ORIGINAL INITIATIVES:CHAIRMAN & ELECTED OFFICIALS BAN STAGE 2 AIRCRAFT ESTABLISH NIGHTTIME CURFEW ESTABLISH 80,000 POUND LIMIT RAISE FLIGHT FEES REDUCE AIRPORT TRAFFIC BY 10% TO
25 % SAFETY IMPROVMENTS SECURITY UPGRADES
![Page 3: TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c505503460f948f7c71/html5/thumbnails/3.jpg)
INDUSTRY WORKING GROUP: COMMUNITY PLEDGES
VOLUNTARY BAN OF STAGE 2 AIRCRAFT NEW VOLUNTARY CURFEW HOURS
FROM 11PM TO 6 AM. CONFIRM PPR WEIGHT LIMIT OF 100,000
LBS UPGRADE SAFETY PROGRAMS UPGRADE SECURITY PROGRAMS
![Page 4: TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c505503460f948f7c71/html5/thumbnails/4.jpg)
COMMITTEE RECOMMENDATIONS
WORKING GROUP COMMITTEES DEVELOPED A SUBSET OF APPROXIMATELY 30 RECOMMENDATIONS TO SUPPORT THE COMMUNITY PLEDGES.
SUBCOMMITTEES NOISE AND EMISSIONS OPERATIONS SAFETY AND SECURITY REGIONAL ADVOCACY
![Page 5: TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c505503460f948f7c71/html5/thumbnails/5.jpg)
RECOMMENDATIONS PHYSICAL INFRASTRUCTURE:
NEW FAA TOWER EXTENSION OF OVERRUN AREAS INSTALLATION OF BERMS AND PHYSCIAL BARRIERS ESTABLISH REMOTE VERTIPORT ENCLOSED ENGINE RUN-UP AREA INSTALLATION OF VISUAL GLIDESLOPE EQUIP
AIRSPACE/AIRCRAFT APPROACH CLASS B AIRSPACE REVISED TEB APPROACHES ENGINE START UP AND APU POLICY
![Page 6: TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c505503460f948f7c71/html5/thumbnails/6.jpg)
CONTINUATION
OPERATIONAL RECOMMENDATIONS: IMMEDIATE VOLUNTARY BAN ON STAGE 2 LIMIT/PROHIBIT FLIGHT SCHOOLS NON-ESSENTIAL FLIGHT NIGHT CURFEW FEES FOR NIGHT TIME OPERATIONS
SAFETY/EDUCATION: SMS PROGRAM FOR AIRPORT/FBOS/OPERATORS TEB TRAINING MODULE CAPTAIN’S CARD TEB ARR/DPTR COURSE FOR ALL PART 91
OPERATORS
![Page 7: TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c505503460f948f7c71/html5/thumbnails/7.jpg)
CONTINUATION:
SECURITY:
CRIMINAL BACKGROUND CHECKS FOR NEW HIRES STANDARDIZE SURVEILLENCE AND REPORTING
PROCEDURES FOR ALL FBOs UNIFORM AIRPORT WIDE PROCEDURES TO PREVENT
UNAUHTORIZED ACCESS TO AIRCRAFT PROHIBIT UNATTENDED, UNLOCKED AIRCRAFT
![Page 8: TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c505503460f948f7c71/html5/thumbnails/8.jpg)
CONTINUATION:
COMMUNITY OUTREACH:
FORM A UNIFIED MESSAGE CONDUCT A SURVEY PRESENTATIONS TO ORGANIZTIONS – CHAMBER OF
COMMERCE, NJ INDUSTRY AND BUSINESS ASSOC., ETC.
DEVELOP AN ADVERTIZING/MARKETING CAMPAIGN QUARTERLY NEWSLETTER ADOPT A COMMUNITY PROGRAM DEVELOP WEB SITE
![Page 9: TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c505503460f948f7c71/html5/thumbnails/9.jpg)
ACCOMPLISHMENTS:
OCTOBER ’06 ROLLOUT/PRESS CONF. ELECTED OFFICIALS, AIRPORT MANAGEMENT, FBOS,
ASSOCIAITONS, OPERATORS PUBLICLY SIGN PLEDGE TO THE COMMUNITIES
TEB BOOTH AT NBAA : 150 ADDITIONAL SIGNATORS OFFICIAL ANNOUNCMENT OF VOLUNTARY STAGE 2 BAN OFFICIAL ANNOUNCEMENT OF NIGHTTIME CURFEW FROM
11PM TO 6 AM. AIRPORT, FBOs AND 135 OPERATORS COMMITTED TO SMS
PROGRAMS PILOT’S HANDBOOK/CAPTAIN’S CARD DISTRIBUTED TEB BOOTH AT SCHEDULERS/DISPATCHERS CONFERENCE
![Page 10: TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c505503460f948f7c71/html5/thumbnails/10.jpg)
CONTINUATION:
INFRASTRUCTURE/PHYSICAL IMPROVEMENTS
EMAS – ENGINEERED MATERIAL ARRESTING SYSTEM INSTALLED ON RWY 06 - $8 MILLION (FAA/PA FUNDS)
EMAS – UNDER DESIGN FOR RWY 19 APPROACH SLOPE INDICATIORS ON RWY 24 AND 19 RUNWAY END IDENTIFIER LIGHTS ON RWY 1 BERMS INSTALLED ON NORTHEAST SIDE OF AIRPORT RESEARCH UNDER WAY ON NOISE ATTENUATED
ENGINE RUNUP AREA
![Page 11: TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c505503460f948f7c71/html5/thumbnails/11.jpg)
CONTINUATION:
ENGINEERED MATERIAL ARRESTING SYSTEM
![Page 12: TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c505503460f948f7c71/html5/thumbnails/12.jpg)
![Page 13: TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c505503460f948f7c71/html5/thumbnails/13.jpg)
![Page 14: TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c505503460f948f7c71/html5/thumbnails/14.jpg)
![Page 15: TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c505503460f948f7c71/html5/thumbnails/15.jpg)
![Page 16: TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c505503460f948f7c71/html5/thumbnails/16.jpg)
VOLUNTARY STAGE 2 BAN
REDUCTION OF STAGE 2 OPERATIONS LAST QUARTER OF 2005 vs LAST QUARTER OF 2006
![Page 17: TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c505503460f948f7c71/html5/thumbnails/17.jpg)
![Page 18: TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c505503460f948f7c71/html5/thumbnails/18.jpg)
REDUCTION OF NIGHTTIME OPERATIONS
NIGHTTIME OPERATIONS FROM 2300 HOURS TO 0600 HOURS LAST QUARTER OF 2005 COMPARED TO LAST QUARTER OF 2006:
![Page 19: TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c505503460f948f7c71/html5/thumbnails/19.jpg)
![Page 20: TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c505503460f948f7c71/html5/thumbnails/20.jpg)
PROCEDURES AND SAFETY SMS PROGRAMS HAVE BEEN INITATED AT TEB
WITH ALL FBOs and 135 CHARTER OPERATORS SIGNED UP. AIRPORT OPERATIONS IS WORKING WITH NATA ON AN APPROPRIATE AIRPORT PROGRAM.
TETERBORO AIRPORT QUIET FLYING PROGRAM FOR FIXED WING AIRCRAFT
FLIGHT CREW HANDBOOKOVER 3000 DISTRIBUTED AND INTO THE
SECOND PRINTING.
![Page 21: TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c505503460f948f7c71/html5/thumbnails/21.jpg)
COMMUNITY OUTREACH INITIATIVES - 2006
MONITARY AND OTHER DONATIONS: FIRE TRUCK TO HASBROUCK HEIGHTS MONEY FOR MOONACHIE SALT SPEADER RUTHERFORD EDUCATION FOUNDATION 15 - $1000 STUDENT SCHOLARSHIPS SPONCORED SCHOOL “DARE” SOCCER PROGRAM SPONCERED “OFFICER PHIL” SCHOOL PROGRAM IN
MOONACHIE CONTINUED PAYMENTS TO TOWN OF TETERBORO
FOR $6 MILLION WATER PUMP STATION FACILITY PA BOARD APPROVED $1.75 MILLION FOR
MOONACHIE DPW
![Page 22: TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c505503460f948f7c71/html5/thumbnails/22.jpg)
PUBLIC FUNCTIONS TWO AIRPORT BLOOD DRIVES NOISE SYMPOSIUM AND QUIET FLYING AWARDS
LUNCHEON SCHOOL SCHOLARSHIP LUNCHEON MOTORCYCLE RUN FOR SHELTER OUR SISTERS CHARITY UNITED WAY TETERBORO AIRPORT 5K RUN TETERBORO AIRPORT NOISE ABATEMENT ADVISORY
GROUP ANNUAL BBQ AIRPORT WINGS AND WHEELS DAY – 5000 ATTENDEES AIRPORT CAREER DAY (400 KIDS) HASBROUCK HEIGHTS HOLIDAY PARADE TOWN HALL MEETING (CONGRESSMAN ROTHMAN) SANTA AT THE AVIATION HALL OF FAME (TEB)
![Page 23: TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c505503460f948f7c71/html5/thumbnails/23.jpg)
NEXT STEPS PROPOSED POLICY FOR ENGINE STARTUP AND
APU RUN. RESEARCH A NOISE ATTENUATED RUNUP AREA SECUIRTY HARDENING OF PERIMETER UPGRADE SECUIRTY BACKGROUD CHECKS MARKETING AND OUTREACH PROGRAM COMMUNITY NEWS LETTER EDUCATE THE INDUSTRY ON OUR COMMUNITY
PLEDGE PROGRAM CONTINUE TO DEVELOP SMS PROGRAMS KEEP THE MOMENTUM MOVING AHEAD