THARS Training CenterTHARS Training CenterGitega, BurundiGitega, Burundi
Design by Design by
Engineering Ministries International (EMI)Engineering Ministries International (EMI)
Februrary 10, 2007Februrary 10, 2007
![Page 2: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/2.jpg)
Engineering Ministries Engineering Ministries InternationalInternational
“Designing a World of Hope”“Designing a World of Hope”
Mobilizing volunteer engineers, architects and surveyors to Mobilizing volunteer engineers, architects and surveyors to design projects in developing countries that help the poor design projects in developing countries that help the poor and advance the kingdom of God.and advance the kingdom of God.
We design: schools, hospitals, orphanages, training We design: schools, hospitals, orphanages, training centers, water systems, bridges….centers, water systems, bridges….
Have designed 600 projects in 80 countries in 25 yearsHave designed 600 projects in 80 countries in 25 years Volunteer design professionals Volunteer design professionals Sending Offices in: USA, CanadaSending Offices in: USA, Canada
Field Offices in: Uganda, India, GuatemalaField Offices in: Uganda, India, Guatemala
![Page 3: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/3.jpg)
Trauma Healing and Trauma Healing and Reconciliation Services Reconciliation Services
(THARS)(THARS)Reconciling: mankind to God, man to man, through the Reconciling: mankind to God, man to man, through the
forgiveness of Christ.forgiveness of Christ.
Gitega Training Center – healing the heart of AfricaGitega Training Center – healing the heart of Africa
““Blessed is the nation whose God is the Lord, the people he Blessed is the nation whose God is the Lord, the people he chose for his inheritance…chose for his inheritance…
No king is saved by the size of his army; no warrior escapes by No king is saved by the size of his army; no warrior escapes by his great strength…his great strength…
The eyes of the Lord are on those who fear him, The eyes of the Lord are on those who fear him, on whose hope is in his unfailing love,on whose hope is in his unfailing love,to deliver them from death and keep them alive in famine.”to deliver them from death and keep them alive in famine.”
- Psalm 33:12 – 22- Psalm 33:12 – 22
![Page 4: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/4.jpg)
Existing SiteExisting Site 2+ hectare site given by Governor of Gitega2+ hectare site given by Governor of Gitega
Very peaceful with beautiful views Very peaceful with beautiful views – conducive to healing – conducive to healing
![Page 5: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/5.jpg)
Temporary Administration Building
PropertyBoundary
Chapel (foundation)
Ravine
![Page 6: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/6.jpg)
Phase I - ScopePhase I - Scope finish construction of:finish construction of:
- temporary Administration Building - temporary Administration Building - Chapel for 100 people - Chapel for 100 people
Listening Building - for 6 people + Listening Building - for 6 people + 6 Student Cottages – for 16 students each6 Student Cottages – for 16 students each 1 Trainer Cottage – for 8 trainers1 Trainer Cottage – for 8 trainers Director’s HomeDirector’s Home Basketball and Volleyball courtsBasketball and Volleyball courts Boundary WallBoundary Wall
![Page 7: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/7.jpg)
Site MasterplanSite Masterplan
![Page 8: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/8.jpg)
North
Temp Admin(under constr)
Chapel(under constr.) Meeting Hall
GroupTherapy
Dining Hall
StudentCottages
Admin. StaffCottages
TrainerCottage
ListeningRoom Bldg
Director’sHouse
Admin
LEGEND
Red - Under Construction
Yellow - Phase I
Black - Phase II
![Page 9: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/9.jpg)
Listening Rooms BuildingListening Rooms Building6 listening rooms6 listening rooms
1 agitated person room1 agitated person room1 bedroom1 bedroom1 bathroom1 bathroom
![Page 10: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/10.jpg)
![Page 11: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/11.jpg)
Student CottagesStudent Cottages
![Page 12: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/12.jpg)
![Page 13: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/13.jpg)
Elevation – student cottageElevation – student cottage
![Page 14: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/14.jpg)
Trainer’s CottageTrainer’s CottageSame layout as student Same layout as student
cottagescottages
2 trainers / room x 4 rooms2 trainers / room x 4 rooms
![Page 15: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/15.jpg)
Director’s HouseDirector’s House
![Page 16: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/16.jpg)
![Page 17: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/17.jpg)
Elevation – director’s houseElevation – director’s house
![Page 18: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/18.jpg)
Structure of BuildingsStructure of Buildings Reinforced concrete frame with Reinforced concrete frame with
confined brick wallsconfined brick walls Roof of wood or steel trusses with Roof of wood or steel trusses with
metal roof and wooden drop ceilingmetal roof and wooden drop ceiling
![Page 19: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/19.jpg)
Structure of BuildingsStructure of Buildings
Use best practices of Use best practices of BurundiBurundi
Typical construction is Typical construction is good. Be sure to use good. Be sure to use best practices, best practices, including: including:
Grade beam at bottom Grade beam at bottom of wallsof walls
Cement mortar beds Cement mortar beds near wall ends & near wall ends & openingsopenings
Concrete bond beam Concrete bond beam over doors and over doors and windows.windows.
![Page 20: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/20.jpg)
New Structural IdeasNew Structural Ideas
EMI EMI design design slightly slightly stronger stronger frame frame members members and steeland steel
22ndnd bond bond beam at beam at top of wall top of wall below roofbelow roofTypical Concrete Frame
![Page 21: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/21.jpg)
Water Quality & Water Water Quality & Water StorageStorage
![Page 22: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/22.jpg)
Waste-Water DisposalWaste-Water Disposal
![Page 23: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/23.jpg)
Storm waterStorm water
![Page 24: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/24.jpg)
Electrical PowerElectrical Power
Generator vs. Municipal PowerGenerator vs. Municipal Power
Site DistributionSite Distribution
![Page 25: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/25.jpg)
Cost EstimateCost Estimate
Phase I:Phase I: BIF 555,000,000BIF 555,000,000 ($US 555,000)($US 555,000)
Phase II:Phase II: BIF 275,000,000BIF 275,000,000 ($US 275,000)($US 275,000)
TOTAL:TOTAL: BIF 830,000,000BIF 830,000,000 ($US 830,000)($US 830,000)
![Page 26: THARS Training Center Gitega, Burundi Design by Engineering Ministries International (EMI) Februrary 10, 2007](https://reader035.vdocuments.us/reader035/viewer/2022062409/56649dcf5503460f94ac37cc/html5/thumbnails/26.jpg)
OutputOutput
Funding Brochure – by April 15Funding Brochure – by April 15 – see Brazil orphanage example – see Brazil orphanage example
Construction Report – by Aug 15Construction Report – by Aug 15 - see Burundi YFC example - see Burundi YFC example