the 13km ruc - nearing implementation at ncep changes, testing, plan aviation weather center –...

66
The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage Dezso Devenyi Georg Grell Bill Moninger Steven Peckham Barry Schwartz Tanya Smirnova Tracy Lorraine Smith Steve Weygandt Geoff Manikin – NCEP/EMC RUC web site - http://ruc.fsl.noaa.gov

Upload: ashlyn-ross

Post on 29-Jan-2016

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

The 13km RUC - Nearing Implementation at

NCEPChanges, testing, plan

Aviation Weather Center – Monday 16 May 2005

Stan BenjaminJohn BrownKevin BrundageDezso DevenyiGeorg GrellBill MoningerSteven Peckham

Barry SchwartzTanya SmirnovaTracy Lorraine SmithSteve Weygandt

Geoff Manikin – NCEP/EMC

RUC web site - http://ruc.fsl.noaa.gov

Page 2: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

2

2005- Implementation of 13km RUC in operations at NCEP

• Assimilation of new observations - GPS-precipitable water improved moisture forecasts

- METAR cloud/vis/current weather improved ceiling and vis fcsts

- Mesonet - 915 MHz boundary-layer profilers915 MHz boundary-layer profilers, RASS

temperatures- Soil moisture/temp nudging

2005Model changes – New versions of - mixed-phase cloud microphysics (NCAR-FSL) - Grell-Devenyi convective parameterization

- Revised radiation – cloud effects- Corrected treatment of frost formation

improved icing and convection forecasts, cloud/sfc temp, vis forecasts

• Improved post-processing – visibility, precip type, 20km/40km look-alike

• Hourly forecasts to be extended to 9h from 3h duration

(at 01z, 02z, 04z, 05z, …)

Page 3: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

3

What is different qualitatively in precip/surface behavior with the RUC13?

- Definitely a ‘wetter’ model than the previous RUCs

- Surface dewpoint, moisture aloft- CAPE- Precipitation

- But ‘drier’ over warm oceans

AREA FORECAST DISCUSSION...UPDATE NATIONAL WEATHER SERVICE GOODLAND KS 1155 AM MDT SUN MAY 8 2005

.UPDATE... A SHORTWAVE TROF WAS EVIDENT THIS MORNING AT BOTH 700 AND 500 MB OVER SOUTHEAST WYOMING...SPREADING TOWARD THE TRI STATE AREA IN NORTHWESTERLY FLOW ALOFT. THE ETA/NAM WAS HANDLING THIS FEATURE WELL. THE RUC IS A BIT TOO DRY.

Page 4: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

4

2005 - 13km RUC implementation plan

February-May 2005- Real-time parallel testing – EMC- Intercomparison RUC13 vs. RUC20 by EMC, FSL

- daily inspection w/ graphics, statistics (raob, surface)- Transfer afterward to NCEP/NCO

May-June 2005- Real-time parallel testing – NCO- 4-week field test evaluation – NWS regions, AWC, SPC…

*** STARTING NEXT WEEK- Retrospective testing (at NCEP) for cold season- Report on testing to EMC, NCEP directors

~ June-July 2005- Operational implementation

Page 5: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

5

13km RUC

Improvements expected from 13km RUC- Improved near-surface forecasts- Improved precipitation forecasts- Better cloud/icing depiction- Improved frontal/turbulence forecasts

20km RUC

Terrain elevation - 200 m interval

NCEP computer upgrade allows RUC13 to run in same time as current RUC20

Page 6: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

6

RUC History – NCEP (NMC) implementations

1994 - First operational implementation of RUC- 60km resolution, 3-h cycle

1998 – 40km resolution, 1-h cycle, - cloud physics, land-sfc model

2002 – 20km resolution- addition of GOES cloud data in assimilation

2003 – Change to 3dVAR analysis from previous OI(April)

2005 – 13km resolution, new obs, new model physics(estimated ~June-July)

2007 – WRF-based Rapid Refresh to replace RUC

Page 7: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

7More detailed coastline with 13km resolution

13km RUC 20km RUC

Soil moisture – 22z - 21 Feb 2005Dark blue = water

Page 8: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

RUC 3DVAR development/testing

RUC Analysis Goals• Initial fields that yield very accurate

short-range forecasts (down to 1-h): - upper-level wind forecasts- aviation hazards (turbulence, icing,

ceiling/visibility)- surface sensible weather forecasts

• Hourly assimilation of all conventional observations, including surface observations

• Close analysis fit to all observations, especially METAR and rawinsonde

Page 9: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

• 13-km 3DVAR running at FSL since summer 2004, NCEP testing in progress

5 aspects of RUC13 3DVAR analysis:

1. New observations assimilated

2. Cloud analysis (GOES, METAR ceiling/vis/curr-wx)

3. Use of surface obs throughout PBL (NCEP Fall 2004)

4. Revised control variable for moisture (pseudo-RH)

5. Soil moisture/temp nudging

Page 10: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

Observations used in RUCData Type ~Number Freq.--------------------------------------------------Rawinsonde 80 /12hNOAA profilers 30 / 1hVAD winds 110-130 / 1h Aircraft (V,temp) 1400-4500 / 1hSurface/METAR 1500-1700 / 1hSurface/METAR 1500-1700 / 1hBuoy/ship 100-150 / 1hGOES precip water 1500-3000 / 1hGOES cloud winds 1000-2500 / 1hGOES cloud-top pres 10 km res / 1hSSM/I precip water 1000-4000 / 6h--------------------------------------------------GPS precip water ~300 / 1hMesonet ~5000 / 1hPBL – prof/RASS ~25 / 1hMETAR-cloud-vis-wx ~1500 / 1h--------------------------------------------------

NC

EP

R

UC

20

op

era

tion

al

RUC13

(at NCEP June 2005)

Cloudanalysisvariables

Page 11: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

11

Obs quality issues with RUC13

• Mesonet data• Winds of questionable quality – widespread siting, anemometer height problems• Will be later added from approved mesonet providers (e.g. OK Mesonet)• Assigned larger obs errors

• Boundary-layer profilers • Implementation deferred (decision – 6 May 05)• Quality appears to be poorer than NOAA-network profilers – better monitoring needed

• Rawinsonde moisture profiles• Intermittently shows incorrect saturation in lowest 200 mb• Detected in RUC13 processing using GPS PW neighbors

Page 12: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

Use multiple data types to modify cloud,hydrometeor, and moisture fields:

-- GOES cloud-top pressure/temp(implemented in 2002 w/

RUC20)-- Surface METAR (clouds, weather, visibility)

(2005 w/ RUC13)

• Construct 3-d logical arrays (YES/NO/UNKNOWN)

for clouds and precipitation from all info

• Clear/build moisture, cloud, precipitation fields

• Safeguards for known problems (marine stratus,

convective clouds, snow, nocturnal inversion)

RUC Cloud Analysis

Page 13: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

-Nearest station up to 100 km distance- Assigned in ASL, includes terrain intersection for low clouds

- Maps info to 3-d cloud, precip. Y/N/U arrays - Change cloud water, cloud ice, water vapor fields as follows: Build for BKN / OVC / Vertical Visibility - 40 mb thick layer (2+ model levels) - 150 mb thick for precip. + GOES clouds - Can build multiple broken layersClear - Up to cloud base (if needed) - to 12,000 feet for CLR report

Assimilation of METAR cloud/wx/visBetter analysis, prediction of ceiling and visibility

Page 14: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

analysis – withMETAR cloud/visibility obs

Cloud water mixing ratio

Sample modificationof cloud water from METAR cloud/weather/visibility observations

Cloud water mixing ratio

400Pres(mb)

-500-

-600-

-700-

-800-

-900-

1000

1700 UTC 27 Jan 2004

Background(previous1h fcst)

RelativeHumidity

Page 15: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

15

IFRLIFR VFR CLR MVFR

Sample ceiling analysis impact

Ceiling from RUC hydrometeors

AnalysisWITH

cld/wx/vis obs

AnalysisNO

cld/wx/vis obs

Aviation Flight Rules

cloud ceiling height (meters)

1800 UTC 17 Nov 2003

Observations

Page 16: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

16

GPS precipitable water observations~200-300/h - All-weather obs

Page 17: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

17

Analysis fit to GPS precipitable water obs over CONUS

RUC20

RUC13RMS difference

Bias

Page 18: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

18

3h forecast fit to GPS precipitable water obs over CONUS

RUC20

RUC13

RMS difference

Bias

Page 19: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

19

RUC enhancements:

1. Use of METAR obs throughboundary-layer depth (Sept 04)

2. Assimilation of GPS precipitable

water observations (RUC13 - ~Jun05)

CAPE impact from two RUC enhancements

3h fcst WITHenhancements

3h fcstOPERATIONAL

0000 UTC 21 Apr 2004

Severe reports

NWS SPCNorman, OK

Tornadoes

Page 20: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

20

• September 2004 – Change to oper RUC20 analysis

– use boundary-layer depth in assimilation of surface/METAR obs better temp/dewpoint/CAPE/convection forecasts

Spring 2005 – Will be first convective season to see effect of PBL-based assimilation. Also will be evident in RUC13 results.

Page 21: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

21

Problems with model PBL structure in RUC analysis

Sounding structure is sometimes not realistic and does not account for boundary-layer depth

No accounting in current RUC analysis for vertical correlation of forecast error near surfacebased on estimated boundary-layer depth

Page 22: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

22

PBL-based METAR assimilationProblem: Representativeness of sfc data in PBL not usedDesign: Use METAR data through PBL depth from 1h fcst Create extra pseudo-residuals (obs-bkg) in PBL

RUC oper analysis18z 3 Apr 02IAD

Original slides from April 2004

Page 23: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

23

PBL-based METAR assimilation

Use METAR data through PBL depth from 1h fcstRUC oper analysis

18z 3 Apr 02IAD

x xxx

Effect of PBL-basedMETAR assimilation

Page 24: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

24

EMC/Geoff Manikin RUC20/13 comparison web pagehttp://www.emc.noaa.gov/mmb/ruc2/para

Page 25: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

25

EMC/Geoff Manikin RUC20/13 comparison web pagehttp://www.emc.noaa.gov/mmb/ruc2/para

Page 26: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

26

Revised moisture analysis design in RUC13 – pseudo-RH

Current RUC20• Separate analyses of in-situ moisture observations and precipitable water obs with intervening recalculation of observation innovations• Use of log (water vapor mixing ratio-qv) as analysis control variable for moisture.

• Some good characteristics (continuous in 3-d space, will not go negative) but not ‘responsive’ to increase RH (e.g., from 10% to 50%)• Related to summer 2004 RUC analysis fixes to avoid CAPE noise problems

Revised RUC13• Fully integrated moisture analysis with both in-situ and precipitable water obs treated together• Uses pseudo-RH (RH relative to background sat qv) as analysis control variable

Page 27: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

27

RUC13-exp

RUC20-ops

RUC13 matches moisture profiles much better than OperRUC20

• Use of pseudo-RH moisture control variable instead of Log (water vapor mixing ratio) used in RUC20.

TUS soundings – 12z 18 April 2005

Page 28: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

28

RUC13-exp

RUC20-ops

RUC13 forecast soundings at TUS also better than RUC20 - Reasons• Assimilation of GPS PW• Improved soil moisture in RUC13

• Better physics/assimilation, soil nudging

TUS soundings – 12z 18 April 2005

RUC 6h forecasts valid 12z

Page 29: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

29

36h afterrestoration of oper RUC20 soil moisture

Oper RUC20

Para RUC13

6h fcst valid 00z Analysis valid 00z

2m dewpoint- 00z 22 Apr 05 - excessivedryness in RUC20

Page 30: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

30

RUC13 analysis – includes nudging of soil moisture and temperature

Dependent on:• 2m T/Td 1h forecast errors• Only in daytime (zen angle > 0.3) with no clouds or precipitation (defined after METAR/GOES cloud assimilation)

Developed as part of NOAA New England High-Resolution Temperature (NEHRT) Program- FSL, ETL, NSSL, NCEP/EMC

Oper RUC20

Para RUC13

Page 31: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

31

Oper RUC20

Para RUC13

Page 32: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

32

Typical CAPE effect from improved soil moisture and moisture analysis in RUC13

12h forecastsValid Thur evening00z- 5 May 05

Oper RUC20

Para RUC13

Page 33: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

33

Typical CAPE effect from improved soil moisture and moisture analysis in RUC13

Para RUC13

Oper RUC20

More convective precip inRUC13 over land, less over ocean

CAPE

0-12h prec

Page 34: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

34

Typical CAPE effect from improved soil moisture and moisture analysis in RUC13

Page 35: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

35

MODEL PHYSICS CHANGES FOR RUC13

-Land-surface model: When ground temp < 0°C, vapor deposition on ground now based on ice saturation, not water * Diminishes unrealistic widespread nighttime fog formation, especially over snow cover

Evident in real-time comparisons between RUC13 and oper RUC20 for visibility forecasts, especially at night.

Page 36: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

36

Test of Ice Saturation for Surface Latent-heat Flux

13 Apr 2004 - 18h fcst valid 06z

Oper RUC20 Revised RUC20

Cloud-water mixing ratio at lowest model level

Reduction in fog, especially over snow.Much improved visibility forecasts, avoids high bias

Page 37: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

37

RUC13 Model Physics Changes (cont)

-Convection (Grell-Devenyi scheme) * Empirically estimated ensemble weights to improve quantitative precipitation forecasts

RUC20 - dCAPE/dt- Kain-Fritsch – CAPE relaxation- low-level vertical velocity- moisture convergence

RUC13 - adds Arak-Schu scheme for cloud work fn

- no KF over ocean, reweighted all closures• Addition of convection-inhibition ensemble members

• CAPE dp – 25, 75, 125 mb – fn ( TKE)• Does not produce significant outflows (slightly more in RUC13)• Still no shallow convection in RUC13 Grell-Dev scheme

• Still much less sounding modification than NAM/BMJ• Eliminated extreme surface drying showing up in certain situations

Page 38: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

38

RUC13 Model Physics Changes (cont)- Microphysics [NCAR and FSL]

Overall goal: To incorporate best understanding of “warm-rain” and mixed-phase processes important for cold-season aviation operations (inflight icing, pre-takeoff deicing requirements, low ceiling, visibility) into operational NWP models. Major changes for RUC13 • Dropsize distribution now transitions

between drizzle and rain • Replace Kessler with Barry-Reinhardt autoconversion (collision-coalescence cloud droplets to rain) Correct ice-particle accretion (ice snow more readily) Ice particle fall speed no longer set to 1 m/s

Page 39: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

39

RUC13 Model Physics Changes (cont)

* - Snow

- Diagnosis of snow-particle size distribution - Operational RUC20: - Depends on snow mixing ratio - RUC13: - Depends on temperature

- Graupel

- Growth/depletion via deposition/sublimation: Change size distribution from gamma to inverse exponential

- Results in less graupel

Page 40: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

40

EAST COAST BOMB 22-23 JAN 2005RUC13 9h Forecast for 0900 UTC 23 Jan

Sfc wind, temp, 3-h pcpnPrecipitation type

Snow

Rain

X-sec

Page 41: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

41

HYDROMETEOR CROSS SECTIONS

RUC13 RUC20 - OPER

CLOUD-WATER MIXING RATIO (qc)

Atlantic MA ME

RUC 9h Forecasts for 0900 UTC 23 Jan

Page 42: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

42

Hydrometeor Mixing Ratios (Cont)RAIN WATER (qr)

RUC13

Atlantic MA ME

Oper - RUC20

More rain in RUC13 – different rain processes

RUC 9h Forecasts for 0900 UTC 23 Jan

Page 43: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

43

Hydrometeor Mixing Ratios (Cont)CLOUD ICE (qi)

RUC13 Oper RUC20

Atlantic MA ME

Less ice in RUC13 – modified ice-particle accretion

RUC 9h Forecasts for 0900 UTC 23 Jan

Page 44: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

44

Hydrometeor Mixing Ratios (Cont)SNOW (qs)

RUC13 Oper RUC20

Atlantic MA ME

More snow in RUC13 – modified ice-particle accretion

RUC 9h Forecasts for 0900 UTC 23 Jan

Page 45: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

45

Hydrometeor Mixing Ratios (Cont)GRAUPEL (qg)

RUC13 Oper RUC20

Atlantic MA ME

Less graupel in RUC13 More supercooled liquid water (important for icing/aviation)

RUC 9h Forecasts for 0900 UTC 23 Jan

Page 46: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

46

RUC13 Model Physics Changes (cont)

- Coupling between physics processes * Reduction of cloud attenuation coefficients for

shortwave and longwave transmission to match WRF/MM5

* Effects of microphysics changes (more ice fallout - results in less Cirrus, Cirrostratus) on radiation budget and surface temperature forecasts

* Detrainment of hydrometeors from convection to the grid scale – More latent heating due to freezing on explicit scale in convection

Page 47: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

47

2004/05 - 13km RUC testing

Fall 2003 - 13km RUC model real-time testing started- Initialized from 20km analysis, run 4x daily

May 2004 – Full 1-h cycle testing started

Evaluation - FSL verification – against raobs, sfc, precipitation obs - 13km RUC vs. backup RUC – raob

- NOAA New England High-Resolution Temp Project - ETL, NSSL evaluation - June-Sept 2004

- Experimental use in NWS Central and Eastern Region WFOs

- July 2004 – current - Available via LDM from FSL (contact Tracy Smith)- NCEP pre-implementation testing started – Jan 05

Page 48: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

48

RUC20

RUC13

6h precipitation forecastValid 18z Thurs 30 Sept 2004RUC20 (oper) vs. RUC13

Page 49: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

49

Obs radar - 0235z - 31 Mar 05

RUC13 9h fcst - valid 03z- 31Mar05

RUC20 9h fcst - valid 03z - 31 Mar 05

Page 50: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

50

Obs radar - 0115z - 12 May 05

RUC13 12h fcst - valid 03z- 12May05

RUC20 12h fcst - valid 03z- 12May05

Page 51: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

51

CAPE

Oper RUC20

Exp RUC13

Improved moisture analysis in RUC13 – pseudo-RH instead of ln-qv- use of GPS PW

Thursday 21 April 2005 – 12z

Page 52: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

52

Thursday 21 April 2005 – 12z

Oper RUC20

Exp RUC13

Improved moisture analysis in RUC13 – pseudo-RH, GPS PW

Radar summary – 1400z

Page 53: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

53

RUC20 vs. RUC13 precipitation forecast (12h) verificationWinter –Jan-Feb 05 (verified w/ NCEP 24h precip analysis)

RUC13-higher equitable threat score- bias closer to 1

Why?- Improved initial conditions- Improved precip physics- Higher horizontal resolution

Page 54: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

54

RUC20 vs. RUC13 precip forecast – 24h period ending 12z - 12 Feb 2005 (verified w/ NCEP 24h precip analysis)

RUC20

RUC13

obs

(inches)

Page 55: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

55

Ceiling analysis: comparison of Operational RUC (top) with the NCEP RUC13 (bottom)

Scale (AGL): x 1000 ft

Analyses at 1800 UTC on 9 May

Page 56: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

56

Observations: cigs <= 5000 ft only

Observations: cigs <= 500 ft onlyPoint observations at 1800 UTC 9 May, for different ceiling heights, to compare to previous figure. 4 areas of lower cigs are apparent. -New England: Better coverage of lower cigs by RUC13 looks good. -Northern Plains/Midwest: more coverage of lower cigs in RUC13, tho similar coverage for very lowest categories. Again, obs for aob 5000 ft cigs support RUC13. -West Coast: both have lower cigs in LA area. More coverage on RUC13 in intermountain west, not sure if this is overdone or not. -Northeast TX: RUC13 looks better here.

Observations: cigs <= 3000 ft only

Page 57: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

57

Ceiling 1h forecasts: comparison of Operational RUC (top) with the NCEP RUC13 (bottom)

Scale (AGL): x 1000 ft

Forecasts at 1900 UTC on 9 May

Page 58: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

58

Ceiling 3h forecasts: comparison of Operational RUC (top) with the NCEP RUC13 (bottom)

Scale (AGL): x 1000 ft

Forecasts at 2100 UTC on 9 May

Page 59: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

59

Focus on the Midwest and Northern Plains. Quite a few obs have cigs < 3000 ft, but only a few lower vis reports. It does appear that low clouds lurk JUST east of the eastern WI shoreline, like what was found in the RUC Operational run.

Page 60: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

60

Focus on eastern Texas. Cigs < 3000 ft are relatively widespread.

Page 61: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

61

Variable RUC20 RUC13

Temp –s.d. East domain 2.8 2.6

Temp – s.d. West domain 3.6 3.3

Dewpoint – s.d. East domain 2.9 2.7

Dewpoint – s.d. West domain 3.5 3.2

12-h surface forecasts verified vs. METAR obs25 Nov 2004 – 18 Jan 2005 - every 3 h (00z,03z,…21z)

20-km RUC (oper) vs. 13-km RUC

- METARs in RUC domain (East/West of 100° W)- RUC13 uses 13km mini topography field derived from 3.3km topo

Page 62: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

62

Rawinsonde verification - wind - RUC13 vs. RUC20

-RUC13 provides improvement in 150-300 mb winds

20km 13km

Page 63: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

63

Rawinsonde verification - RH - RUC13 vs. RUC20

-RUC13 provides much better RH forecasts- With RUC13, 3h RH forecasts are more accurate than 12h RH forecasts (unlike RUC20) GOES and GPS used (more) effectively, physics improved also.

20km 13km

Page 64: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

64

2005 - 13km RUC implementation plan

February-May 2005- Real-time parallel testing – EMC- Intercomparison RUC13 vs. RUC20 by EMC, FSL

- daily inspection w/ graphics, statistics (raob, surface)- Transfer afterward to NCEP/NCO

May-June 2005- Real-time parallel testing – NCO- 4-week field test evaluation – NWS regions, AWC, SPC…- Retrospective testing (at NCEP) for cold season- Report on testing to EMC and NCEP directors

~ June/July 2005- Operational implementation

Page 65: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

65

RUC13 output grids• ~Same products/fields as for RUC20 and RUC40

– Add sfc-based CAPE to best-300mb CAPE

• 20km and 40km look-alike grids – Native (Note: 50 levels instead of 40)

– 25-mb isobaric and 88 2-d grids – 25 2-d variables

• BUFR station time series output– nearly identical to Eta (Exception: 5 soil levels with RUC (out of

actual 6) compared to 4 with Eta/NAM model)– RUC13 – station files with all output time (as with RUC20)- RUC13 – improved land/water matching (important for coastal

stations)• Continue RUC web forum for questions (under RUC web site)

• Continue RUC hot backup – transition to 13km

Page 66: The 13km RUC - Nearing Implementation at NCEP Changes, testing, plan Aviation Weather Center – Monday 16 May 2005 Stan Benjamin John Brown Kevin Brundage

66

2005- Implementation of 13km RUC in operations at NCEP

• Assimilation of new observations - GPS-precipitable water improved moisture forecasts

- METAR cloud/vis/current weather improved ceiling and vis fcsts

- Mesonet, RASS temperatures2005Soil moisture/temp nudging2006Improved moisture analysis – pseudo-RH instead of

log q2007Model changes – New versions of - mixed-phase cloud microphysics (NCAR-FSL) - Grell-Devenyi convective parameterization

- Revised radiation – cloud effects- Corrected treatment of frost formation

improved icing and convection forecasts, cloud/sfc temp, vis forecasts

• Improved post-processing – visibility, precip type, 20km/40km look-alike

• Hourly forecasts to be extended to 9h from 3h duration

(at 01z, 02z, 04z, 05z, …)(12h forecasts to be continued at 00z, 03, 06… init

times)