Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87 th Annual WEFTEC Conference September 30, 2014 Dan Bunce, P.E., PMP and Victoria Pilko, PMP

Upload: others

Post on 03-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA

87th Annual WEFTEC Conference

September 30, 2014

Dan Bunce, P.E., PMP and Victoria Pilko, PMP

Page 2: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

Orange County Sanitation District (OCSD) BackgroundVictoria Pilko, PMP

Page 3: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

OrangeCountyOrangeCounty

Ocean Pipeline

Reclamation Plant No. 1

Treatment Plant No. 2

NewportNewportBeachBeach

FountainFountainValleyValley

Santa AnaSanta Ana

Los Los AlamitosAlamitos

Buena Buena ParkPark

FullertonFullerton

TustinTustin

Garden GroveGarden Grove

La HabraLa HabraBreaBrea

PlacentiaPlacentia Yorba LindaYorba Linda

AnaheimAnaheimAnaheimAnaheim

OrangeOrange

La PalmaLa PalmaCypressCypress

WestminsterWestminster

IrvineIrvine

StantonStantonVillaVillaParkPark

CostaCostaMesaMesa

HuntingtonHuntingtonBeachBeach

SealSealBeachBeach

OCSD Service Area572 miles of sewers200 million gallons per day15 pumping stations2 treatment plants

471 square miles

2.6 million population

21 cities

3 special districts

Page 4: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

Wastewater Conveyance Summary

• Full secondary treatment was achieved in 2011 Headwork capacity P1 = 280 MGD,

P2 = 317 MGD Outfall pumping capacity (Long

outfall 480 MGD, Short outfall 240 MGD)

• Disinfection of final effluent began in 2002

• 23 megawatts of power generation - enough to power 20,000 houses

• 750 average wet tons of biosolidsare processed per day

OCSDcollects/treats about 198 million gallons of wastewater every day.

The flow received is about 80% municipal and 20% industrial.

Page 5: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

Newport Force Main Project BackgroundVictoria Pilko, PMP

Page 6: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

6

Newport FM is a very Critical Element of the OCSD Collection System

Page 7: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

Project ChallengesDan Bunce, P.E., PMP

Page 8: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

Holistic Rehabilitation was Needed Consequences of Failure are Too High

Brown and Caldwell | 87th Annual WEFTEC Conference 8

Community Impacts

EnvironmentalImpacts

EconomicImpacts

Page 9: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

9

Major Businesses Along the Alignment

Page 10: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

Bike Community

10

Page 11: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

Vehicle, Bike, and Pedestrian Traffic Needed to be maintained

11

Page 12: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

Technical Challenges

Brown and Caldwell | 87th Annual WEFTEC Conference 12

Sewer Pressure Cured-in-place-pipe (CIPP ) used for 50% of the Rehabilitation

• Needed to maintain hydraulic capacity

• Full structural solution was required

• Minimize use of corrosive material

• Limited industry experience in Pressure Sewer CIPP Applications

Page 13: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

Other Technical Challenges

Brown and Caldwell | 86th Annual WEFTEC Conference 13

Bridge and Deep Storm Drain Crossings required Microtunnel

Page 14: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

Hydraulic Constraints

Page 15: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

Innovative Solutions NeededDan Bunce, P.E., PMP

Page 16: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

Focused Disciplines Needed to Deliver the Innovation• Urban Trench Pipeline Design

• Pressure Sewer Cured-in-Place-Pipe Engineers

• Tunneling Design Engineers

• Geotechnical Engineers

• Groundwater Dewatering Engineers

OCSD called this the “Dream Team”

The Design Team

Brown and Caldwell | 87th Annual WEFTEC Conference 16

Page 17: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

Segment Analysis

Brown and Caldwell | 87th Annual WEFTEC Conference 17

Considered Multiple Renewal Solutions

• Trenchless Rehabilitation• Slipline• CIPP

• Tunneling New Pipe• HDD• Microtunnel• Jack & Bore

• Open-cut New

Page 18: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

The Innovation Resulted in Key Improvements:• Full Redundant Force Main System

• Public and Worker Safety

• Increased System Reliability

• Reduced Community Impact

• Ease of Maintenance

Built to Last for the Next 50 Years

Brown and Caldwell | 87th Annual WEFTEC Conference 18

Page 19: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

#1: Redundancy Built into the System

Step 1:Construct a connection from Lido PS to North Force Main

Step 2:Remove Crossovers and Valves

Step 3:Upsize 4000 ftof South Force Main to eliminate bottleneck

Savings of $2M Net Present value (NPV)

Page 20: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

#2: Common Trench Replacement

Brown and Caldwell | 87th Annual WEFTEC Conference 20

Page 21: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

• 30 year old HDPE Sliplinedin older VCP Gravity pipe

• Uncertain DR and details on installation

• Pipe was constructed under the sidewalk in front of several businesses and driveways

• Pipe is in close proximity to high pressure gas and water lines

#3: Replacement vs Rehabilitation using Business Case Evaluation

Brown and Caldwell | 87th Annual WEFTEC Conference 22

Existing North Force Main

Page 22: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

Alternative 1: Construct a New Pipe in a New Alignment Now

Alternative 2: Defer Construction of New Pipe for 5-10 years

#3: Replacement vs Rehabilitation using Business Case Evaluation

Brown and Caldwell | 87th Annual WEFTEC Conference 23

Page 23: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

Approximately $750k in Savings by replacing now Considering Risk Cost

Brown and Caldwell | 87th Annual WEFTEC Conference 24

Consequence of Failure Cost Annualized Risk CostEmergency Response, Isolation and Cleanup

$ 509,600 $ 47,393

Community Disruption $ 100,000 $ 9,300

Potential Fines $ 500,000 $ 46,500

Potential Property Damage/Loss of Business Claims

$ 3,000,000 $ 279,000

Page 24: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

Acknowledgements

Page 25: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

Additional Core Design Team Members: • Sharon Yin, Project Engineer (OCSD)• Martin Dix, Construction Phase Project Manager (OCSD)• Mark Briggs, Project Design Manager (BC)• Jason Gornall, Senior Pipeline Engineer (BC)• Kelly Derr, CIPP Specialist (BC)• Cherylle Barrido, Specifications and Lead Construction

Support (BC)• Ed Kampbell, CIPP (Jason Consultants)• David Kuan, Traffic Control Engineering, Inc.• Kleinfelder, Geotechnical Engineering• Shannon & Wilson, Groundwater Dewatering Design

Acknowledgements

Brown and Caldwell | 87th Annual WEFTEC Conference 26

Existing North Force Main

Page 26: th Annual WEFTEC Conference Built to Last - Orange County ......Built to Last – Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA 87th Annual WEFTEC Conference September

Questions ?

Dan Bunce, P.E., PMP and Victoria Pilko, PMP