema Mill Labtechnics
Australia with
Chrome Small Pots
Chrome Large Pots
01 No.
01 No.
01 No.
Sample
Preparation Lab:
15. Blower Makita Blower
Model No. 4014N
01 No.
16. Riffle Box 01 set.
PETROGRAPHIC LABORATORY, MTL.
S. NO. DESCRIPTION/
SPECIFICATION
QTY
PHYSICALLY
PRESENT
PLACE WHERE
INSTALLED/
LOCATION
REMARKS.
1. Cliper with Diamond
saw for core splitting
01 No. Petrographic
Laboratory.
2. Petro-thin (Thin section)
Buehler
With
Coolant recirculation
unit.
01 No.
3. Trim Saw 01 No.
4. Ecomer-II Polisher
Buehler With Polished
block attachment Met-
sserve Autopol 1,
Buehler.
5. Hot plates, V 220-240
Watt
02 Nos.
6. Oven Model DC 240 V,
3 Amp
01 No.
7. Dessicator with Vacuum
Pump
01 No.
8. Bonding Jig (12
position)
01 No.
9. Microscope Olympus
BH2
01 No.
10. Engraver, Handy. 01 No.
11. Microscope size. 0.01-
0.25 mm
01 No.
12. Grinding Machine with
condemn blade.
01 No. On loan basis from
EX-GSIMBA
13. Discoplan thin-cutting/
grinding machine with
coolant recirculation
unit.
01 No. On loan basis from
MMEP, chitral as
per order of D/M
SDA.
MINERALOGICAL LABORATORY, MTL.
S. NO. DESCRIPTION/
SPECIFICATION
QTY
PHYSICALLY
PRESENT
PLACE WHERE
INSTALLED/
LOCATION
REMARKS.
1. Ortholux-II Pol-BK
Microsope with MPS
camera system 46/92
Leitz: WETZLAR
GERMANY.
01 set Mineralogical
Laboratory
2. Laborlux 12 POLS
Microscope Leitz: Type
090-130.020.ERNST
LEITZ
WETZLAR GMBH,
GERMANY
01 No.
3. Laborlux 12 POLS
Microscope Leitz,
Reflecting
Type 090-
130.020.ERNST LEITZ
WETZLAR GMBH,
GERMANY.
01 No.
4. M3B Stereo Microscope
Leitz: Wild Leitz,
Heerbrugg,
SWITZERLAND
01 No. Mineralogical
Laboratory
5. Miniload 2 Hardness
Tester Leitz Wetzlar,
Germany
01 No.
6. Refractometer BS,
60/70ABBE Bellingham
& Stanely Ltd England
01 No.
7. Automatic Point counter
Prior James Swift Model
F, 240-210 V,
Cambridge, England.
01 No.
8. Microscope Olympus
BH-2 PM-10-35AD-I
Japan with Camera.
01 set On loan basis
from RMEP,
Chitral as per
order of D/M
SDA.
9. UV-Lamp (Raytech)
Model R-4.
01 No.
10. Olympus Microscope 01 No.
(Biological CH-2,
Model CHS, Made in
Japan
11. Blood Bank Refrigerator
JEWETT, Buffalo, New
Yark, USA.
01 No.
PROGRAMMABLE MINERAL ANALYZER ROOM.
S. NO. DESCRIPTION/
SPECIFICATION
QTY
PHYSICALLY
PRESENT
PLACE WHERE
INSTALLED/
LOCATION
REMARKS.
1. Programmable Mineral
Analyzer
AMDEL
Model No. AM 818/20
Serial No. 792
Voltage: 220 50 Hz
Current 50W
Made in Australia
With
a) XRF Measurement Head
for Lead
Select Equation # 6 1091
b) XRF Measurement Head
for Zinc & Iron
Select Equation # 1 4790
01 No.
01 No.
01 No.
PMA Room
PHYSICAL VERIFICATION OF CAPITAL ITEMS
MINERAL PROCESSING SECTION AS ON 30/06/2001.
S. NO. DESCRIPTION/
SPECIFICATION
QTY SPECIFICATION PLACE
WHERE
INSTALLED
REMARKS.
1. Electronic Balance
20 kg
01
No.
SR 3806931 Mineral
Processing
Lab:
2. Electronic Balance
12 kg
01
No.
Returned to
Stores
Returned to
MTL Stores
3. Electronic Balance
440 gms
01
No.
SER 8101006 Mineral
Processing
Lab:
4. Electronic Balance
600 gms
01
No.
SER6300310 -do-
5. Electronic Balance
600gms
01
No.
-do- Returned to
MTL Stores
6. Mozly table 01
No.
L.S 126 -do-
7. Flotation machine 01
No.
Lab Type 0-12 -do-
8. Wet splitter
Machine
01
No.
Model RS-8W -do-
9. Dry Splitter
machine
01
No.
Model No. A-D -do-
10. Rod Mill 1 kg 01
No.
Machine No.
22122
-do-
11. Rod Mill 5 kg 01
No.
Model D-R -do-
12. Sieve shaker 01
No.
Actagon 200 -do-
13. Magnetic Separator 01
No.
MS1/2Spa 08374 -do-
14. Muffle Furnace
CSF 1200
01
No.
-do-
15. Oven 01
No.
A-9VC -do-
16. Column 04
Nos.
-do-
17. Vaccum pumps 02
Nos.
Type B 182208 Returened to
stores
01 No. is
returned to
MTL store
and 01 No. is
in the
Mineral
Processing
Section.
18. Bottle rolling
machine
01
No.
Machine No.
22126
Mineral
Processing
Lab
19. Hot plat 01
No.
-do-
20. Agitation Rig 01
No.
Model 6-Bs -do-
21. Shaking table 02
Nos.
-do-
22. Vaccum filter 02
Nos.
-do- Small size.
23. Vaccum filter 02
Nos.
-do-
24. Stereo Scope 01
No.
-do-
25. Fume cupboard
Nordia
02
Nos.
-do-
26. Sieves 09
Nos.
-do-
27. Riffle Box 03
set
-do-
28. PH meter 02
Nos.
-do-
29. Oxygen meter 01
No.
-do-
30. Prominent pump 01
No.
Type CC2200/PP-
PA
-do-
(WAZIR MOHAMMAD)
Sr. Mineral Processing Engineer
Mineral Testing Laboratory, SDA
(MEHFOOZ-UR-
REHMAN)
Lab. Technician Mineral
Testing Laboratory, SDA
(YAQOOB KHAN)
Asstt: Store Keeper
Mineral Testing
Laboratory, SDA
FIRE ASSAY ROOM
S.NO DESCRIPTION/SPECIFICATION QUANTITY PLACE WHERE
INSTALLED
REMARK
S
1. Assay Furnace 810 B DFC Ceramics
U.S.A.
01 No. Fire Assay Lab
2. Muffle Furnace Model 800 DFC
Ceramic U.S.A.
01 No. Fire Assay Lab
3. Fume Extraction.
02 Nos. Fire Assay Lab
4. Tongs.
03 Nos. Fire Assay Lab
5. Moulds.
04 Nos. Fire Assay Lab
(WAZIR MOHAMMAD) (MEHFOOZ-UR-REHMAN) (YAQOOB KHAN)
Sr. Mineral Processing
Engineer
Lab. Technician Asstt: Store Keeper
Mineral Testing Laboratory,
SDA
Mineral Testing Laboratory,
SDA
Mineral Testing Laboratory,
SDA
PHYSICAL BALANCE OF CAPITAL ITEMS IN STORE ON 30/06/2001
S.NO ITEMS QUANTITY
1. Analytical balance (used) 01 No.
2. Top loading balance (used) 01 No.
3. Conductivity meter (used) 01 No.
4. Hot plate (03 Nos. used) 04 Nos.
5. Distillation plant (used) 01 No.
6. Shacking machine (used) 01 No.
7. Tube furnace (used) 01 No.
8. P/S 2 model 50 Z (complete) (used) 01 No.
9. Display 8512 (used) 01 No.
10. Key board (used) 01 No.
11. Processor (fitted in P/S 2) (used) 01 No.
12. Rugged writer (used) 01 No.
13. Plotter (used) 01 No.
14. H.P. Laser Jet (used) 01 No.
15. Daisy wheel Printer (used) 01 No.
16. Ceiling Fans 56” climes (used) 03 Nos.
17. Vacuum Pump (used) 01 No.
18. Balance (electric) (1-2) (used) 02 Nos.
19. Revolving stools (used) 11 Nos.
20. Automatic Recording Polograph (used) 01 No.
21. Table Top Centrigugy (used) 01 No.
22. Calometer (UK) (used)
------------------------------------------------------------------------------------------------------
(YAQOOB KHAN)
Assistant Store Keeper
Mineral Testing Laboratory
FURNITURE AND FIXTURE OF R.M.E.P. CHITRAL
S.N
O
Name of item Qty
1. Show case. 01 No.
2. File Rack Large size. 02 Nos.
3. Rack for sample. 01 No.
4. Table small size ordinary.
01 No.
5. Office table size 42” x 30”. 02 Nos.
6. Office table size 4x2½ x 2½ 01 No.
7. Office Table 30 x 34 x 53 02 Nos.
CAMPING EQUIPMENTS OF R.M.E.P CHITRAL
S.N
O
Name of item Qty
1. Folding Charpae. 02 Nos.
2. Folding table hard board. 03Nos.
3. Charpae made of G.I. Pipe/ Bon. 08 Nos.
4. Tent Gureila small.
04 Nos.
5. Chowldary tent D/F1 01 No.
6. Tent Water Proof 14 x 14. 02 Nos.
7. Folding Steel Rod chairs. 01 No.
8. Hurrican Lamp Large. 06 Nos.
9. Sleeping Bags. 06 Nos.
10. Chairs steel folding. 03 Nos.
11. Wooden Stool. 03 Nos.
12. Folding Table. 01 No.
DEPUTY DIRECTOR, EXPLORATION PROMOTION DIVISION, DGMM
OFFICE CHITRAL
Detail of Furniture Equipments in respect of R.O.P.E Chitral
S.
No.
Name of item Qty Date of
received
Actual
value
Depreciati
on value
W.D.
value
Remarks
1. Almirah size 4x4 for
Map
01 6/02 2800 1145 1655
2. Bench Wooden size 72”
x8x36”
01 6/88 400 342 58
3. File Rack size 30”x36
(5x1)
06 9/90 4200 3496 704
4. File Rack size 26x30 02 6/87 500 435 65
5. Office Table formica
size 3x4
01 6/87 1250 1078 172
6. Office Table
30’x34’x53
02 6/87 3600 3110 490
7. Office Chairs plastic can 04 6/87 1200 1050 150
8. Office chairs (walmate) 04 6/91 1920 1522 398
9. Office Table (vem
board)
01 6/91 4480 3645 835
10. Office Table 5x3 01 6/90 2000 1664 336
11. Show case size 4’x3’ 01 6/02 5675 2321 3354
12. Show case size 4’x4½ 01 6/02 4000 1637 2363
13. Side Rack (walmat) 01 6/91 480 387 93
14. Steel Almirah size
6x3x1
01 6/90 4495 3742 753
15. Steel Almirah 01 6/87 1200 1050 150
16. Steel cabinet 01 6/87 1250 1095 155
17. Wooden Almirah
18x7x5½
01 10/89 2800 2330 470
Mining Equipments
1. Diesel Generator 10
KVA
01 6/92 194995 154843 40152
FURNITURE /FIXTURE OF REGIONAL MINERAL EXPLORATION
PROJECT, BATKHELA, (MALAKAND)
S.N
O
Name of item Qty
1. Wooden Table 6x4½x4½ 03 Nos.
2. Wooden table 5x3x2½ 03Nos.
3. Wooden Racks small size 03 Nos.
4. Wooden Chairs Raxine Seats.
08 Nos.
5. Chair Steel Arm. 03 Nos.
6. Chair Wooden plastic canning. 04 Nos.
7. Drawing Box. 01 No.
8. Wooden stool. 02 Nos.
9. Tracking Table wooden 01 No.
MINING MACHINERY OF REGIONAL MINERAL EXPLORATION
PROJECT BATKHELA (MALAKAND)
S.N
O
Name of item Qty
1. Gold Pan Plastic D/size 10 Nos.
2. Hand Lenses 05 Nos.
3. Brunton compass 01 No.
4. Microscope Pocket
04 Nos.
5. Flagging Tape 22 Nos.
6. Geological Hammer. 01 No.
7. Kit Bag. 02 Nos.
8. Shoval folding. 04 Nos.
9. Digital plaimeter. 02 Nos.
10. GPS (Global positioning system) 02 Nos.
11. GPS (Global Positioning system) 02 Nos.
12. Topcon Stereo scope pocket. 03 Nos.
13. Mirror Stereo scope Topcon. 02 Nos.
14. Theodolite. 01 No.
15. Drawing Drafting Machine Pentax. 01 No.
16. Honda Generator. 02 Nos.
17. Sieve D/size. 07 Nos.
18. Pick Axe. 02 Nos.
LIST OF STORE ITEMS OF RMEP HAZARA DIVISION (CLOSED)
S.N
O
Name of item Qty Condition Remarks
51. Office Table wooden size 5’x3x2½ 10 No. Unserviceable Transferred
from KLZP
52. Office wooden table size 4’x2x2½
Two draws
01 No. -do- -do-
53. Office chairs wooden with arms. 04 Nos. -do- -do-
54. Rack steel size 3’x2x2½
02 Nos. -do- -do-
55. Water cooler Rayal 16 Liters. 01 No. -do- Handed
over to
Gemstone
Training
Project
Malakand
56. Magnifying lens. 01 No. -do- -do-
LIST OF STORE ITEMS OF RMEP HAZARA DIVISION AS ON AUGUST 2001
S.N
O
Name of item Qty Condition Remarks
01. Ammonia Printing machine model
Neolt 3 Tubes Sr. No. 281094-
3T220V-50-H2612 A Made in Italy.
01 No. Repairable
Serviceable
R M E P
02. Fire Extinguisher/ 01 N0. -do- -do-
03. Hand Lense 10x 05 Nos. -do- -do-
04. Pocket Microscope 25x 05 Nos. -do- -do-
05. Global Position System (GPS) sony
(360)
02 Nos. -do- -do-
06. Global position system (GPS) sony
(760) with accessories.
01 No. -do- -do-
07. Topcon Pocket Stereoscope (S-T) 02 Nos. -do- -do-
08. Mirror stereoscope Topcon Model
MS-3 Japan.
01 No. -do- -do-
09. Canon Photo copier machine No.
1010
01 No. -do- -do-
10. Stabilizer 500 watts. 01 No. -do- -do-
11. Over Head Projector Machine M910 01 No. -do- -do-
12. Digital Plannimeter-KP-90 No. 03 Nos. -do- -do-
13. Electric Distance Machine. 01 No. -do- -do-
14. Theodolite Machine with stand and
with accessories.
01 No. -do- List of
Kohistan Lead
Zinc Project
Besham
(closed) store
items left from
auction
15. Aluminum Levellling staff. 02 Nos. -do- -do-
16. Pencil Magnitic scriber. 02 Nos. -do- -do-
17. Ranging Rods. 10 Nos. -do- -do-
18. Binacular. 01 No. -do- -do-
19. Calculator casino Fx99 1 W 02 Nos. -do- R M E P
20. Calculator Fx 100 D 01 No. -do- -do-
COMPUTERS
S.NO DESCRIPTION/
SPECIFICATION
QTY
PHYSICA
LLY
PRESENT
PLACE
WHERE
INSTALLE
D/
LOCATIO
N
Remarks
01. Computer Eroo-XT-10 with Monitor
IBM keyboard and Mouse.
01 set PMA room
02. Printer EPSON LX-400 01 set Computer
room
03. Computer IBM PS-2 (C.P.U) and
Acer Keyboard, Acer view VGA
Monitor.
01 set PA room
04. Computer COMPAC Prolinea 4/33
with colour Monitor compact,
Compac keyboard and mouse.
01 set Computer
room
05. Power safe 500 Critic Stablizer 01 No. Computer
room
06. UPS model SP11-550 01 set “
07. Computer C.P.U Acermate
386SX/20N, IBM personal system/2
Color Display (Monitor) and IBM
keyboard with extension.
01 set “
08. OKI Microline 321 Elites 9 pin
printer.
01 No. “
09. HP 500 Deskjet Printer. 01 No. “
10. Digitizer GTCO. 01 No. “
11. Plotter GTCO. 01 No. “
12. Computer Pentium with SVGA card
monitor, 104 Keyboard and Champ
Mouse/ with extension.
01 set. “
13. Canon BJC-210 P Color Bubble Jet
Printer.
01 No. “
14. Acer Prisa 620 P Scanner. 01 No. “
15. Printer EPSON FX-1050. 01 Nos. “