19th National Award for Excellence in Energy Management-
GMR Hyderabad International Airport Ltd.
Mr. Vijay Rathod –HOD Engineering (EM-EA)
Mr. Bixam Bhukya – Manager- Electrical
Mr. Nalin Jaswal- Sr. Engineer
1
GMR 63%
GoTS13%
GoI13%
Malaysia11%
Company Profile
• Based on the PPP model & structured on –BOOT; Project Completed in Record time of 31Months
• Commenced Operations -March 23, 2008• Designed Capacity :- Terminal -12 Million Passenger Per Annum (MPPA)
Cargo -1.5 Lakh MT /Annum respectively• Present operating :- 18.3 + MPPA• Cargo handling capacity is 1.4 Lakh MT/Annum
“GMR Group will be an institution in perpetuity that will build entrepreneurial organizations making a difference to society through creation of value”
2
Building Specifications
• Natural lighting during day time through Façade and Temple leaf structure in the roof.
• Curved & Corrugated, structure around the Passenger Terminal provides resistance from sunlight.
• Good thermal insulation properties for entire Terminal glass facades:-
U-value = 1.4 W/m²K, SC =0.47
3
2014-15 2015-16 2016-17 2017-18
Pax (MPPA) 10.5 12.49 15.21 18.29
Million Units 31.05 30.72 28.51 28.1
10.5
12.49
15.21
18.2931.05
30.72
28.51
28.1
26.52727.52828.52929.53030.53131.5
02468
101214161820
Pax
In M
illio
ns
Pax & Net Units
Passengers ,ATMs & Specific Energy Consumption
4
Benchmark –Power & Emissions
*Source –Internet & Internal Source
2
4.11
2.872.46 2.32 2.52
2.01 1.692.6
2.131.53 1.21
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
EuropeanAirport(2014)
Heathrow(2014)
Incheon(2014)
DIAL(2015)
DIAL(2016)
BIAL(2015)
BIAL(2016)BIAL(2017) HIAL(2014)
HIAL(2015)
HIAL(2016)
HIAL(2017)
kgC
O2
e/P
ax
Carbon Intensity kgCO2e/Pax
3.2
2.041.38
1.7 1.54
Mumbai MAA BIAL DIAL HIAL
Domestic Airport kWh/Pax(2017-18)
6.4
42.86
1.54
Heathrow Hong Kong Atlanta HIAL
International Airport kWh/Pax(2017-18)
5
In spite of the Robust Growth…
Energy Saving Projects 2015-16 Investment & ZERO Fund Investment
S
NoEnergy Saving Project
Investment
Million INR
Saving
MU
Savings
Million
INR
1 Softener Installed for Cooling towers 0.55 0.08 0.61
2 Wash Rooms LED Conversion - Passenger Terminal 0.50 0.06 0.45
3 LED conversion of Street Lighting(SV 250W to 90W LED) 0.31 0.02 0.14
4 Installation of Condenser Evaporative Cooling System -Chiller 0.05 0.01 0.09
5 Replacement of 150W and 75 W SV with 90W and 45W LED lamps 3.20 0.08 0.56
6 LED for AGL signage boards 0.21 0.03 0.21
7 Up gradation of Arrival Baggage system 200 8.35 60.53
TOTAL 204.82 8.63 62.59
6
1 Adjustment of Cooling Towers Fan Blade angle 0.14 1.01
2 Chilled Water Pipe line modification and Balancing for PSOB Chillers 0.08 0.56
3 Switch off Return Air Fans in Passenger Terminal 0.38 2.7
4 Arresting of AHU Canvas/Duct joint/Collar Leakages 0.01 0.1
5 Installation of VFDs to AHUs 0.08 0.56
6 AHU Frequency Optimization during winter 0.65 4.7
TOTAL 1.34 9.63
ZERO Fund -Investment Projects
Energy Saving Projects 2016-17 Investment
S No Energy Saving ProjectInvestment
Million INRSaving MU
Savings
Million INR
1 LED Conversion of High Mast Lighting 23.9 1.78 12.8
2 LED Conversion of internal and terminal lighting 20.60 0.95 6.87
3 Replacement of Old Split AC with Inverter AC 14.0 0.38 2.73
4 LED conversion of road light –Perimeter & Road 4.62 0.18 1.31
5 Replacement of conventional fans to Super Fans 1.38 0.15 1.11
6 Nature Switch -Controlling High Mast & Outdoor Light 0.32 0.14 1.04
7 Taxiway edge light conversion 1.67 0.07 0.50
8 Main Access Road LED conversion 14.76 0.07 0.48
9 Replacement of energy efficient pumps 0.65 0.03 0.24
10 Rectification of Duct Leakages – HVAC 0.50 0.03 0.21
11 Replacement of condenser water line 1.50 0.03 0.19
TOTAL 83.9 3.81 27.48
7
8
Total Projects 2017-18 - Saving 2.2 MU & INR 1.7Cr
IE 3 Pumps & VFD -0.6 L kW
LED Signage-0.7 L kWh
Phase 2 Super fans -1.5 L kWh
4th Phase LED -2.5 Lakh kWh
Phase 2 – Inverter AC -2.9 Lakh kWh
Chiller plant optimizer- 4.5 Lakh kWh
Electronically Commutated Fans –
8.9 Lakh kWh
FY Saving Million
kWh
Saving
INR Crore
2014-15 1.15 1.01
2015-16 9.9 7.2
2016-17 3.8 2.7
Total 14.85 10.91
Projects Worth INR 8 Cr were accomplished
in FY 2017-18 incurring Saving of
2.2 MU & INR 1.7Cr
9
Load Sharing
11%
26% 25%
Solar Contribution in Energy Journey
2015-2016 2016-2017 2017-2018
10
Project Title :- AHU Condensate Recovery
HVAC Operations consumes enormous
quantity of - Power and Water
System of Terminal Building comprises of
Water Cooled Chiller System & Chilled
Circuit , it contains 103 no’s Air Handling
Units and FCUs
Instead of draining out the condensate ,we
recovered it and feed to Chiller condenser-
Cooling tower circuit
Hereby helping in saving Water and
improving Chiller Efficiency.
“A general thumb rule is that 0.1 to 0.3
gallons(US) of condensate water produced
for every Ton-hour “
Advantages of INNOVATIVE Solution:- Saving 36 KL Water / Day (Temp 20 ℃)
Chilled water potential in increasing chiller
efficiency
Intangible Benefits :-
Reducing water treatment chemical cost
Savings Achieved: Annual Electricity Saving :-2.79 Lakh kWh-
6.7 Lakh INR(Dec17 -March18)
Annual Water Saving 13 140 KL –
8 Lakh INR (Dec17 –Mar18)Idea Source :-Energy Review –EnCOn Team
Replication Potential :- Yes
EnCon Innovative Project 01 :- AHU Condensate Recovery
Before After
11
EnCon Innovative Project 02 – Micro Hydro Turbine
Project Title :- Water Turbine
In process of transferring rain water
from reservoir to open wells (Distance
8 Km) , Pipelines of the Destination
Reservoirs were getting burst due to
extreme pressure in the line
Hydel Micro Turbine installed in
Bypass line to save pipelines &
Generate Power
Constraint :-
Pipeline Bursting and Leakage
Wastage of water
Benefits After Turbine Installation:- Pipe Damage Issue resolved
Power Generation of 264 kWh enough
for Lighting Nearby Pump House
Intangible Benefits :-
Reduction in Water wastage &
Maintenance Manpower as Pipe
Damaging Resolved Savings Achieved:264 kWh
Idea Source :-Continuous Pipe Failure ,Incurring maintenance cost & Aim to utilize the free Natural Resource
Replication Potential :-Rare , If same Geographical Condition is present than SURE GO
12
EnCon Innovative Project 03 – Chiller Plant Optimizer
Project Title :- Chiller Plant Optimizer
Airport has huge requirement of HVAC
& it’s the main energy guzzler of all the
Electrical Load in the Terminal
Installed SCADA based Chiller Plant
Optimizer for 7 No's of Chillers & their
respective Cooling towers
It optimizes the temperature by
switching chillers ON/OFF by RLA
Savings Achieved: 4.5 Lakh Units – 3.3 Million (INR) Annually
Idea Source :- Energy Review – EnCon Team
Replication Potential :- Yes
13
EnCon Innovative Project 04 – Electronically Commutated Fans
Project Title :- Electronically Commuted Fans
HVAC System consist of 103 No's of Air Handling Units which comprise of 402 No's of Supply & Return Fans
Fans with AC 3 Phase induction motor are now replaced with Brushless DC Motor
Constraint with Previous System :-
More Power Consumption Ageing Factor
Freedom Achieved with New System :-
Less Power consumption without impacting output
Low Maintenance Savings Achieved: 8.9 Lakh Units – 6.5 Million (INR)
Idea Source:- Energy Review 10 Year old Equipment –Maintenance as well as High Energy Consumption
Replication Potential :- Yes
14
Innovative Approach for Process Improvement
Fly Tag-less
Roving Agent
Round Clock-PSA
E Boarding
New Baggage Belt
Auto Tray Retrieval
System
20 No’s of New Stands
Reorientation & Re Shaping Lanes
15
Renewable Energy Generation – Solar + Hydel !!
Title :- Solar Plant (5 + 5 MW ) 5 MW solar Plant was installed in the year
2015 & In 2018 we Commissioned another 5 MW solar plant at our premises
Contribution of 25 % of Airport Consumption
RGIA -one of the few airports in the country to have 10 MWp Solar Plant at their Site
SAVING 6 Million
KgCO2 From Single
Solar Plant !!!!
Title :- Hydel Turbine
264 kWh per Annum
16
Waste Management
Total Waste generated
(2554 MT)
Food waste to
Selco (1718MT)
Food waste to compost (723 MT)
Manure
Biomedical waste (3 MT) to
authorized agency
Plastic waste for recycling (27 MT)
Hazardous waste
(10146 ltr) Govt Body
E-waste (7.4MT) to authorized recycling
facility
Glass waste for recycling (22 MT)
Paper waste for recycling (45 MT)
Metal waste for recycling
(4 MT)
Compost Preparation
MSTC Certified VendorsIndian Tar Coal Company & NAS Oil
17
GHG Emissions
3084528865 28598
2519527350
25756 25267
22102 20929
0
5000
10000
15000
20000
25000
30000
35000
2009 2010 2011 2012 2013 2014 2015 2016 2017
Total GHG scope 1&2 emissions in TCO2e
4.86
3.96
3.403.01 3.14
2.6
2.13
1.531.21
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
2009 2010 2011 2012 2013 2014 2015 2016 2017
Carbon intensity kgCO2e/pax.
116 124 133169
240 250 265
0
50
100
150
200
250
300
CY 2011 CY 2012 CY 2013 CY 2014 CY 2015 CY 2016 CY 2017
GHG sink in Ton of CO2e
124965 129864138566
150514
170203186095
0
20000
40000
60000
80000
100000
120000
140000
160000
180000
200000
2012' 2013' 2014' 2015 2016 2017
Scope 3 emissions in TCO2e
18
884
1516
1718
0.0152
0.0260
0.0295
0.0000
0.0050
0.0100
0.0150
0.0200
0.0250
0.0300
0.0350
0
200
400
600
800
1000
1200
1400
1600
1800
2000
2015-16 2016-17 2017-18
Food Waste (MT) VS MW /Year
Food Waste (MT) MW/Yr
Public Disclosure on GHG Emission & Energy Policy
GHG Inventorisation & Waste Material Fuel
19
Green Supply Chain
Critical Spare Material –Pump & Lighting Gear were earlier purchased from Germany & Spain .
Developing a localized vendor helped in both ‘Make in India’ Initiative as well as in mitigating CO2 Emission
20
EnCon Team - Monitoring & Budget
Management
Energy Policy
Energy Team Energy Coordinators
DO
CHECKACT
PLAN
Execute Action Plan
Identify Opportunities
Plan
Review, Improve & Reward
Measure & Analysis
Continual
Improvement
205
83.88
80.309
0 50 100 150 200 250
2015-16
2016-17
2017-18
Budget - EnCOn Projects (Million)
BHS (Process) 200 Million INR
% Investment for Energy conservation projects is
0.6% of Annual Airport Turnover
21
Energy Monitoring –Best Practice
Web Based Temperature Monitoring – Terminal 36 Key Locations
Thermography Monitoring Transformers & AGL Lighting Panels
Alert SMS for Incr. or Decr. of Temp.Solar Plant - Energy Generated in 24 Hrs.
Daily Monitoring Power Consumption & Comparing with same date last year
22
Converting Wind Direction Indicators to LED150 W halogen (4 No's ) to 30 W LED(4 No's)
Reducing Power consumption by 80%
KAIZEN- EnCon Innovative Project by Technicians
Exhaust Duct
Modification of Duct Increased ACH
Nature Switch
Infrared based space grade lighting sensors
23
Remote Monitoring of Buildings
Monitoring Temperatures consecutively saving Power
GSM Based configuration with alert mechanism for Nature Switches
Digitalizing the Nature Switches
KAIZEN- EnCon Innovative Project by Supervisor
Sensors –Escalator
Escalator -Idle for few minutes , will go in energy saving mode
24
KAIZEN- EnCon Innovative Project by Team
Remote Operation of Pumps and Automatic
Filling of Water Storage Tank
Automatic Control – Reduced Manual
Intervention
LE
LED Conversion of Auditorium with
Lighting Sensors
Regulating Luminous Intensity with Controller
Low Cost Innovation –
Booster Fans in Binnacle
Increase in Air Flow without impact on Chiller
kWh
25
Trainings ,Improvements & Implementation of ISO 50001
Certified for ISO 50001:2011 from 2011Verification Audit every yearRecertification Audit Every 3 Year
22 No's of Professionals are now Internal Auditor for Energy Management System- ISO 50001
Trained & Certified by Bureau Veritas
Improvement Improvement Carried
Continuous Improvement Project (CIP) 7 No's of Project – Group Level Competition
Small Improvement Projects (SIP) 75 No’s of SIPs
Ideas 23 No's of Star / Star Team of the Month from Engineering Team
Kaizens 100+ Kaizens
Knowledge Sharing 43 No’s of Session through Aviation Academy and GMR Group
26
Water - Net Consumption L / Pax
Key Water Conservation Initiatives:
• Water efficient appliances and equipment
• Creating awareness among the Airport
Community
• Wastewater reuse and recycling (STP 2*925KLD)
• Rainwater runoff use
• Water Balancing study and Pressure Control
• Push type taps with aerators installed
• Less water consuming plantation in Landscape
Area
• Use of Drip irrigation
• Recharge of Open Wells & Bore wells
• Topographical Study of Airport Land &
Creation of reservoirs for rainwater usage
Meeting 67% of total water requirement
through internal water resources
2015-16 2016-17 2017-18
Pax Million 12.49 15.21 18.29
Lit/Pax 45 38 34
12.49
15.21
18.29
45
38
34
0
5
10
15
20
25
30
35
40
45
50
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
18.00
20.00
Pax
In M
illio
ns
Pax Vs Water Consumption
27
Reservoirs @ GHIAL – Achieving Water Neutral Status
Based on Hydrological studies, GHIAL has
developed storm water storage reservoirs at
various locations.
Salient Features
Reservoir 1:
Holding Capacity – 1.35 Lakh CuM
Detention Pond :- 0.35 Lakh CuM
Combined Area :- 15 Acre
Purpose :-
Collect Storm Water from Runways & used for
recharge
Reservoir 2 – Newly Constructed FY 2017-18
Holding capacity – 6.00 Lakh CuM
Area :- 70 Acre
Purpose :-
Collection of Storm water , Ground water recharge
,Flood Control , Usage for Domestic Needs
28
Honors and Certificates
Certifications: EnMS – ISO 50001: 2011
(Certified Till -2020)
GHG - ISO 14064: 2006
QMS - ISO 9001: 2008
EMS - ISO 14001: 2004
OHSAS - 18001: 2007
CRM - ISO 10002: 2014
ISMS - ISO 27001: 2005
ITSM - ISO 20001: 2011
LEED Certification- “Silver
Rating”
Airport Carbon Accreditation
– Level 3+ Neutrality
British Safety Council
Major Accolades:CII – 5S excellence Award Golden Peacock Award - BE
CIP- Power Group Level -1st Award CII Energy Efficient Unit 2016
CII Excellent Energy Efficient Unit 2014,2015 & 2017
29
Thank You