testing and commissioning jy
TRANSCRIPT
-
8/3/2019 Testing and Commissioning JY
1/39
1
-
8/3/2019 Testing and Commissioning JY
2/39
2
-
8/3/2019 Testing and Commissioning JY
3/39
-
8/3/2019 Testing and Commissioning JY
4/39
4
-
8/3/2019 Testing and Commissioning JY
5/39
5
-
8/3/2019 Testing and Commissioning JY
6/39
6
-
8/3/2019 Testing and Commissioning JY
7/39
7
-
8/3/2019 Testing and Commissioning JY
8/39
8
-
8/3/2019 Testing and Commissioning JY
9/39
Quote is from John C. Maxwell,Ethics 101: What Every Leader Needs to Know, New York:
Center Street, 2003, pp. 5051.
9
-
8/3/2019 Testing and Commissioning JY
10/39
10
-
8/3/2019 Testing and Commissioning JY
11/39
11
-
8/3/2019 Testing and Commissioning JY
12/39
12
-
8/3/2019 Testing and Commissioning JY
13/39
13
-
8/3/2019 Testing and Commissioning JY
14/39
-
8/3/2019 Testing and Commissioning JY
15/39
-
8/3/2019 Testing and Commissioning JY
16/39
-
8/3/2019 Testing and Commissioning JY
17/39
-
8/3/2019 Testing and Commissioning JY
18/39
-
8/3/2019 Testing and Commissioning JY
19/39
-
8/3/2019 Testing and Commissioning JY
20/39
-
8/3/2019 Testing and Commissioning JY
21/39
-
8/3/2019 Testing and Commissioning JY
22/39
-
8/3/2019 Testing and Commissioning JY
23/39
23
-
8/3/2019 Testing and Commissioning JY
24/39
The following describes SELs recommended approach to relay testing and best practices:
1. Perform com rehensive commissioning testing at the time of installation. Use thorou h checklists, simulations, laborator testin ,
and/or field checks to verify the performance of the protection system, including inputs, outputs, and settings.
2. Monitor the relay self-test alarm contact in real time via SCADA (supervisory control and data acquisition) or other monitoring
system. If an alarm contact asserts, take immediate steps to repair, replace, or take corrective action for the alarmed relay.
3. Monitor potential relay failures not detected by self-tests. Specifically, these are logic inputs, contact outputs, and analog (voltage and
current) inputs. Use continuous check of inputs (e.g., loss-of-potential logic) when available. If a secondary relay system is in place, compare
the metering values between the primary and secondary systems.
. , .
validate correct operation of the protection system.
If Steps 1 through 4 are followed, no periodic testing is required.
Many users follow Steps 1 and 2 but do not perform Steps 3 and 4 consistently. In this case, perform periodic testing (e.g., once every ten
years) on portions of the relay not tested by self-tests. This includes injecting known current and voltage signals to verify relay measuring
accuracy, asserting inputs, and pulsing output contacts. This need not include re-verifying settings, plotting time-current curves or mho circles,
etc. These characteristics are verified at commissioning and do not change. This testing may identify the small number of failures not detected
b self-tests (e. ., usin the revious failure rates, testin ever ten ears would detect 0.05% 10 = 0.5% failures).
This philosophy also applies to systems that do not operate frequently (e.g., bus or transformer differential protection).
In some rare applications (installations without SCADA or communications), the self-test alarm is not monitored. This is not recommended.
For these applications, the relays should be tested every one to five years, including the following:
Check that the self-test alarm is not asserted.
Inject known current and voltage signals to verify proper metering.
Assert inputs, and pulse outputs.
This need not include re-verifying settings, plotting time-current curves or mho circles, etc. These characteristics are verified at
commissioning and do not change.
-
8/3/2019 Testing and Commissioning JY
25/39
25
-
8/3/2019 Testing and Commissioning JY
26/39
26
-
8/3/2019 Testing and Commissioning JY
27/39
27
-
8/3/2019 Testing and Commissioning JY
28/39
28
-
8/3/2019 Testing and Commissioning JY
29/39
29
-
8/3/2019 Testing and Commissioning JY
30/39
30
-
8/3/2019 Testing and Commissioning JY
31/39
31
-
8/3/2019 Testing and Commissioning JY
32/39
32
-
8/3/2019 Testing and Commissioning JY
33/39
33
-
8/3/2019 Testing and Commissioning JY
34/39
34
-
8/3/2019 Testing and Commissioning JY
35/39
35
-
8/3/2019 Testing and Commissioning JY
36/39
36
-
8/3/2019 Testing and Commissioning JY
37/39
37
-
8/3/2019 Testing and Commissioning JY
38/39
38
-
8/3/2019 Testing and Commissioning JY
39/39